| EP4559066 - WIND TURBINE AND METHOD FOR OPERATING A WIND TURBINE [Right-click to bookmark this link] | Status | The application has been withdrawn Status updated on 25.07.2025 Database last updated on 11.04.2026 | |
| Former | Request for examination was made Status updated on 25.04.2025 | ||
| Former | The international publication has been made Status updated on 06.04.2024 | ||
| Former | unknown Status updated on 22.09.2023 | Most recent event Tooltip | 25.07.2025 | Withdrawal of application | published on 27.08.2025 [2025/35] | Applicant(s) | For all designated states Siemens Gamesa Renewable Energy A/S Borupvej 16 7330 Brande / DK | [2025/22] | Inventor(s) | 01 /
EGGERS, Jan Rudolf 21640 Bliedersdorf / DE | [2025/22] | Representative(s) | SGRE-Association Siemens Energy Global GmbH& Co. KG SE CD I IP Intellectual Property Siemenspromenade 9 91058 Erlangen / DE | [N/P] |
| Former [2025/22] | SGRE-Association Siemens Energy Global GmbH & Co. KG SE I IM P Intellectual Property Siemenspromenade 9 91058 Erlangen / DE | Application number, filing date | 23769293.4 | 19.09.2023 | [2025/22] | WO2023EP75791 | Priority number, date | EP20220198496 | 28.09.2022 Original published format: EP 22198496 | [2025/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2024068362 | Date: | 04.04.2024 | Language: | EN | [2024/14] | Type: | A1 Application with search report | No.: | EP4559066 | Date: | 28.05.2025 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.04.2024 takes the place of the publication of the European patent application. | [2025/22] | Search report(s) | International search report - published on: | EP | 04.04.2024 | Classification | IPC: | H02J3/28, H02J15/00 | [2025/22] | CPC: |
H02J3/28 (EP);
H02J15/50 (EP);
H02J2101/28 (EP);
H02J2101/30 (EP);
Y02E10/72 (EP);
Y02E60/36 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, ME, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2025/22] | Extension states | BA | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | WINDENERGIEANLAGE UND VERFAHREN ZUM BETREIBEN EINER WINDENERGIEANLAGE | [2025/22] | English: | WIND TURBINE AND METHOD FOR OPERATING A WIND TURBINE | [2025/22] | French: | ÉOLIENNE ET SON PROCÉDÉ DE COMMANDE | [2025/22] | Entry into regional phase | 19.02.2025 | National basic fee paid | 19.02.2025 | Designation fee(s) paid | 19.02.2025 | Examination fee paid | Examination procedure | 19.02.2025 | Examination requested [2025/22] | 19.02.2025 | Date on which the examining division has become responsible | 07.05.2025 | Amendment by applicant (claims and/or description) | 24.07.2025 | Application withdrawn by applicant [2025/35] |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [XI] CN114909871 (UNIV HUNAN et al.) [X] 1,12 * the whole document *[I] 2-11,13-15 | [XI] US2011040421 (DURET ALEXIS et al.) [X] 1,12 * abstract * * paragraph [0006] - paragraph [0009] * * paragraph [0011] * * paragraph [0017] - paragraph [0021] * * paragraph [0023] - paragraph [0024] * * paragraph [0027] - paragraph [0030] *[I] 2-11,13-15 | [XI] CN114024327 (HUADIAN ZHENGZHOU MECHANICAL DESIGN INST CO LTD et al.) [X] 1,12 * the whole document *[I] 2-11,13-15 | [XI] US2014021785 (MUNIER ERIC et al.) [X] 1,12 * the whole document *[I] 2-11,13-15 | [A] HARRISON K. W. ET AL: "The Wind-to-Hydrogen Project: Operational Experience, Performance Testing, and Systems Integration", USDOE, 1 March 2009 (2009-03-01), XP055869915, Retrieved from the Internet DOI: http://dx.doi.org/10.2172/951802 |