blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0759718

EP0759718 - MATTRESS COVER WITH PRESSURE-COMPENSATION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.05.2000
Database last updated on 25.09.2024
Most recent event   Tooltip26.05.2000No opposition filed within time limitpublished on 12.07.2000 [2000/28]
Applicant(s)For all designated states
Seidl, Udo
Reutegasse 19b
6901 Bregenz / AT
[1997/10]
Inventor(s)01 / see applicant
...
[1997/10]
Representative(s)Riebling, Peter
Patentanwalt
Rennerle 10
88131 Lindau / DE
[N/P]
Former [1997/10]Riebling, Peter, Dr.-Ing.
Patentanwalt, Rennerle 10
88131 Lindau / DE
Application number, filing date95922488.226.05.1995
[1997/10]
WO1995EP02024
Priority number, dateDE1994441846327.05.1994         Original published format: DE 4418463
[1997/10]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO9532649
Date:07.12.1995
Language:DE
[1995/52]
Type: A1 Application with search report 
No.:EP0759718
Date:05.03.1997
Language:DE
The application published by WIPO in one of the EPO official languages on 07.12.1995 takes the place of the publication of the European patent application.
[1997/10]
Type: B1 Patent specification 
No.:EP0759718
Date:21.07.1999
Language:DE
[1999/29]
Search report(s)International search report - published on:EP07.12.1995
ClassificationIPC:A47C27/10, A47C27/18
[1997/10]
CPC:
A47C27/146 (EP); A47C27/081 (EP); A47C27/10 (EP);
A47C27/18 (EP)
Designated contracting statesAT,   BE,   CH,   DE,   ES,   FR,   GB,   IT,   LI,   NL,   SE [1997/10]
TitleGerman:MATRATZENHÜLLE MIT DRUCKAUSGLEICHSSYSTEM[1997/10]
English:MATTRESS COVER WITH PRESSURE-COMPENSATION SYSTEM[1997/10]
French:HOUSSE DE MATELAS AVEC SYSTEME DE COMPENSATION DE LA PRESSION[1997/10]
Entry into regional phase18.12.1996National basic fee paid 
18.12.1996Designation fee(s) paid 
18.12.1996Examination fee paid 
Examination procedure09.12.1995Request for preliminary examination filed
International Preliminary Examining Authority: EP
18.12.1996Examination requested  [1997/10]
10.04.1997Despatch of a communication from the examining division (Time limit: M04)
08.08.1997Reply to a communication from the examining division
11.12.1997Despatch of a communication from the examining division (Time limit: M04)
09.04.1998Reply to a communication from the examining division
09.06.1998Despatch of a communication from the examining division (Time limit: M02)
22.07.1998Reply to a communication from the examining division
17.08.1998Despatch of communication of intention to grant (Approval: Yes)
18.12.1998Communication of intention to grant the patent
17.02.1999Fee for grant paid
17.02.1999Fee for publishing/printing paid
Opposition(s)26.04.2000No opposition filed within time limit [2000/28]
Fees paidRenewal fee
28.05.1997Renewal fee patent year 03
29.05.1998Renewal fee patent year 04
07.05.1999Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]FR1535732  (PELLETIER) [X] 1,5* page 2, column 1, line 20 - column 2, line 18; figures 1,2 *;
 [A]DE3320771  (NOACK FRITZ) [A] 12-14 * page 14, line 6 - page 15, line 8; figures 6,7 *;
 [Y]DE3443935  (RHEINISCHE BRAUNKOHLENW AG [DE]) [Y] 4,5 * page 10, line 5 - page 12, line 4; figures 1,2,4 *;
 [XY]US4965901  (NORMAND GAUDRY [CA]) [X] 1,6-10 * column 2, line 61 - column 4, line 16; figures 6,8-12 * [Y] 4,5
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.