blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0238299

EP0238299 - Calibration of a nuclear reactor core parameter predictor [Right-click to bookmark this link]
Former [1987/39]Calbration of a nuclear reactor core parameter predictor
[1992/24]
StatusNo opposition filed within time limit
Status updated on  09.04.1993
Database last updated on 24.08.2024
Most recent event   Tooltip09.04.1993No opposition filed within time limitpublished on 02.06.1993 [1993/22]
Applicant(s)For all designated states
WESTINGHOUSE ELECTRIC CORPORATION
Westinghouse Building, Gateway Center Pittsburgh
Pennsylvania 15222 / US
[N/P]
Former [1987/39]For all designated states
WESTINGHOUSE ELECTRIC CORPORATION
Westinghouse Building Gateway Center
Pittsburgh Pennsylvania 15222 / US
Inventor(s)01 / Impink, Jr, Albert Joseph
18 Bel-Aire Road
Delmont, PA 15626 / US
02 / Miller, Reno Wade
697 Twin Oak Drive
Pittsburgh, PA 15235 / US
03 / Morita, Toshio
1601 Penn Avenue No 913
Pittsburgh, PA 15221 / US
04 / Grobmyer, Louis Richard
8961 Barnes Lake Road
Irwin, PA 15642 / US
[1987/39]
Representative(s)Van Berlyn, Ronald Gilbert
30 The Green Calne
Wiltshire SN11 8DJ / GB
[N/P]
Former [1987/39]van Berlyn, Ronald Gilbert
23, Centre Heights
London NW3 6JG / GB
Application number, filing date87302259.417.03.1987
[1987/39]
Priority number, dateUS1986084149819.03.1986         Original published format: US 841498
[1987/39]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP0238299
Date:23.09.1987
Language:EN
[1987/39]
Type: A3 Search report 
No.:EP0238299
Date:24.08.1988
Language:EN
[1988/34]
Type: B1 Patent specification 
No.:EP0238299
Date:10.06.1992
Language:EN
[1992/24]
Search report(s)(Supplementary) European search report - dispatched on:EP07.07.1988
ClassificationIPC:G21D3/08, G21C7/00
[1988/30]
CPC:
G21D3/001 (EP,US); G21C7/00 (KR); G21D3/08 (EP,US);
Y02E30/00 (EP); Y02E30/30 (EP,US)
Former IPC [1987/39]G21D3/08
Designated contracting statesBE,   CH,   ES,   FR,   GB,   IT,   LI [1987/39]
TitleGerman:Eichung eines Parametervorausberechnungsgerätes für die Spaltzone eines Kernreaktors[1987/39]
English:Calibration of a nuclear reactor core parameter predictor[1992/24]
French:Etalonnage d'un appareil pour les calculs prévisionnels des paramètres d'un coeur d'un réacteur nucléaire[1987/39]
Former [1987/39]Calbration of a nuclear reactor core parameter predictor
Examination procedure22.02.1989Examination requested  [1989/17]
13.11.1990Despatch of a communication from the examining division (Time limit: M04)
01.02.1991Reply to a communication from the examining division
26.03.1991Despatch of a communication from the examining division (Time limit: M04)
10.06.1991Reply to a communication from the examining division
02.08.1991Despatch of communication of intention to grant (Approval: Yes)
19.09.1991Communication of intention to grant the patent
23.12.1991Fee for grant paid
23.12.1991Fee for publishing/printing paid
Opposition(s)11.03.1993No opposition filed within time limit [1993/22]
Fees paidRenewal fee
28.03.1989Renewal fee patent year 03
21.03.1990Renewal fee patent year 04
28.12.1990Renewal fee patent year 05
27.03.1992Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]EP0102068  (HITACHI LTD [JP]);
 [A]EP0010036  (FRAMATOME SA [FR])
 [A]  - NUCLEAR TECHNOLOGY, vol. 58, no. 1, July 1982, pages 9-22, ANS, Danville, Illinois, US; Y. NISHIZAWA et al.: "On-line test of power distribution prediction system for boiling water reactors"
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.