EP4271027 - NETWORK PERFORMANCE INFORMATION AND COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 03.05.2024 Database last updated on 21.01.2025 | |
Former | The application has been published Status updated on 29.09.2023 | Most recent event Tooltip | 01.06.2024 | New entry: Renewal fee paid | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2023/44] | Inventor(s) | 01 /
XIN, Yang Shenzhen, 518129 / CN | 02 /
WU, Xiaobo Shenzhen, 518129 / CN | [2023/44] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2023/44] | Application number, filing date | 23164108.5 | 20.05.2019 | [2023/44] | Priority number, date | CN201810491483 | 21.05.2018 Original published format: CN201810491483 | CN201810671611 | 26.06.2018 Original published format: CN201810671611 | CN201910256749 | 01.04.2019 Original published format: CN201910256749 | [2023/44] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4271027 | Date: | 01.11.2023 | Language: | EN | [2023/44] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 05.10.2023 | Classification | IPC: | H04W24/02, H04W28/10, H04W28/02, // H04W24/10 | [2023/44] | CPC: |
H04W28/0247 (EP,US);
H04W28/04 (CN);
H04W28/10 (EP,CN,US);
H04W24/02 (EP);
H04W24/08 (US);
H04W24/10 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2024/23] |
Former [2023/44] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR BESTIMMUNG VON NETZLEISTUNGSINFORMATIONEN UND KOMMUNIKATIONSSYSTEM | [2023/44] | English: | NETWORK PERFORMANCE INFORMATION AND COMMUNICATION SYSTEM | [2023/44] | French: | PROCÉDÉ DE DÉTERMINATION DES INFORMATIONS SUR LA PERFORMANCE DU RÉSEAU ET SYSTÈME DE COMMUNICATION | [2023/44] | Examination procedure | 30.04.2024 | Amendment by applicant (claims and/or description) | 30.04.2024 | Examination requested [2024/23] | 30.04.2024 | Date on which the examining division has become responsible | Parent application(s) Tooltip | EP19806844.7 / EP3817449 | Fees paid | Renewal fee | 24.03.2023 | Renewal fee patent year 03 | 24.03.2023 | Renewal fee patent year 04 | 24.03.2023 | Renewal fee patent year 05 | 31.05.2024 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [A]US2017214536 (WANG SHUO [CN], et al) [A] 1-12 * paragraph [0165] - paragraph [0202]; figures 1,5 * * paragraph [0226] - paragraph [0276]; figures 6-7 *; | [A]WO2017175070 (ALCATEL LUCENT [FR]) [A] 1-12 * paragraph [0192] - paragraph [0239] *; | [A] - GRIGORIOU ELISAVET ET AL, "An Agent-Based QoE Monitoring Strategy for LTE Networks", 2018 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), IEEE, (20180520), doi:10.1109/ICC.2018.8422608, pages 1 - 6, XP033378593 [A] 1-12 * Sections II, III * DOI: http://dx.doi.org/10.1109/ICC.2018.8422608 | [A] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study of Enablers for Network Automation for 5G; (Release 16)", 3GPP STANDARD; TECHNICAL REPORT; 3GPP TR 23.791, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20180502), vol. SA WG2, no. V0.3.0, pages 1 - 19, XP051451264 [A] 1-12 * Section 5.1.5 * | [A] - "3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Study on CT WG3 Aspects of 5G System Phase 1; (Release 15)", (20180326), 3GPP DRAFT; 29890-F10, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fct/WG3%5Finterworking%5Fex%2DCN3/DRAFT%5FSPEC%5FIMPLEMENTATIONS/CT%5F79/, (20180326), XP051412305 [A] 1-12 * Sections 4.2 and 5.4.7 * | [A] - CATT, "Solution for optimizing connection management based on NWDAF output", vol. SA WG2, no. Sanya, China; 20180416 - 20180420, (20180410), 3GPP DRAFT; S2-183685_OPTIMIZING CONNECTION MANAGEMENT BASED ON NWDAF OUTPUT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS C, URL: http://www.3gpp.org/ftp/tsg%5Fsa/WG2%5FArch/TSGS2%5F127%5FSanya/Docs/, (20180410), XP051437986 [A] 1-12 * the whole document * |