blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4254826

EP4254826 - METHOD AND DEVICE FOR TRANSMITTING AND RECEIVING NETWORK MANAGEMENT INFORMATION, TRANSMITTING APPARATUS AND RECEIVING APPARATUS [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  01.09.2023
Database last updated on 16.11.2024
Most recent event   Tooltip15.05.2024The date on which the examining division becomes responsible, has been established 
15.05.2024Amendment by applicant 
Applicant(s)For all designated states
ZTE Corporation
ZTE Plaza
Keji Road South
Hi-Tech Industrial Park
Nanshan District
Shenzhen, Guangdong 518057 / CN
[2023/40]
Inventor(s)01 / LIU, Feng
Shenzhen, Guangdong, 518057 / CN
 [2023/40]
Representative(s)Ricker, Mathias
Wallinger Ricker Schlotter Tostmann
Patent- und Rechtsanwälte Partnerschaft mbB
Zweibrückenstraße 5-7
80331 München / DE
[N/P]
Former [2023/40]Ricker, Mathias
Wallinger Ricker Schlotter Tostmann
Patent- und Rechtsanwälte Partnerschaft mbB
Zweibrückenstrasse 5-7
80331 München / DE
Application number, filing date23187764.821.03.2018
[2023/40]
Priority number, dateCN20171016965621.03.2017         Original published format: CN201710169656
[2023/40]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP4254826
Date:04.10.2023
Language:EN
[2023/40]
Type: A3 Search report 
No.:EP4254826
Date:15.11.2023
Language:EN
[2023/46]
Search report(s)(Supplementary) European search report - dispatched on:EP17.10.2023
ClassificationIPC:H04J3/16, H04B10/27
[2023/46]
CPC:
H04J3/1658 (EP); H04B10/27 (KR); H04L41/0246 (CN);
H04B10/40 (KR); H04L41/0803 (CN); H04J2203/0058 (EP);
H04J2203/0085 (EP) (-)
Former IPC [2023/40]H04B10/27
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/40]
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM SENDEN UND EMPFANGEN VON NETZWERKVERWALTUNGSINFORMATIONEN, SENDEVORRICHTUNG UND EMPFANGSVORRICHTUNG[2023/40]
English:METHOD AND DEVICE FOR TRANSMITTING AND RECEIVING NETWORK MANAGEMENT INFORMATION, TRANSMITTING APPARATUS AND RECEIVING APPARATUS[2023/40]
French:PROCÉDÉ ET DISPOSITIF D'ÉMISSION ET DE RÉCEPTION D'INFORMATIONS DE GESTION DE RÉSEAU, APPAREIL D'ÉMISSION ET APPAREIL DE RÉCEPTION[2023/40]
Examination procedure26.07.2023Examination requested  [2023/40]
14.05.2024Amendment by applicant (claims and/or description)
14.05.2024Date on which the examining division has become responsible
Parent application(s)   TooltipEP18771607.1  / EP3605881
Fees paidRenewal fee
26.07.2023Renewal fee patent year 03
26.07.2023Renewal fee patent year 04
26.07.2023Renewal fee patent year 05
26.07.2023Renewal fee patent year 06
26.02.2024Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[IA]US2012076139  (TANIZAWA YOSHIMICHI [JP]) [I] 1,2,5,6,8,9,12,13,15 * paragraph [0003] - paragraph [0005] * * paragraph [0018] * * paragraph [0020] - paragraph [0022]; figure 1 * * paragraph [0025] - paragraph [0063]; figures 2, 3, 4A, 4B * * paragraph [0068] - paragraph [0071] * * paragraph [0072] - paragraph [0109]; figures 7,8,9 * [A] 3,4,7,10,11,14;
 [XA]  - OIF, "IA OIF-FLEXE-01.0 Flex Ethernet Implementation Agreement", (20160301), pages 1 - 31, URL: http://www.oiforum.com/wp-content/uploads/OIF-FLEXE-01.0.pdf, (20180314), XP055459137 [X] 1,2,5,6,8,9,12,13,15 * sections 5 to 5.3 and 6.4; sections 7.2.4 to 7.3.1 and 7.3.5; sections 8 to 8.3;; figures 1-6, 11 * [A] 3,4,7,10,11,14
 [A]  - JAMES HUANG JAMES HUANG@HUAWEI COM, "Possible New Work Items for 802.1 Related to OIF Flex Ethernet (FlexE) ; new-flexe-huang-possible-work-0516-v01", IEEE DRAFT; NEW-FLEXE-HUANG-POSSIBLE-WORK-0516-V01, IEEE-SA, PISCATAWAY, NJ USA, (20160523), vol. 802, no. v01, pages 1 - 8, XP068109597 [A] 1-15 * the whole document *
 [A]  - WANG Q ET AL, "RSVP-TE Signaling Extensions in support of Flexible Ethernet networks; draft-wang-ccamp-flexe-signaling-02.txt", RSVP-TE SIGNALING EXTENSIONS IN SUPPORT OF FLEXIBLE ETHERNET NETWORKS; DRAFT-WANG-CCAMP-FLEXE-SIGNALING-02.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARDWORKINGDRAFT, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20160708), pages 1 - 13, XP015114107 [A] 1-15 * sections 3 to 3.5.2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.