blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0971082

EP0971082 - Method of manufacturing roofing material [Right-click to bookmark this link]
Former [2000/02]Recycled roofing material and method of manufacturing the same
[2006/28]
StatusNo opposition filed within time limit
Status updated on  02.11.2007
Database last updated on 20.12.2024
Most recent event   Tooltip07.02.2014Lapse of the patent in a contracting statepublished on 12.03.2014  [2014/11]
Applicant(s)For all designated states
Northern Elastomeric Inc
50 Pine Road
Brentwood, NH 03833 / US
[2000/02]
Inventor(s)01 / Zickell, Thomas J.
107 Tidewater Farms Road
Stratham, NH 03885 / US
[2000/02]
Representative(s)Copp, David Christopher, et al
Dummett Copp 25 The Square Martlesham Heath Ipswich IP5 3SL
Suffolk / GB
[N/P]
Former [2000/02]Copp, David Christopher, et al
Dummett Copp, 25 The Square, Martlesham Heath
Ipswich, Suffolk IP5 7SL / GB
Application number, filing date99302859.613.04.1999
[2000/02]
Priority number, dateUS1998005997014.04.1998         Original published format: US 59970
[2000/02]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP0971082
Date:12.01.2000
Language:EN
[2000/02]
Type: A3 Search report 
No.:EP0971082
Date:20.12.2000
[2000/51]
Type: B1 Patent specification 
No.:EP0971082
Date:27.12.2006
Language:EN
[2006/52]
Search report(s)(Supplementary) European search report - dispatched on:EP07.11.2000
ClassificationIPC:E04D5/02, E04D1/26, C08L95/00
[2000/51]
CPC:
E04D5/10 (EP,US); E04D1/26 (EP,US); E04D5/02 (EP,US);
E04D2001/005 (EP,US); Y10S52/09 (EP,US); Y10S52/16 (EP,US);
Y10T428/24372 (EP,US); Y10T428/31815 (EP,US); Y10T428/31819 (EP,US);
Y10T428/31823 (EP,US); Y10T428/31841 (EP,US); Y10T442/2213 (EP,US);
Y10T442/2221 (EP,US); Y10T442/644 (EP,US); Y10T442/696 (EP,US) (-)
Former IPC [2000/02]E04D5/02, E04D1/26
Designated contracting statesDE,   FR,   GB,   IT [2001/36]
Former [2000/02]AT,  BE,  CH,  CY,  DE,  DK,  ES,  FI,  FR,  GB,  GR,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  SE 
TitleGerman:Verfahren zur Herstellung von Dacheindeckungsmaterial[2006/28]
English:Method of manufacturing roofing material[2006/28]
French:Procédé pour la fabrication du recouvrement de toiture[2006/28]
Former [2000/02]Rückgewonnenes Dacheindeckungsmaterial und Verfahren zu seiner Herstellung
Former [2000/02]Recycled roofing material and method of manufacturing the same
Former [2000/02]Matériau recyclé pour le recouvrement de toiture et procédé pour sa fabrication
Examination procedure12.02.2001Examination requested  [2001/15]
21.06.2001Loss of particular rights, legal effect: designated state(s)
15.10.2001Despatch of communication of loss of particular rights: designated state(s) AT, BE, CH, CY, DK, ES, FI, GR, IE, LI, LU, MC, NL, PT, SE
15.05.2003Despatch of a communication from the examining division (Time limit: M06)
14.11.2003Reply to a communication from the examining division
30.06.2004Despatch of a communication from the examining division (Time limit: M04)
04.11.2004Reply to a communication from the examining division
21.06.2005Despatch of a communication from the examining division (Time limit: M04)
20.10.2005Reply to a communication from the examining division
18.07.2006Communication of intention to grant the patent
13.11.2006Fee for grant paid
13.11.2006Fee for publishing/printing paid
Opposition(s)28.09.2007No opposition filed within time limit [2007/49]
Fees paidRenewal fee
20.04.2001Renewal fee patent year 03
12.04.2002Renewal fee patent year 04
30.04.2003Renewal fee patent year 05
26.04.2004Renewal fee patent year 06
13.04.2005Renewal fee patent year 07
25.04.2006Renewal fee patent year 08
Penalty fee
Penalty fee Rule 85a EPC 1973
26.07.2001AT   M01   Not yet paid
26.07.2001BE   M01   Not yet paid
26.07.2001CH   M01   Not yet paid
26.07.2001CY   M01   Not yet paid
26.07.2001DK   M01   Not yet paid
26.07.2001ES   M01   Not yet paid
26.07.2001FI   M01   Not yet paid
26.07.2001GR   M01   Not yet paid
26.07.2001IE   M01   Not yet paid
26.07.2001LU   M01   Not yet paid
26.07.2001MC   M01   Not yet paid
26.07.2001NL   M01   Not yet paid
26.07.2001PT   M01   Not yet paid
26.07.2001SE   M01   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipFR27.12.2006
DE28.03.2007
[2014/11]
Former [2008/52]FR27.12.2006
DE28.03.2007
Former [2008/23]DE28.03.2007
FR17.08.2007
Former [2008/17]DE28.03.2007
Documents cited:Search[XY]US5626659  (CHIVERS MORGAN A [US]) [X] 1-3,9,10,12,18,20 * column 3, line 20 - column 3, line 63 * * column 4, line 13 - column 4, line 36 * [Y] 11;
 [Y]US5362316  (PARADISE RICHARD W [US]) [Y] 11 * column 3, line 34 - column 3, line 38 * * column 3, line 56 - column 3, line 60 * * claims 11,12 *;
 [A]US5201472  (BROCK J DON [US]) [A] 1,2 * column 1, line 61 - column 2, line 38 *;
 [A]US4706893  (BROCK JAMES D [US]) [A] 4,7 * column 1, line 33 - column 1, line 40 *;
 [A]WO9510574  (GRACE W R & CO [US], et al) [A] 13,14,16 * page 12, paragraph 3 - page 13, paragraph 2 * * figure 2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.