blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4236481

EP4236481 - POWER OPTIMIZATIONS FOR TRANSMISSION OPPORTUNITY (TXOP) MONITORING [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  28.07.2023
Database last updated on 14.09.2024
Most recent event   Tooltip01.03.2024The date on which the examining division becomes responsible, has been established 
01.03.2024Amendment by applicant 
01.03.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
[2023/35]
Inventor(s)01 / BHATTAD, Kapil
San Diego, CA, 92121-1714 / US
02 / SUN, Jing
San Diego, CA, 92121-1714 / US
03 / ZHANG, Xiaoxia
San Diego, CA, 92121-1714 / US
04 / THYAGARAJAN, Ananta Narayanan
San Diego, CA, 92121-1714 / US
 [2023/35]
Representative(s)Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
[2023/35]
Application number, filing date23172283.626.03.2019
[2023/35]
Priority number, dateIN20184101108926.03.2018         Original published format: IN201841011089
US20191636365425.03.2019         Original published format: US201916363654
[2023/35]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP4236481
Date:30.08.2023
Language:EN
[2023/35]
Type: A3 Search report 
No.:EP4236481
Date:06.09.2023
Language:EN
[2023/36]
Search report(s)(Supplementary) European search report - dispatched on:EP08.08.2023
ClassificationIPC:H04W72/232, H04W52/02, // H04W74/08, H04W72/566
[2023/36]
CPC:
H04W52/0248 (EP,CN,US); H04W16/14 (CN,US); H04W72/12 (CN);
H04W72/23 (US); H04W72/232 (EP,CN); H04W74/006 (CN,US);
H04W72/566 (EP); H04W74/0808 (EP,US); Y02D30/70 (EP) (-)
Former IPC [2023/35]H04W52/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/35]
TitleGerman:LEISTUNGSOPTIMIERUNGEN ZUR ÜBERWACHUNG VON ÜBERTRAGUNGSGELEGENHEITEN (TXOP)[2023/35]
English:POWER OPTIMIZATIONS FOR TRANSMISSION OPPORTUNITY (TXOP) MONITORING[2023/35]
French:OPTIMISATIONS DE PUISSANCE POUR SURVEILLANCE D'OPPORTUNITÉ DE TRANSMISSION (TXOP)[2023/35]
Examination procedure09.05.2023Examination requested  [2023/35]
01.03.2024Amendment by applicant (claims and/or description)
01.03.2024Date on which the examining division has become responsible
Parent application(s)   TooltipEP19719663.7  / EP3777426
Fees paidRenewal fee
09.05.2023Renewal fee patent year 03
09.05.2023Renewal fee patent year 04
09.05.2023Renewal fee patent year 05
01.03.2024Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XY]  - FUJITSU, "Discussion on time domain resource allocation", vol. RAN WG1, no. Prague, Czech Republic; 20170821 - 20170825, (20170820), 3GPP DRAFT; R1-1712742 DISCUSSION ON TIME DOMAIN RESOURCE ALLOCATION FINAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CED, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170820), XP051315555 [X] 1,3-6,8-15 * Discussion; page 2, paragraph 2 - page 3 * [Y] 2,7
 [YA]  - QUALCOMM INCORPORATED, "TxOP Frame Structure for NR unlicensed", vol. RAN WG1, no. Athens, Greece; 20180226 - 20180302, (20180217), 3GPP DRAFT; R1-1802866 7.6.5 FRAME STRUCTURE FOR NR UNLICENSED, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F92/Docs/, (20180217), XP051398279 [Y] 2,7 * Preparation stage; page 2, paragraph 3 - page 3 * * TxOP Startin/Ending Positions; page 4, paragraph 5 - page 5 * [A] 1,3-6,8-15
 [A]  - ZTE ET AL, "Discusssion on NR operation in unlicensed spectrum", vol. RAN WG1, no. Athens, Greece; 20170213 - 20170217, (20170212), 3GPP DRAFT; R1-1701619 - 8.1.10 DISCUSSION ON NR OPERATION IN UNLICENSED SPECTRUM, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPO, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170212), XP051208786 [A] 1-15 * Minimization of reservation signal with flexible TTI size setting; page 4, paragraph 5.1 - page 5; figure 1 * * Resource allocation; page 5, paragraph 5.2 *
 [A]  - APPLE INC, "NR Unlicensed Considerations", vol. RAN WG1, no. Athens, Greece; 20180226 - 20180302, (20180217), 3GPP DRAFT; R1-1802287 NR UNLICENSED CONSIDERATIONS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F92/Docs/, (20180217), XP051397817 [A] 1-15 * Mini-slot and configurable search space monitoring; page 2, paragraph 2.2 *
 [A]  - ZTE ET AL, "Framework on potential solutions and techniques for NR-U", vol. RAN WG1, no. Athens, Greece; 20180226 - 20180302, (20180217), 3GPP DRAFT; R1-1801466 - 7.6.4 FRAMEWORK ON POTENTIAL SOLUTIONS AND TECHNIQUES FOR NR-U, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F92/Docs/, (20180217), XP051397565 [A] 1-15 * High frequency / Beam-based LBT; page 3, paragraph 4.1.1 - page 4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.