blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0094255

EP0094255 - Maximum power capability blanket for nuclear reactors [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.12.1987
Database last updated on 31.08.2024
Most recent event   Tooltip11.12.1987No opposition filed within time limitpublished on 27.01.1988 [1988/04]
Applicant(s)For all designated states
WESTINGHOUSE ELECTRIC CORPORATION
Westinghouse Building Gateway Center Pittsburgh
Pennsylvania 15235 / US
[N/P]
Former [1983/46]For all designated states
WESTINGHOUSE ELECTRIC CORPORATION
Westinghouse Building Gateway Center
Pittsburgh Pennsylvania 15235 / US
Inventor(s)01 / Camden, Thomas Martin, Jr.
RD 1, Raintree Drive
Apollo Pennsylvania / US
02 / Orr, William Lawrence
105 Tall Timber Drive
Ligonier Pennsylvania / US
[1983/46]
Representative(s)Van Berlyn, Ronald Gilbert
30 The Green Calne
Wiltshire SN11 8DJ / GB
[N/P]
Former [1983/46]van Berlyn, Ronald Gilbert
23, Centre Heights
London NW3 6JG / GB
Application number, filing date83302661.011.05.1983
[1983/46]
Priority number, dateUS1982037722711.05.1982         Original published format: US 377227
[1983/46]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP0094255
Date:16.11.1983
Language:EN
[1983/46]
Type: A3 Search report 
No.:EP0094255
Date:28.03.1984
Language:EN
[1984/13]
Type: B1 Patent specification 
No.:EP0094255
Date:04.02.1987
Language:EN
[1987/06]
Search report(s)(Supplementary) European search report - dispatched on:EP27.01.1984
ClassificationIPC:G21C3/32
[1983/46]
CPC:
G21C3/328 (EP,US); G21C3/32 (KR); Y02E30/30 (EP,US)
Designated contracting statesBE,   CH,   DE,   GB,   LI,   SE [1983/46]
TitleGerman:Zone mit maximaler Leistung für einen Kernreaktor[1983/46]
English:Maximum power capability blanket for nuclear reactors[1983/46]
French:Région de puissance maximale pour un réacteur nucléaire[1983/46]
File destroyed:12.06.1999
Examination procedure28.09.1984Examination requested  [1984/50]
17.04.1986Despatch of communication of intention to grant (Approval: )
31.07.1986Communication of intention to grant the patent
30.10.1986Fee for grant paid
30.10.1986Fee for publishing/printing paid
Opposition(s)05.11.1987No opposition filed within time limit [1988/04]
Fees paidRenewal fee
28.05.1985Renewal fee patent year 03
30.05.1986Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]DE1187332  (INTERATOM);
 [A]FR2213560  (WESTINGHOUSE ELECTRIC CORP [US]);
 [A]US3844886  (CROWTHER R)
ExaminationUS3351532
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.