blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1434295

EP1434295 - Integrated fuel cell hybrid power plant with re-circulated air fuel flow [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  12.12.2008
Database last updated on 20.05.2024
Most recent event   Tooltip26.06.2009Change - representativepublished on 29.07.2009  [2009/31]
Applicant(s)For all designated states
GENERAL ELECTRIC COMPANY
1 River Road
Schenectady, NY 12345 / US
[N/P]
Former [2004/27]For all designated states
GENERAL ELECTRIC COMPANY
1 River Road
Schenectady, NY 12345 / US
Inventor(s)01 / Balan, Chellappa
1012 Northwood Court
Niskayuna, New York 12309 / US
02 / Deangelis, David
259 State Street Apt. B
Albany, New York 12210 / US
 [2004/27]
Representative(s)Goode, Ian Roy, et al
London Patent Operation
General Electric International, Inc.
15 John Adam Street
London
WC2N 6LU / GB
[N/P]
Former [2009/31]Goode, Ian Roy, et al
London Patent Operation General Electric International, Inc. 15 John Adam Street London
WC2N 6LU / GB
Former [2004/27]Goode, Ian Roy, et al
London Patent Operation General Electric International, Inc. 15 John Adam Street
London WC2N 6LU / GB
Application number, filing date03258064.919.12.2003
[2004/27]
Priority number, dateUS2002024816623.12.2002         Original published format: US 248166
[2004/27]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP1434295
Date:30.06.2004
Language:EN
[2004/27]
ClassificationIPC:H01M8/04, H01M8/06
[2004/27]
CPC:
H01M8/04089 (EP,US); B60L50/50 (KR); H01M8/04022 (EP,US);
H01M8/0612 (EP,US); H01M8/1231 (EP,US); H01M2250/407 (EP,US);
Y02E20/16 (EP,US); Y02E60/50 (EP,US); Y02P90/40 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   RO,   SE,   SI,   SK,   TR [2004/27]
Extension statesALNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
TitleGerman:Integriertes Brennstoffzellen Hybridkraftwerk mit umlaufendem Luft-Brennstofffluss[2004/48]
English:Integrated fuel cell hybrid power plant with re-circulated air fuel flow[2004/27]
French:Centrale hybride de pile à combustible intégree avec recirculation de flux d'air de combustion[2004/48]
Former [2004/27]Integriertes Brennstoffzellen-Hybridkraftwerk mit umlaufendem Luft-Brennstoff-Fluss
Former [2004/27]Centrale hybride de pile à combustible integrée avec recirculation de flux d'air de combustion
Examination procedure01.07.2008Application deemed to be withdrawn, date of legal effect  [2009/03]
20.08.2008Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2009/03]
Fees paidRenewal fee
02.01.2006Renewal fee patent year 03
02.01.2007Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
31.12.200705   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.