EP4288849 - CONSTRAINED OPTIMIZATION AND POST-PROCESSING HEURISTICS FOR OPTIMAL PRODUCTION SCHEDULING FOR PROCESS MANUFACTURING [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 10.11.2023 Database last updated on 16.11.2024 | |
Former | The international publication has been made Status updated on 12.08.2022 | Most recent event Tooltip | 01.11.2024 | Supplementary search report | published on 04.12.2024 [2024/49] | 01.11.2024 | Change - classification | published on 04.12.2024 [2024/49] | 01.11.2024 | Change - classification | published on 04.12.2024 [2024/49] | Applicant(s) | For all designated states C3.ai, Inc. 1300 Seaport Boulevard, Suite 500 Redwood City, CA 94063 / US | [2023/50] | Inventor(s) | 01 /
BROWN, Christian S. San Francisco, California 94107 / US | 02 /
PAKAZAD, Sina K. Redwood City, California 94062 / US | 03 /
ZHANG, Zhaoxi Redwood City, California 94063 / US | 04 /
HOLTAN, Timothy P. Redwood City, California 94063 / US | [2023/50] | Representative(s) | Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham B16 8QQ / GB | [2023/50] | Application number, filing date | 22750485.9 | 04.02.2022 | [2023/50] | WO2022US15354 | Priority number, date | US202163145949P | 04.02.2021 Original published format: US 202163145949 P | [2023/50] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2022170123 | Date: | 11.08.2022 | Language: | EN | [2022/32] | Type: | A1 Application with search report | No.: | EP4288849 | Date: | 13.12.2023 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.08.2022 takes the place of the publication of the European patent application. | [2023/50] | Search report(s) | International search report - published on: | US | 11.08.2022 | (Supplementary) European search report - dispatched on: | EP | 31.10.2024 | Classification | IPC: | G06E1/00, G06Q10/06 | [2024/49] | CPC: |
G06Q10/06312 (EP,US);
G06Q10/06313 (EP,US);
G06Q50/04 (EP,US)
|
Former IPC [2023/50] | G06E1/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/50] | Title | German: | EINGESCHRÄNKTE OPTIMIERUNG UND NACHVERARBEITUNGSHEURISTIKEN FÜR OPTIMALE PRODUKTIONSPLANUNG ZUR PROZESSHERSTELLUNG | [2023/50] | English: | CONSTRAINED OPTIMIZATION AND POST-PROCESSING HEURISTICS FOR OPTIMAL PRODUCTION SCHEDULING FOR PROCESS MANUFACTURING | [2023/50] | French: | OPTIMISATION CONTRAINTE ET HEURISTIQUE POST-TRAITEMENT POUR UNE PROGRAMMATION DE PRODUCTION OPTIMALE POUR LA FABRICATION DE PROCESSUS | [2023/50] | Entry into regional phase | 10.08.2023 | National basic fee paid | 10.08.2023 | Search fee paid | 10.08.2023 | Designation fee(s) paid | 10.08.2023 | Examination fee paid | Examination procedure | 10.08.2023 | Amendment by applicant (claims and/or description) | 10.08.2023 | Examination requested [2023/50] | Fees paid | Renewal fee | 21.02.2024 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [Y]US2014031965 (SUN GUFEI [CN], et al); | [XY]WO2020068110 (SIEMENS AG [DE], et al); |