| EP4411821 - TERMINAL STRUCTURE, MANUFACTURING METHOD AND POWER DEVICE [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 05.07.2024 Database last updated on 08.04.2026 | |
| Former | The international publication has been made Status updated on 05.08.2023 | Most recent event Tooltip | 10.03.2026 | Amendment by applicant | Applicant(s) | For all designated states Hubei Jiufengshan Laboratory B4-5F, Future City East Lake High-Tech Development Zone Wuhan, Hubei 430070 / CN | [2024/32] | Inventor(s) | 01 /
YUAN, Jun Wuhan, Hubei 430070 / CN | [2024/32] | Representative(s) | KASTEL Patentanwälte PartG mbB St.-Cajetan-Straße 41 81669 München / DE | [2024/32] | Application number, filing date | 22923340.8 | 18.10.2022 | [2024/32] | WO2022CN125791 | Priority number, date | CN20221085312 | 25.01.2022 Original published format: CN202210085312 | CN202220207437U | 25.01.2022 Original published format: CN 202220207437 U | [2024/32] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2023142540 | Date: | 03.08.2023 | Language: | ZH | [2023/31] | Type: | A1 Application with search report | No.: | EP4411821 | Date: | 07.08.2024 | Language: | EN | [2024/32] | Search report(s) | International search report - published on: | CN | 03.08.2023 | (Supplementary) European search report - dispatched on: | EP | 09.09.2025 | Classification | IPC: | H10D62/10 | [2025/41] | CPC: |
H10D62/105 (EP);
H10D62/104 (US);
H10D30/655 (EP);
H10D30/665 (EP);
H10D62/10 (EP);
H10D62/106 (EP,US);
H10D62/107 (EP);
H10D62/60 (EP);
H10P30/204 (US);
|
| Former IPC [2024/32] | H01L29/06, H01L21/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, ME, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2024/32] | Title | German: | ANSCHLUSSSTRUKTUR, HERSTELLUNGSVERFAHREN UND LEISTUNGSVORRICHTUNG | [2024/32] | English: | TERMINAL STRUCTURE, MANUFACTURING METHOD AND POWER DEVICE | [2024/32] | French: | STRUCTURE DE BORNE, PROCÉDÉ DE FABRICATION ET DISPOSITIF D'ALIMENTATION | [2024/32] | Entry into regional phase | 30.04.2024 | Translation filed | 30.04.2024 | National basic fee paid | 30.04.2024 | Search fee paid | 30.04.2024 | Designation fee(s) paid | 30.04.2024 | Examination fee paid | Examination procedure | 30.04.2024 | Examination requested [2024/32] | 06.03.2026 | Date on which the examining division has become responsible | Fees paid | Renewal fee | 05.08.2024 | Renewal fee patent year 03 | 29.10.2025 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [YA] US9202940 (KAWAKAMI TSUYOSHI et al.) [Y] 1,9,11-12 * Fig. 3 and correlated text * * Fig. 8 and correlated text *[A] 2-8,10,13-14 | [Y] US2018040688 (KOBAYASHI YUSUKE et al.) [Y] 1,9,11-12 * Fig. 16 and correlated text * |