blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0739438

EP0739438 - REINFORCEMENT FOR BUILDING ELEMENTS UNDER TENSION AND INSTALLATIONS PROVIDED THEREWITH [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  09.06.2000
Database last updated on 19.07.2024
Most recent event   Tooltip09.06.2000Withdrawal of applicationpublished on 26.07.2000 [2000/30]
Applicant(s)For all designated states
Forschungszentrum Jülich GmbH
52425 Jülich / DE
For all designated states
FORSCHUNGS- UND MATERIALPRÜFUNGSANSTALT BADEN-WÜRTTEMBERG
Pfaffenwaldring 4
D-70569 Stuttgart / DE
[N/P]
Former [1996/44]For all designated states
FORSCHUNGSZENTRUM JÜLICH GMBH
Wilhelm-Johnen-Strasse
52425 Jülich / DE
For all designated states
FORSCHUNGS- UND MATERIALPRÜFUNGSANSTALT BADEN-WÜRTTEMBERG
Pfaffenwaldring 4
D-70569 Stuttgart / DE
Inventor(s)01 / BOUSACK, Herbert
Friedensstrasse 98
D-52080 Aachen / DE
02 / MENZEL, Klaus
Charlottenstrasse 34
D-72070 Tübingen / DE
03 / SAWADE, Gottfried
Kirchheimer Strasse 18
D-70619 Stuttgart / DE
[1996/44]
Application number, filing date94920393.907.07.1994
[1996/44]
WO1994DE00788
Priority number, dateDE1993432286209.07.1993         Original published format: DE 4322862
[1996/44]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO9502099
Date:19.01.1995
Language:DE
[1995/04]
Type: A1 Application with search report 
No.:EP0739438
Date:30.10.1996
Language:DE
The application published by WIPO in one of the EPO official languages on 19.01.1995 takes the place of the publication of the European patent application.
[1996/44]
Search report(s)International search report - published on:EP19.01.1995
ClassificationIPC:E04C5/08, E04C5/00, E04G21/12, G01N27/82
[1996/44]
CPC:
E04C5/01 (EP,US); E04C5/08 (EP,US); E04G21/12 (EP,US);
G01N27/82 (EP,US)
Designated contracting statesCH,   DE,   FR,   GB,   IT,   LI,   NL,   SE [1996/44]
TitleGerman:ARMIERUNG FÜR ZUGBELASTETE BAUTEILE UND DAMIT VERSEHENE ANLAGEN[1996/44]
English:REINFORCEMENT FOR BUILDING ELEMENTS UNDER TENSION AND INSTALLATIONS PROVIDED THEREWITH[1996/44]
French:ARMATURE POUR ELEMENTS DE CONSTRUCTION SOUMIS A UN EFFORT DE TRACTION ET INSTALLATIONS POURVUES DE CETTE ARMATURE[1996/44]
Entry into regional phase27.06.1996National basic fee paid 
27.06.1996Designation fee(s) paid 
27.06.1996Examination fee paid 
Examination procedure03.02.1995Request for preliminary examination filed
International Preliminary Examining Authority: EP
27.06.1996Examination requested  [1996/44]
10.08.1999Despatch of a communication from the examining division (Time limit: M04)
10.12.1999Reply to a communication from the examining division
27.05.2000Application withdrawn by applicant  [2000/30]
Fees paidRenewal fee
27.06.1996Renewal fee patent year 03
19.06.1997Renewal fee patent year 04
18.06.1998Renewal fee patent year 05
23.06.1999Renewal fee patent year 06
Penalty fee
Penalty fee Rule 85a EPC 1973
28.05.1996CH   M01   Fee paid on   27.06.1996
28.05.1996DE   M01   Fee paid on   27.06.1996
28.05.1996FR   M01   Fee paid on   27.06.1996
28.05.1996GB   M01   Fee paid on   27.06.1996
28.05.1996IT   M01   Fee paid on   27.06.1996
28.05.1996LI   M01   Not yet paid
28.05.1996NL   M01   Fee paid on   27.06.1996
28.05.1996SE   M01   Fee paid on   27.06.1996
Penalty fee Rule 85b EPC 1973
28.05.1996M01   Fee paid on   27.06.1996
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]DE1284609  (FUCHS, et al) [X] 5 * figure -; claims 1-4 *;
 [A]US4573013  (KUSENBERGER FELIX N [US], et al) [A] 1-3,6 * abstract *;
 [Y]FR2615226  (HABERMANN PIERRE [FR], et al) [Y] 4 * page 4, line 7 - line 31; figure - *;
 [A]WO8912833  (ELECTRIC POWER RES INST [US]) [A] 6* abstract *;
 [XY]EP0376116  (HOCHTIEF AG HOCH TIEFBAUTEN [DE]) [X] 1-3,5,6 * column 1, paragraph 1; figure - * [Y] 4;
 [A]EP0506605  (HILTI AG [LI]) [A] 1,6 * abstract *;
 [XA]EP0529181  (NISHIMATSU CONSTR CO LTD [JP]) [X] 1,5,6 * column 4, lines 1-34 * * column 6, lines 17-51; figure - * [A] 4
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.