blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0858841

EP0858841 - Powder coating unit and powder coating installation with the same [Right-click to bookmark this link]
Former [1998/34]Powder coating unit, conveyor for such a unit and powder coating installation with the same
[2003/11]
StatusThe application is deemed to be withdrawn
Status updated on  21.11.2003
Database last updated on 11.09.2024
Most recent event   Tooltip21.11.2003Application deemed to be withdrawnpublished on 07.01.2004  [2004/02]
Applicant(s)For all designated states
Seiler, Daniel
c/o SFB AG, St.Dionysstrasse 31
CH-8645 Jona / CH
[2003/19]
Former [1998/34]For all designated states
Seiler, Daniel
c/o SFB AG, St. Gallerstrasse 161
8645 Jona / CH
Inventor(s)01 / see applicant
...
[1998/34]
Application number, filing date97811015.322.12.1997
[1998/34]
Priority number, dateCH1996000317423.12.1996         Original published format: CH 317496
CH1997000000623.12.1996         Original published format: CH 697
[1998/34]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP0858841
Date:19.08.1998
Language:DE
[1998/34]
Type: A3 Search report 
No.:EP0858841
Date:10.03.1999
[1999/10]
Search report(s)(Supplementary) European search report - dispatched on:EP26.01.1999
ClassificationIPC:B05B7/14, B05B13/02, B05B15/04, B05B5/08
[1999/10]
CPC:
B05B13/0221 (EP); B05B14/10 (EP); B05B14/20 (EP);
B05B14/30 (EP); B05B5/084 (EP)
Former IPC [1998/34]B05B7/14, B05B13/02
Designated contracting statesDE,   ES,   FR,   GB,   IT [1999/49]
Former [1999/48]AT,  BE,  CH,  DE,  DK,  LI 
Former [1999/47](deleted) 
Former [1998/34]AT,  BE,  CH,  DE,  DK,  ES,  FI,  FR,  GB,  GR,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  SE 
TitleGerman:Pulverbeschichtungsein sowie Beschichtungsanlage mit Pulverbeschichtungseinheit[2003/11]
English:Powder coating unit and powder coating installation with the same[2003/11]
French:Unité de revêtement par poudre et installation munie de cette unité[2003/11]
Former [1998/34]Pulverbeschichtungseinheit, Transportband für eine derartige Pulverbeschichtungseinheit sowie Beschichtungsanlage mit Pulverbeschichtungseinheit
Former [1998/34]Powder coating unit, conveyor for such a unit and powder coating installation with the same
Former [1998/34]Unité de revêtement par poudre, bande transporteuse pour une telle unité et installation munie de cette unité
Examination procedure10.09.1999Examination requested  [1999/48]
13.09.1999Loss of particular rights, legal effect: designated state(s)
05.01.2000Despatch of communication of loss of particular rights: designated state(s) AT, BE, CH, DK, FI, GR, IE, LI, LU, MC, NL, PT, SE
17.01.2002Despatch of a communication from the examining division (Time limit: M04)
23.04.2002Reply to a communication from the examining division
02.04.2003Communication of intention to grant the patent
01.07.2003Application deemed to be withdrawn, date of legal effect  [2004/02]
07.08.2003Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2004/02]
Fees paidRenewal fee
20.06.2000Renewal fee patent year 03
01.06.2001Renewal fee patent year 04
21.06.2002Renewal fee patent year 05
Penalty fee
Penalty fee Rule 85a EPC 1973
20.10.1999AT   M01   Not yet paid
20.10.1999BE   M01   Not yet paid
20.10.1999CH   M01   Not yet paid
20.10.1999DK   M01   Not yet paid
20.10.1999FI   M01   Not yet paid
20.10.1999GR   M01   Not yet paid
20.10.1999IE   M01   Not yet paid
20.10.1999LU   M01   Not yet paid
20.10.1999MC   M01   Not yet paid
20.10.1999NL   M01   Not yet paid
20.10.1999PT   M01   Not yet paid
20.10.1999SE   M01   Not yet paid
Additional fee for renewal fee
31.12.199903   M06   Fee paid on   20.06.2000
31.12.200004   M06   Fee paid on   01.06.2001
31.12.200105   M06   Fee paid on   21.06.2002
31.12.200206   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]JPS6138653  ;
 [X]US5382450  (SALISBURY RICHARD [US]) [X] 1-3,5,10 * column 3, line 30 - column 4, line 8 * * column 6, line 24 - line 41 *;
 [A]US4836137  (HEINE WERNER [DE], et al) [A] 1,3,4,8 * column 3, line 58 - column 5, line 55 *;
 [A]GB1492092  (PLASTIC COATINGS LTD) [A] 6 * page 2, line 1 - line 3 * * page 3, line 43 - line 60 * * figures 1,4 *;
 [A]US4495217  (SCHRUM TIMOTHY J [US]) [A] 6 * column 3, line 38 - line 48; figure 2 *;
 [A]JPH07155652
 [X]  - PATENT ABSTRACTS OF JAPAN, (19860708), vol. 010, no. 194, Database accession no. (C - 358), & JP61038653 A 19860224 (MATSUO SANGYO KK) [X] 1-3,5,9,10 * abstract *
 [A]  - PATENT ABSTRACTS OF JAPAN, (19951031), vol. 095, no. 009, & JP07155652 A 19950620 (CHICHIBU ONODA CEMENT CORP) [A] 7 * abstract *
by applicantEP0405164
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.