blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0170867

EP0170867 - Process for manufacturing a composite material [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.07.1989
Database last updated on 18.09.2024
Most recent event   Tooltip12.07.1989No opposition filed within time limitpublished on 30.08.1989 [1989/35]
Applicant(s)For all designated states
Vacuumschmelze GmbH
Grüner Weg 37
63450 Hanau / DE
[N/P]
Former [1986/07]For all designated states
VACUUMSCHMELZE GMBH
Grüner Weg 37 Postfach 2253
D-63412 Hanau / DE
Inventor(s)01 / Reppel, Georg Werner, Dipl.-Phys.
Goldbergstrasse 4
D-6451 Hammersbach 2 / DE
[1986/07]
Application number, filing date85108013.528.06.1985
[1986/07]
Priority number, dateDE1984342691621.07.1984         Original published format: DE 3426916
[1986/07]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP0170867
Date:12.02.1986
Language:DE
[1986/07]
Type: B1 Patent specification 
No.:EP0170867
Date:24.08.1988
Language:DE
[1988/34]
Search report(s)(Supplementary) European search report - dispatched on:EP05.12.1985
ClassificationIPC:C22C1/04, H01L23/48
[1986/07]
CPC:
C22C1/0425 (EP); H01L2924/0002 (EP)
C-Set:
H01L2924/0002, H01L2924/00 (EP)
Designated contracting statesCH,   DE,   FR,   GB,   LI [1986/07]
TitleGerman:Verfahren zur Herstellung eines Verbundwerkstoffes[1986/07]
English:Process for manufacturing a composite material[1986/07]
French:Procédé de fabrication d'un materiau composite[1986/07]
File destroyed:12.06.1999
Examination procedure17.07.1986Examination requested  [1986/38]
10.06.1987Despatch of a communication from the examining division (Time limit: M04)
17.09.1987Reply to a communication from the examining division
05.11.1987Despatch of communication of intention to grant (Approval: Yes)
29.01.1988Communication of intention to grant the patent
08.02.1988Fee for grant paid
08.02.1988Fee for publishing/printing paid
Opposition(s)25.05.1989No opposition filed within time limit [1989/35]
Fees paidRenewal fee
01.06.1987Renewal fee patent year 03
08.06.1988Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US3685134  (BLUE PHILIP L);
 [A]US3969754  (KUNIYA KEIICHI, et al);
 [A]GB810678  (HECK FRIEDRICH);
 [Y]GB732029  (MALLORY METALLURG PROD LTD);
 [Y]GB883429  (MALLORY METALLURG PROD LTD)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.