blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0443441

EP0443441 - Fence [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.01.1995
Database last updated on 03.10.2024
Most recent event   Tooltip17.12.1999Lapse of the patent in a contracting statepublished on 02.02.2000 [2000/05]
Applicant(s)For all designated states
Adronit Verwaltungs GmbH. & Co. GbR mbH.
Oberwengerner Str. 204
D-58300 Wetter / DE
[1993/51]
Former [1991/35]For all designated states
ADRONIT-WERK, HERMANN ADERHOLD GmbH & Co.
Oberwengerner Strasse 204
D-58300 Wetter / DE
Inventor(s)01 / Schmelzer, Karl
Genossenschaftsweg 52
W-5800 Hagen / DE
[1991/35]
Representative(s)Patentanwälte
Fleyer Strasse 135
58097 Hagen / DE
[N/P]
Former [1991/35]Patentanwälte Dipl.-Ing. Conrad Köchling Dipl.-Ing. Conrad-Joachim Köchling
Fleyer Strasse 135
D-58097 Hagen / DE
Application number, filing date91102085.714.02.1991
[1991/35]
Priority number, dateDE1990400516017.02.1990         Original published format: DE 4005160
[1991/35]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP0443441
Date:28.08.1991
Language:DE
[1991/35]
Type: B1 Patent specification 
No.:EP0443441
Date:09.03.1994
Language:DE
[1994/10]
Search report(s)(Supplementary) European search report - dispatched on:EP03.07.1991
ClassificationIPC:E04H17/16
[1991/35]
CPC:
E04H17/168 (EP,US); E04H17/1417 (EP); E04H17/1447 (EP);
E04H17/1456 (EP)
Designated contracting statesAT,   BE,   CH,   DE,   DK,   ES,   FR,   GB,   GR,   IT,   LI,   LU,   NL,   SE [1991/35]
TitleGerman:Gitterzaun[1991/35]
English:Fence[1991/35]
French:Grillage[1991/35]
Examination procedure30.07.1991Examination requested  [1991/39]
17.11.1992Despatch of a communication from the examining division (Time limit: M04)
17.03.1993Reply to a communication from the examining division
27.07.1993Despatch of communication of intention to grant (Approval: Yes)
13.09.1993Communication of intention to grant the patent
27.11.1993Fee for grant paid
27.11.1993Fee for publishing/printing paid
Opposition(s)10.12.1994No opposition filed within time limit [1995/09]
Fees paidRenewal fee
07.01.1993Renewal fee patent year 03
23.12.1993Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipGR09.03.1994
[2000/05]
Documents cited:Search[A]NL273313  ;
 [A]US3848382  (RENSCH E);
 [A]GB1453974  (LB PLASTICS LTD);
 [A]EP0288703  (HOESCH AG [DE], et al);
 [A]FR2620754  (CONST PREFABRIQ MONTLIMA [FR])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.