blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0733271

EP0733271 - HIGH-TEMPERATURE SUPERCONDUCTORS MADE BY METAL HETEROSTRUCTURES AT THE ATOMIC LIMIT [Right-click to bookmark this link]
Former [1996/39]HIGH T c? SUPERCONDUCTORS MADE BY METAL HETEROSTRUCTURES AT THE ATOMIC LIMIT
[1997/30]
StatusNo opposition filed within time limit
Status updated on  09.04.1999
Database last updated on 14.11.2024
Most recent event   Tooltip15.08.2014Lapse of the patent in a contracting statepublished on 17.09.2014  [2014/38]
Applicant(s)For all designated states
Bianconi, Antonio
Via Giulia, 87
00186 Roma / IT
[1998/22]
Former [1996/39]For all designated states
Bianconi, Antonio
Via Giulia, 87
I-00186 Roma / IT
Inventor(s)01 / see applicant
...
[1996/39]
Application number, filing date95902262.517.11.1994
[1996/39]
WO1994IT00196
Priority number, dateIT1993TO0092907.12.1993         Original published format: IT TO930929
[1996/39]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO9516281
Date:15.06.1995
Language:EN
[1995/25]
Type: A1 Application with search report 
No.:EP0733271
Date:25.09.1996
Language:EN
The application published by WIPO in one of the EPO official languages on 15.06.1995 takes the place of the publication of the European patent application.
[1996/39]
Type: B1 Patent specification 
No.:EP0733271
Date:27.05.1998
Language:EN
[1998/22]
Search report(s)International search report - published on:EP15.06.1995
ClassificationIPC:H01L39/12
[1996/39]
CPC:
H10N60/851 (EP,US); H10N60/858 (EP,US)
Designated contracting statesBE,   CH,   DE,   DK,   ES,   FR,   GB,   IT,   LI,   NL,   SE [1996/39]
TitleGerman:HOCHTEMPERATURSUPRALEITER MIT METALLISCHEN HETEROSTRUKTUREN IM ATOMAREN LIMIT[1998/22]
English:HIGH-TEMPERATURE SUPERCONDUCTORS MADE BY METAL HETEROSTRUCTURES AT THE ATOMIC LIMIT[1998/22]
French:SUPRACONDUCTEURS A TEMPERATURE CRITIQUE ELEVEE COMPOSES D'HETEROSTRUCTURES METALLIQUES A LA LIMITE ATOMIQUE[1996/39]
Former [1996/39]HOCHTEMPERATUR SUPRALEITER HERGESTELLT MIT METALLENEN STRUKTUREN VON ATOMAREN LIMITEN
Former [1996/39]HIGH T c? SUPERCONDUCTORS MADE BY METAL HETEROSTRUCTURES AT THE ATOMIC LIMIT
Entry into regional phase15.05.1996National basic fee paid 
15.05.1996Designation fee(s) paid 
15.05.1996Examination fee paid 
Examination procedure03.07.1995Request for preliminary examination filed
International Preliminary Examining Authority: EP
15.05.1996Examination requested  [1996/39]
04.11.1997Despatch of communication of intention to grant (Approval: Yes)
28.11.1997Communication of intention to grant the patent
06.02.1998Fee for grant paid
06.02.1998Fee for publishing/printing paid
Opposition(s)02.03.1999No opposition filed within time limit [1999/21]
Fees paidRenewal fee
09.05.1997Renewal fee patent year 03
17.11.1997Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
30.11.199603   M06   Fee paid on   09.05.1997
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]EP0502204  (TORAY INDUSTRIES [JP])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.