blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1084280

EP1084280 - HYDROMETALLURGICAL TREATMENT PROCESS FOR EXTRACTION OF PLATINUM GROUP METALS OBVIATING THE MATTE SMELTING PROCESS [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  13.12.2002
Database last updated on 20.09.2024
Most recent event   Tooltip13.12.2002Application deemed to be withdrawnpublished on 29.01.2003  [2003/05]
Applicant(s)For all designated states
Liddell, Keith Stuart
Forrest Centre, Level 28, 221 St George's Terrace
Perth, W.A. 6000 / AU
[2001/12]
Inventor(s)01 / see applicant
...
 [2001/12]
Representative(s)Samuels, Lucy Alice
Gill Jennings & Every LLP The Broadgate Tower
20 Primrose Street
London
EC2A 2ES / GB
[N/P]
Former [2001/12]Samuels, Lucy Alice
Gill Jennings & Every Broadgate House 7 Eldon Street
London EC2M 7LH / GB
Application number, filing date99919460.819.05.1999
[2001/12]
WO1999IB00898
Priority number, dateZA1998000421219.05.1998         Original published format: ZA 9804212
[2001/12]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO9960178
Date:25.11.1999
Language:EN
[1999/47]
Type: A1 Application with search report 
No.:EP1084280
Date:21.03.2001
Language:EN
The application published by WIPO in one of the EPO official languages on 25.11.1999 takes the place of the publication of the European patent application.
[2001/12]
Search report(s)International search report - published on:EP25.11.1999
ClassificationIPC:C22B11/06, C22B3/06, C22B3/42
[2001/12]
CPC:
C22B11/06 (EP,US); C22B11/04 (EP,US)
Designated contracting statesBE,   DE,   GB [2001/12]
TitleGerman:HYDROMETALLURGISCHES VERFAHREN ZUR GEWINNUNG VON PLATINMETALLEN OHNE EINSCHMELZEN EINER MATTE[2001/12]
English:HYDROMETALLURGICAL TREATMENT PROCESS FOR EXTRACTION OF PLATINUM GROUP METALS OBVIATING THE MATTE SMELTING PROCESS[2001/12]
French:TRAITEMENT HYDROMETALLURGIQUE RENDANT INUTILE LE PROCESSUS DE FUSION POUR MATTE DANS UN PROCEDE D'EXTRACTION DE METAUX DE LA MINE DE PLATINE[2001/12]
Entry into regional phase15.12.2000National basic fee paid 
15.12.2000Designation fee(s) paid 
15.12.2000Examination fee paid 
Examination procedure15.12.1999Request for preliminary examination filed
International Preliminary Examining Authority: EP
15.12.2000Examination requested  [2001/12]
05.04.2001Despatch of a communication from the examining division (Time limit: M04)
06.08.2001Reply to a communication from the examining division
28.11.2001Despatch of communication of intention to grant (Approval: Yes)
15.04.2002Communication of intention to grant the patent
19.06.2002Fee for grant paid
19.06.2002Fee for publishing/printing paid
26.07.2002Application deemed to be withdrawn, date of legal effect  [2003/05]
29.08.2002Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2003/05]
Fees paidRenewal fee
14.05.2001Renewal fee patent year 03
14.05.2002Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]GB1078453  (INT NICKEL CANADA) [A] 5 * page 1, line 9 - line 17 * * page 1, line 77 - page 2, line 2 *;
 [YA]US4108639  (LAKE MALCOLM JOHN, et al) [Y] 1,3,4 * abstract * * column 1, line 12 - line 17 * * column 2, line 38 - line 56 * * column 3, line 23 - line 45 * * column 4, line 24 - column 5, line 13 * * column 5, line 40 - column 6, line 61 * * figure -; claims 1,15,16 * [A] 7;
 [A]US5238662  (DUBROVSKY MICHAEL [US]) [A] 2,8,9 * column 1, line 12 - line 18 * * column 10, line 5 - line 26 * * figure - *;
 [YA]US5364444  (MCDOULETT JR C DALE [US], et al) [Y] 1,3,4 * abstract * * column 1, line 5 - line 8 * * column 1, line 45 - line 64 * * column 2, line 36 - line 55 * * column 3, line 11 - line 45 * * figure .; examples 10,11; claims 1,2,4-7,10,11,14 * [A] 2,6;
 [A]  - FLEMING C A, "HYDROMETALLURGY OF PRECIOUS METALS RECOVERY", HYDROMETALLURGY, (19920601), vol. 30, no. 1 / 03, ISSN 0304-386X, pages 127 - 162, XP000382331 [A] 1-3 * Refractory Gold and Silver ores General ; Roasting ; Pressure leaching.; page 148 - page 156 *

DOI:   http://dx.doi.org/10.1016/0304-386X(92)90081-A
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.