blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0755848

EP0755848 - Connection for built-up structures [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.11.2000
Database last updated on 20.09.2024
Most recent event   Tooltip17.11.2000No opposition filed within time limitpublished on 03.01.2001 [2001/01]
Applicant(s)For all designated states
Alusuisse Technology & Management AG
Badische Bahnhofstrasse 16
8212 Neuhausen am Rheinfall / CH
[1997/05]
Inventor(s)01 / Ritzl, Antal
Albisriederstr. 363
8047 Zürich / CH
[1997/05]
Application number, filing date96810453.912.07.1996
[1997/05]
Priority number, dateCH1995000217324.07.1995         Original published format: CH 217395
[1997/05]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP0755848
Date:29.01.1997
Language:DE
[1997/05]
Type: B1 Patent specification 
No.:EP0755848
Date:19.01.2000
Language:DE
[2000/03]
Search report(s)(Supplementary) European search report - dispatched on:EP30.10.1996
ClassificationIPC:B62D33/04
[1997/05]
CPC:
B62D33/04 (EP); B62D33/044 (EP)
Designated contracting statesCH,   DE,   FR,   GB,   IT,   LI [1997/05]
TitleGerman:Baugruppenverbindung[1997/05]
English:Connection for built-up structures[1997/05]
French:Connection de structures assemblées[1997/05]
Examination procedure29.07.1997Examination requested  [1997/39]
22.10.1998Despatch of a communication from the examining division (Time limit: M04)
05.02.1999Reply to a communication from the examining division
10.03.1999Despatch of communication of intention to grant (Approval: Yes)
07.07.1999Communication of intention to grant the patent
18.10.1999Fee for grant paid
18.10.1999Fee for publishing/printing paid
Opposition(s)20.10.2000No opposition filed within time limit [2001/01]
Fees paidRenewal fee
31.07.1998Renewal fee patent year 03
02.08.1999Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]AT293197B  (ERBSLÖH) [Y] 1-3,5 * page 2, line 11 - line 16; figure 4 *;
 [Y]GB2220724  (HULLS JOHN R) [Y] 1-3,5 * page 10, line 23 - page 11, line 21; figure 3 *;
 [Y]FR2237463  (GROSSE GERARD) [Y] 1-3 * page 3, line 15 - line 23; figure 3 *;
 [Y]FR1424185  (DAUSEND) [Y] 1-3 * page 1, column R, paragraph 2; figure - *;
 [A]CH452365  (ALUMINIUM PRESS- UND WALZWERK MÜNCHENSTEIN) [A] 4 * the whole document *;
 [A]US3061364  (FRUEHAUF) [A] 1 * page 1, line 66 - page 2, line 14; figure 2 *;
 [A]US5403063  (SJOSTEDT ROBBIE J ET AL) [A] 1,2,5 * page 14, line 42 - page 15, line 27; figure 11 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.