EP1497614 - METHOD AND APPARATUS FOR ALIGNMENT OF COMPONENTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.06.2019 Database last updated on 20.05.2024 | |
Former | The patent has been granted Status updated on 29.06.2018 | ||
Former | Grant of patent is intended Status updated on 19.02.2018 | Most recent event Tooltip | 09.07.2021 | Lapse of the patent in a contracting state New state(s): HU | published on 11.08.2021 [2021/32] | Applicant(s) | For all designated states Acoem AB Box 7 431 21 Mölndal / SE | [2015/13] |
Former [2005/03] | For all designated states A.P. Fixturlaser AB Östergardsgatan 11 431 53 Mölndal / SE | Inventor(s) | 01 /
HENRY, Richard, W. 7600 Delview Drive West Chester, OH 45069 / US | [2005/03] | Representative(s) | Andersson, Per Rune, et al Westpatent AB Almekärrsvägen 11 443 39 Lerum / SE | [2018/31] |
Former [2005/03] | Andersson, Per Rune, et al Albihns Göteborg AB Box 142 401 22 Göteborg / SE | Application number, filing date | 03733690.6 | 22.04.2003 | [2005/03] | WO2003SE00633 | Priority number, date | SE20020001224 | 22.04.2002 Original published format: SE 0201224 | [2005/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO03089875 | Date: | 30.10.2003 | Language: | EN | [2003/44] | Type: | A1 Application with search report | No.: | EP1497614 | Date: | 19.01.2005 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.10.2003 takes the place of the publication of the European patent application. | [2005/03] | Type: | B1 Patent specification | No.: | EP1497614 | Date: | 01.08.2018 | Language: | EN | [2018/31] | Search report(s) | International search report - published on: | SE | 30.10.2003 | Classification | IPC: | G01B11/27 | [2005/03] | CPC: |
G01B11/272 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PT, RO, SE, SI, SK, TR [2018/31] |
Former [2005/03] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN UND VORRICHTUNG ZUR AUSRICHTUNG VON KOMPONENTEN | [2005/03] | English: | METHOD AND APPARATUS FOR ALIGNMENT OF COMPONENTS | [2005/03] | French: | PROCEDE ET APPAREIL D'ALIGNEMENT DE COMPOSANTS | [2005/03] | Entry into regional phase | 01.11.2004 | National basic fee paid | 01.11.2004 | Designation fee(s) paid | 01.11.2004 | Examination fee paid | Examination procedure | 24.11.2003 | Request for preliminary examination filed International Preliminary Examining Authority: SE | 03.11.2004 | Examination requested [2005/03] | 09.11.2010 | Despatch of a communication from the examining division (Time limit: M06) | 12.05.2011 | Reply to a communication from the examining division | 20.02.2018 | Communication of intention to grant the patent | 19.06.2018 | Fee for grant paid | 19.06.2018 | Fee for publishing/printing paid | 19.06.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.11.2010 | Opposition(s) | 03.05.2019 | No opposition filed within time limit [2019/28] | Fees paid | Renewal fee | 23.04.2005 | Renewal fee patent year 03 | 21.04.2006 | Renewal fee patent year 04 | 24.04.2007 | Renewal fee patent year 05 | 19.03.2008 | Renewal fee patent year 06 | 21.04.2009 | Renewal fee patent year 07 | 26.03.2010 | Renewal fee patent year 08 | 26.04.2011 | Renewal fee patent year 09 | 06.03.2012 | Renewal fee patent year 10 | 12.04.2013 | Renewal fee patent year 11 | 25.03.2014 | Renewal fee patent year 12 | 10.04.2015 | Renewal fee patent year 13 | 11.04.2016 | Renewal fee patent year 14 | 10.04.2017 | Renewal fee patent year 15 | 10.04.2018 | Renewal fee patent year 16 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.04.2003 | AT | 01.08.2018 | CY | 01.08.2018 | CZ | 01.08.2018 | DK | 01.08.2018 | EE | 01.08.2018 | ES | 01.08.2018 | FI | 01.08.2018 | IT | 01.08.2018 | MC | 01.08.2018 | NL | 01.08.2018 | RO | 01.08.2018 | SE | 01.08.2018 | SI | 01.08.2018 | SK | 01.08.2018 | TR | 01.08.2018 | BG | 01.11.2018 | GR | 02.11.2018 | PT | 03.12.2018 | GB | 22.04.2019 | IE | 22.04.2019 | LU | 22.04.2019 | BE | 30.04.2019 | CH | 30.04.2019 | FR | 30.04.2019 | LI | 30.04.2019 | [2021/32] |
Former [2021/26] | AT | 01.08.2018 | |
CY | 01.08.2018 | ||
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
TR | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
PT | 03.12.2018 | ||
GB | 22.04.2019 | ||
IE | 22.04.2019 | ||
LU | 22.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
FR | 30.04.2019 | ||
LI | 30.04.2019 | ||
Former [2020/29] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
TR | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
PT | 03.12.2018 | ||
GB | 22.04.2019 | ||
IE | 22.04.2019 | ||
LU | 22.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
FR | 30.04.2019 | ||
LI | 30.04.2019 | ||
Former [2020/21] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
TR | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
GB | 22.04.2019 | ||
IE | 22.04.2019 | ||
LU | 22.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
FR | 30.04.2019 | ||
LI | 30.04.2019 | ||
Former [2020/16] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
TR | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
GB | 22.04.2019 | ||
LU | 22.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
FR | 30.04.2019 | ||
LI | 30.04.2019 | ||
Former [2020/11] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
GB | 22.04.2019 | ||
LU | 22.04.2019 | ||
BE | 30.04.2019 | ||
CH | 30.04.2019 | ||
FR | 30.04.2019 | ||
LI | 30.04.2019 | ||
Former [2020/04] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
LU | 22.04.2019 | ||
Former [2020/02] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
Former [2019/37] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
NL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
Former [2019/26] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
NL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SK | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
Former [2019/24] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
NL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SK | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
Former [2019/22] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
NL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
Former [2019/21] | AT | 01.08.2018 | |
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
IT | 01.08.2018 | ||
NL | 01.08.2018 | ||
SE | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
Former [2019/12] | AT | 01.08.2018 | |
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
NL | 01.08.2018 | ||
SE | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
Former [2019/10] | AT | 01.08.2018 | |
FI | 01.08.2018 | ||
NL | 01.08.2018 | ||
SE | 01.08.2018 | ||
BG | 01.11.2018 | ||
GR | 02.11.2018 | ||
Former [2019/09] | FI | 01.08.2018 | |
NL | 01.08.2018 | ||
Former [2019/08] | FI | 01.08.2018 | Cited in | International search | [A]US5077905 (MURRAY JR MALCOLM G [US]); | [A]US3704522 (BLUBAUGH ROBERT L, et al); | [A]US6040903 (LYSEN HEINRICH [DE], et al); | [A]US6046799 (LYSEN HEINRICH [DE]); | [A]US5980094 (NOWER DANIEL L [US]); | [A]GB2128324 (MALAK STEPHEN PAUL); | [A]US6223102 (BUSCH DIETER [DE]); | [A]US4709485 (BOWMAN DONALD E [US]); | [A]US5715609 (NOWER DANIEL L [US]) | Examination | US5026998 | US5148232 |