| EP4576356 - INTERCONNECTION OF SETS OF ENERGY STORAGE MODULES [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 19.12.2025 Database last updated on 09.04.2026 | |
| Former | The application has been published Status updated on 23.05.2025 | Most recent event Tooltip | 19.12.2025 | The date on which the examining division becomes responsible, has been established | 19.12.2025 | Amendment by applicant | 19.12.2025 | Request for examination filed | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states VOLVO TRUCK CORPORATION 405 08 Göteborg / SE | [2025/26] | Inventor(s) | 01 /
RAGOT, Sebastien 413 11 GÖTEBORG / SE | 02 /
LANDVIK, Sondre 417 61 GÖTEBORG / SE | 03 /
JOHANSSON, Fredrik 462 94 FRÄNDEFORS / SE | 04 /
ERIKSSON, Urban 408 08 GÖTEBORG / SE | 05 /
TAJUDDIN, Mohammad Ansari 417 17 GÖTEBORG / SE | 06 /
ALBERT, Ioana 417 27 GÖTEBORG / SE | 07 /
JONZON, Daniel 436 56 HOVÅS / SE | 08 /
HÖRDER, Jonatan 431 34 MÖLNDAL / SE | [2025/26] | Representative(s) | Kransell & Wennborg KB P.O. Box 2096 403 12 Göteborg / SE | [2025/26] | Application number, filing date | 23219202.1 | 21.12.2023 | [2025/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4576356 | Date: | 25.06.2025 | Language: | EN | [2025/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.06.2024 | Classification | IPC: | H01M50/204 | [2025/26] | CPC: |
H01M50/249 (EP,US);
H01M50/264 (EP,US);
B60K1/04 (EP);
B60L50/64 (EP,US);
F16B35/06 (EP);
F16B5/02 (EP);
F16B5/0642 (EP);
H01M50/204 (EP,US);
H01M50/209 (EP);
H01M50/213 (EP);
H01M50/242 (US);
H01M50/258 (EP,US);
B60K2001/0438 (EP);
F16B33/002 (EP);
F16B35/005 (EP);
F16B37/00 (EP);
F16B7/06 (EP);
H01M2220/20 (EP,US);
Y02E60/10 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, ME, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2025/26] | Extension states | BA | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERBINDUNG VON SÄTZEN VON ENERGIESPEICHERMODULEN | [2025/26] | English: | INTERCONNECTION OF SETS OF ENERGY STORAGE MODULES | [2025/26] | French: | INTERCONNEXION D'ENSEMBLES DE MODULES DE STOCKAGE D'ÉNERGIE | [2025/26] | Examination procedure | 16.12.2025 | Examination requested [2026/04] | 16.12.2025 | Date on which the examining division has become responsible | Fees paid | Renewal fee | 16.12.2025 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [X] DE102013218038 (VOLKSWAGEN AG et al.) [X] 1-3,7,8,10-12 * abstract; figures 1,2,4,6 * * paragraphs [0001] - [0028] , [0042] - [0054]; figures 1-8 * | [X] EP2679482 (NIETO LEON JOSE et al.) [X] 1,2,4,12 * abstract; figures 4,7,12a,16e,37-39 * * paragraphs [0075] , [0129]; figures 1-39 * | [X] CN218548561 (BEIJING SCIENCE & TECH CO THREE FAST ONLINE et al.) [X] 1,9 * abstract; figures 2,4,11 * * figures 1-11 * | [X] US2015214522 (MUCK ALEXANDER et al.) [X] 1,12-15 * abstract; figure 3 * | [I] DE102013200383 (BOSCH GMBH ROBERT et al.) [I] 1-3,5,6,12 * abstract; figures 4-6 * * figures 1-6 * | [I] EP2288815 (HAGENUK MARINEKOMMUNIKATION GMBH et al.) [I] 1,5,12 * abstract; figures 1,4 * * figures 1-4 * | [A] EP3808214 (INFILL CO LTD et al.) [A] 1-15 * abstract; figures 1-3 * | [A] WO2022268324 (VOLVO TRUCK CORP et al.) [A] 1-15 * abstract; figures 2a,2b,3b-d * | [A] US2011259462 (GAIGLER RANDY L et al.) [A] 1-15 * abstract; figures 13,14,16 * * figures 1-16 * |