blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0767512

EP0767512 - Ground wire attachment to shield for cable assembly and method to produce same [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  12.06.1998
Database last updated on 11.09.2024
Most recent event   Tooltip12.06.1998Application deemed to be withdrawnpublished on 29.07.1998 [1998/31]
Applicant(s)For all designated states
BERG ELECTRONICS MANUFACTURING B.V.
P.O. Box 2060
5202 CB s'-Hertogenbosch / NL
[1997/15]
Inventor(s)01 / Loman, Martinus Hendricus
Vlasgaard 6
NL-5345 AV Oss / NL
[1997/15]
Representative(s)de Bruijn, Leendert C., et al
Nederlandsch Octrooibureau Postbus 29720
2502 LS Den Haag / NL
[N/P]
Former [1997/15]de Bruijn, Leendert C., et al
Nederlandsch Octrooibureau Scheveningseweg 82
2517 KZ Den Haag / NL
Application number, filing date95202655.703.10.1995
[1997/15]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP0767512
Date:09.04.1997
Language:EN
[1997/15]
Search report(s)(Supplementary) European search report - dispatched on:EP13.02.1996
ClassificationIPC:H01R9/05, H01R13/658
[1997/15]
CPC:
H01R9/0518 (EP); H01R13/6582 (EP); H01R13/6593 (EP)
Designated contracting statesGB [1997/15]
TitleGerman:Erdkabel Befestigung an die Abschirmung eines Kabelszusammenbau und deren Herstellungsverfahren[1997/15]
English:Ground wire attachment to shield for cable assembly and method to produce same[1997/15]
French:Attache d'un fil de terre au blindage d'un assemblage de câble et méthode de production[1997/15]
Examination procedure10.10.1997Application deemed to be withdrawn, date of legal effect  [1998/31]
19.02.1998Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [1998/31]
Fees paidPenalty fee
Penalty fee Rule 85b EPC 1973
20.11.1997M01   Not yet paid
Additional fee for renewal fee
31.10.199703   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XY]EP0224200  (STEWART STAMPING CORP [US]) [X] 1-4,6 * page 6, column 9, line 7 - line 33 * * page 7, column 12, line 29 - line 55 * * page 8, column 14, line 15 - page 9, column 15, line 44; figures 1,6 * [Y] 5;
 [YA]EP0168649  (JAPAN AVIATION ELECTRON [JP], et al) [Y] 5 * page 8, line 4 - line 26; figures 10,11 * [A] 1-4,6
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.