blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0896456

EP0896456 - Pulse shaping for the control of the amplitude variation of PSK signals [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.03.2005
Database last updated on 03.10.2024
Most recent event   Tooltip07.03.2008Lapse of the patent in a contracting state
New state(s): IT, PT
published on 09.04.2008  [2008/15]
Applicant(s)For all designated states
NORTEL NETWORKS France
Parc d'activités de Magny-Châteaufort
78117 Châteaufort / FR
[2002/27]
Former [1999/06]For all designated states
MATRA NORTEL COMMUNICATIONS
50, rue du Président Sadate
29000 Quimper / FR
Inventor(s)01 / Marque-Pucheu, Gérard
29A, rue Chanzy
75011 Paris / FR
02 / Roseiro, Albert
40 Terrasse de l'Iris
92400 Courbevoie / FR
[1999/06]
Representative(s)Loisel, Bertrand
Cabinet Plasseraud
ATTENTION : ADDRESS INACTIVE - USE ASS-NR - CDR
Paris / FR
[N/P]
Former [1999/06]Loisel, Bertrand
Cabinet Plasseraud, 84, rue d'Amsterdam
75440 Paris Cédex 09 / FR
Application number, filing date98401972.903.08.1998
[1999/06]
Priority number, dateFR1997000996204.08.1997         Original published format: FR 9709962
[1999/06]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP0896456
Date:10.02.1999
Language:FR
[1999/06]
Type: B1 Patent specification 
No.:EP0896456
Date:28.04.2004
Language:FR
[2004/18]
Search report(s)(Supplementary) European search report - dispatched on:EP11.11.1998
ClassificationIPC:H04L27/20, H04L25/03
[1999/06]
CPC:
H04L27/2071 (EP); H04L25/03834 (EP)
Designated contracting statesAT,   BE,   CH,   DE,   ES,   FR,   GB,   GR,   IE,   IT,   LI,   PT [1999/42]
Former [1999/06]AT,  BE,  CH,  CY,  DE,  DK,  ES,  FI,  FR,  GB,  GR,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  SE 
Extension statesLT08.01.1999
LV08.01.1999
RO08.01.1999
SI08.01.1999
TitleGerman:Pulsformung für die Kontrolle von Amplitudenvariationen von PSK-Signalen[2004/01]
English:Pulse shaping for the control of the amplitude variation of PSK signals[1999/06]
French:Mise en forme d'impulsions pour le réglage de variation en amplitude de signaux MDF[1999/06]
Former [1999/06]Pulsformung für die Kontrolle von Amplitudenvariationen PSK-Signale
Examination procedure08.01.1999Examination requested  [1999/10]
05.02.1999Amendment by applicant (claims and/or description)
11.08.1999Loss of particular rights, legal effect: designated state(s)
03.12.1999Despatch of communication of loss of particular rights: designated state(s) CY, DK, FI, LU, MC, NL, SE
18.11.2003Communication of intention to grant the patent
24.01.2004Fee for grant paid
24.01.2004Fee for publishing/printing paid
Divisional application(s)EP99102638.6  / EP0936784
Opposition(s)31.01.2005No opposition filed within time limit [2005/16]
Fees paidRenewal fee
26.07.2000Renewal fee patent year 03
27.07.2001Renewal fee patent year 04
26.07.2002Renewal fee patent year 05
06.08.2003Renewal fee patent year 06
Penalty fee
Penalty fee Rule 85a EPC 1973
15.09.1999CY   M01   Not yet paid
15.09.1999DK   M01   Not yet paid
15.09.1999FI   M01   Not yet paid
15.09.1999LU   M01   Not yet paid
15.09.1999MC   M01   Not yet paid
15.09.1999NL   M01   Not yet paid
15.09.1999SE   M01   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT28.04.2004
IE28.04.2004
IT28.04.2004
GR28.07.2004
ES08.08.2004
BE31.08.2004
CH31.08.2004
LI31.08.2004
PT28.09.2004
[2008/15]
Former [2005/51]AT28.04.2004
IE28.04.2004
GR28.07.2004
ES08.08.2004
BE31.08.2004
CH31.08.2004
LI31.08.2004
Former [2005/25]AT28.04.2004
IE28.04.2004
GR28.07.2004
ES08.08.2004
CH31.08.2004
LI31.08.2004
Former [2005/19]AT28.04.2004
IE28.04.2004
GR28.07.2004
ES08.08.2004
Former [2005/11]AT28.04.2004
GR28.07.2004
ES08.08.2004
Former [2005/06]GR28.07.2004
ES08.08.2004
Former [2005/02]ES08.08.2004
Documents cited:Search[A]EP0494696  (MITSUBISHI ELECTRIC CORP [JP]) [A] 1,5 * figures 1,6 * * page 4, line 29 - line 38 * * page 7, line 6 - line 14 *;
 [A]FR2675001  (MATRA COMMUNICATION [FR]) [A] 1-9 * page 2, line 11 - line 14 * * page 3, line 6 - line 9 * * page 3, line 15 - line 20 * * page 4, line 4 - line 16 * * page 4, line 21 - line 23 * * page 4, line 33 *;
 [A]EP0633681  (ERICSSON GE MOBILE COMMUNICAT [US]) [A] 1,5 * abstract * * page 4, line 11 - line 15 * * page 5, line 15 - line 25 * * page 3, line 3 - line 7 *;
 [A]EP0633680  (ERICSSON GE MOBILE COMMUNICAT [US]) [A] 1,5 * page 3, line 9 - line 13 ** page 5, line 3 - line 7 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.