blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4216608

EP4216608 - METHOD AND APPARATUS FOR RRC STATE TRANSITION [Right-click to bookmark this link]
StatusGrant of patent is intended
Status updated on  17.04.2024
Database last updated on 06.07.2024
FormerExamination is in progress
Status updated on  17.11.2023
FormerRequest for examination was made
Status updated on  20.10.2023
FormerThe application has been published
Status updated on  23.06.2023
Most recent event   Tooltip05.07.2024New entry: Receipt of the translation of the claim(s) 
Applicant(s)For all designated states
FG INNOVATION COMPANY LIMITED
Flat 2623, 26/F Tuen Mun Central Square
22 Hoi Wing Road, Tuen Mun
New Territories
Hong Kong / HK
[2023/30]
Inventor(s)01 / SHIH, Meiju
Hsinchu 300 / TW
02 / TSENG, Yunglan
Hsinchu 300 / TW
03 / CHEN, Hungchen
Hsinchu 300 / TW
04 / CHOU, Chieming
Hsinchu 300 / TW
 [2023/30]
Representative(s)Müller-Boré & Partner Patentanwälte PartG mbB
Friedenheimer Brücke 21
80639 München / DE
[2023/30]
Application number, filing date23160438.009.08.2019
[2023/30]
Priority number, dateUS201862717747P10.08.2018         Original published format: US 201862717747 P
[2023/30]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP4216608
Date:26.07.2023
Language:EN
[2023/30]
Search report(s)(Supplementary) European search report - dispatched on:EP27.06.2023
ClassificationIPC:H04W76/27, H04W74/08, H04W36/14
[2024/19]
CPC:
H04W76/27 (EP,US); H04W48/20 (US); Y02D30/70 (EP)
Former IPC [2023/30]H04W36/00, H04W36/14, H04W74/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/47]
Former [2023/30]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND VORRICHTUNG FÜR RRC-ZUSTANDSÜBERGANG[2023/30]
English:METHOD AND APPARATUS FOR RRC STATE TRANSITION[2023/30]
French:PROCÉDÉ ET APPAREIL DE TRANSITION D'ÉTAT RRC[2023/30]
Examination procedure18.10.2023Amendment by applicant (claims and/or description)
18.10.2023Examination requested  [2023/47]
18.10.2023Date on which the examining division has become responsible
16.11.2023Despatch of a communication from the examining division (Time limit: M04)
28.02.2024Reply to a communication from the examining division
18.04.2024Communication of intention to grant the patent
04.07.2024Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP19847730.9  / EP3834482
Fees paidRenewal fee
09.03.2023Renewal fee patent year 03
09.03.2023Renewal fee patent year 04
25.09.2023Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
31.08.202305   M06   Fee paid on   25.09.2023
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[IA]  - CATT, "Considerations on acceptable cell with Inactive Mode", vol. RAN WG2, no. Sanya, China; 20180416 - 20180420, (20180406), 3GPP DRAFT; R2-1804276 CONSIDERATIONS ON ACCEPTABLE CELL WITH INACTIVE MODE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5F101bis/Docs/, (20180406), XP051415455 [I] 1,4-15 * page 1 * [A] 2,3
 [A]  - QUALCOMM INCORPORATED, "Inactive to Idle Transition Scenarios", vol. RAN WG2, no. Busan Korea; 20180521 - 20180525, (20180511), 3GPP DRAFT; R2-1806887_INACTIVE_IDLE_FAILURE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5F102/Docs, (20180511), XP051464459 [A] 1-11 * page 1 - page 3 *
 [A]  - HUAWEI ET AL, "Priority Scenarios for RRC_INACTIVE", vol. RAN WG3, no. Athens, Greece; 20180226 - 20180302, (20180217), 3GPP DRAFT; R3-181360, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG3%5FIu/TSGR3%5F99/Docs/, (20180217), XP051401795 [A] 1-11 * page 3, paragraph 3 - page 4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.