| EP1783786 - Cable system with magnetic screen [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2015 Database last updated on 28.03.2026 | Most recent event Tooltip | 08.07.2016 | Lapse of the patent in a contracting state New state(s): HU, TR | published on 10.08.2016 [2016/32] | Applicant(s) | For all designated states nkt cables GmbH & Co. KG Düsseldorfer Strasse 400 51061 Köln / DE | [N/P] |
| Former [2014/13] | For all designated states nkt cables GmbH Düsseldorfer Strasse 400 51061 Köln / DE | ||
| Former [2007/19] | For all designated states nkt cables GmbH Schanzenstrasse 6-20 51063 Köln / DE | Inventor(s) | 01 /
Waschk, Volker Dr. Scherfbachtalstrasse 57 51519 Odenthal / DE | [2007/22] | Application number, filing date | 06022902.8 | 03.11.2006 | [2007/19] | Priority number, date | DE20051053050 | 04.11.2005 Original published format: DE102005053050 | [2007/19] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP1783786 | Date: | 09.05.2007 | Language: | DE | [2007/19] | Type: | A3 Search report | No.: | EP1783786 | Date: | 14.07.2010 | [2010/28] | Type: | B1 Patent specification | No.: | EP1783786 | Date: | 03.09.2014 | Language: | DE | [2014/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.06.2010 | Classification | IPC: | H01B9/02 | [2007/19] | CPC: |
H01B9/023 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2007/19] | Title | German: | Kabelsystem mit magnetischer Schirmungshülle | [2007/19] | English: | Cable system with magnetic screen | [2007/19] | French: | Système de câble avec un écran magnétique | [2007/19] | Examination procedure | 13.01.2011 | Amendment by applicant (claims and/or description) | 13.01.2011 | Examination requested [2011/09] | 03.06.2014 | Communication of intention to grant the patent | 23.07.2014 | Fee for grant paid | 23.07.2014 | Fee for publishing/printing paid | 24.07.2014 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 03.06.2014 | Opposition(s) | 04.06.2015 | No opposition filed within time limit [2015/33] | Fees paid | Renewal fee | 17.11.2008 | Renewal fee patent year 03 | 24.11.2009 | Renewal fee patent year 04 | 23.11.2010 | Renewal fee patent year 05 | 12.12.2011 | Renewal fee patent year 06 | 23.11.2012 | Renewal fee patent year 07 | 28.11.2013 | Renewal fee patent year 08 | Penalty fee | Additional fee for renewal fee | 30.11.2011 | 06   M06   Fee paid on   12.12.2011 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.11.2006 | BG | 03.09.2014 | CY | 03.09.2014 | CZ | 03.09.2014 | DK | 03.09.2014 | EE | 03.09.2014 | ES | 03.09.2014 | LT | 03.09.2014 | LV | 03.09.2014 | MC | 03.09.2014 | PL | 03.09.2014 | RO | 03.09.2014 | SE | 03.09.2014 | SI | 03.09.2014 | SK | 03.09.2014 | TR | 03.09.2014 | AT | 03.11.2014 | LU | 03.11.2014 | GR | 04.12.2014 | IS | 03.01.2015 | PT | 05.01.2015 | [2016/32] |
| Former [2016/25] | BG | 03.09.2014 | |
| CY | 03.09.2014 | ||
| CZ | 03.09.2014 | ||
| DK | 03.09.2014 | ||
| EE | 03.09.2014 | ||
| ES | 03.09.2014 | ||
| LT | 03.09.2014 | ||
| LV | 03.09.2014 | ||
| MC | 03.09.2014 | ||
| PL | 03.09.2014 | ||
| RO | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| SI | 03.09.2014 | ||
| SK | 03.09.2014 | ||
| AT | 03.11.2014 | ||
| LU | 03.11.2014 | ||
| GR | 04.12.2014 | ||
| IS | 03.01.2015 | ||
| PT | 05.01.2015 | ||
| Former [2016/12] | CY | 03.09.2014 | |
| CZ | 03.09.2014 | ||
| DK | 03.09.2014 | ||
| EE | 03.09.2014 | ||
| ES | 03.09.2014 | ||
| LT | 03.09.2014 | ||
| LV | 03.09.2014 | ||
| MC | 03.09.2014 | ||
| PL | 03.09.2014 | ||
| RO | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| SI | 03.09.2014 | ||
| SK | 03.09.2014 | ||
| AT | 03.11.2014 | ||
| LU | 03.11.2014 | ||
| GR | 04.12.2014 | ||
| IS | 03.01.2015 | ||
| PT | 05.01.2015 | ||
| Former [2015/50] | CY | 03.09.2014 | |
| CZ | 03.09.2014 | ||
| DK | 03.09.2014 | ||
| EE | 03.09.2014 | ||
| ES | 03.09.2014 | ||
| LT | 03.09.2014 | ||
| LV | 03.09.2014 | ||
| MC | 03.09.2014 | ||
| PL | 03.09.2014 | ||
| RO | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| SI | 03.09.2014 | ||
| SK | 03.09.2014 | ||
| LU | 03.11.2014 | ||
| GR | 04.12.2014 | ||
| IS | 03.01.2015 | ||
| PT | 05.01.2015 | ||
| Former [2015/34] | CY | 03.09.2014 | |
| CZ | 03.09.2014 | ||
| DK | 03.09.2014 | ||
| EE | 03.09.2014 | ||
| ES | 03.09.2014 | ||
| LT | 03.09.2014 | ||
| LV | 03.09.2014 | ||
| MC | 03.09.2014 | ||
| PL | 03.09.2014 | ||
| RO | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| SK | 03.09.2014 | ||
| LU | 03.11.2014 | ||
| GR | 04.12.2014 | ||
| IS | 03.01.2015 | ||
| PT | 05.01.2015 | ||
| Former [2015/32] | CY | 03.09.2014 | |
| CZ | 03.09.2014 | ||
| EE | 03.09.2014 | ||
| ES | 03.09.2014 | ||
| LT | 03.09.2014 | ||
| LV | 03.09.2014 | ||
| MC | 03.09.2014 | ||
| PL | 03.09.2014 | ||
| RO | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| SK | 03.09.2014 | ||
| LU | 03.11.2014 | ||
| GR | 04.12.2014 | ||
| IS | 03.01.2015 | ||
| PT | 05.01.2015 | ||
| Former [2015/30] | CY | 03.09.2014 | |
| CZ | 03.09.2014 | ||
| EE | 03.09.2014 | ||
| ES | 03.09.2014 | ||
| LT | 03.09.2014 | ||
| LV | 03.09.2014 | ||
| PL | 03.09.2014 | ||
| RO | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| SK | 03.09.2014 | ||
| LU | 03.11.2014 | ||
| GR | 04.12.2014 | ||
| IS | 03.01.2015 | ||
| PT | 05.01.2015 | ||
| Former [2015/24] | CY | 03.09.2014 | |
| CZ | 03.09.2014 | ||
| EE | 03.09.2014 | ||
| ES | 03.09.2014 | ||
| LT | 03.09.2014 | ||
| LV | 03.09.2014 | ||
| PL | 03.09.2014 | ||
| RO | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| SK | 03.09.2014 | ||
| GR | 04.12.2014 | ||
| IS | 03.01.2015 | ||
| PT | 05.01.2015 | ||
| Former [2015/23] | CY | 03.09.2014 | |
| CZ | 03.09.2014 | ||
| EE | 03.09.2014 | ||
| ES | 03.09.2014 | ||
| LT | 03.09.2014 | ||
| LV | 03.09.2014 | ||
| RO | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| SK | 03.09.2014 | ||
| GR | 04.12.2014 | ||
| IS | 03.01.2015 | ||
| PT | 05.01.2015 | ||
| Former [2015/22] | CY | 03.09.2014 | |
| ES | 03.09.2014 | ||
| LT | 03.09.2014 | ||
| LV | 03.09.2014 | ||
| RO | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| GR | 04.12.2014 | ||
| PT | 05.01.2015 | ||
| Former [2015/12] | CY | 03.09.2014 | |
| ES | 03.09.2014 | ||
| LT | 03.09.2014 | ||
| LV | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| GR | 04.12.2014 | ||
| Former [2015/11] | CY | 03.09.2014 | |
| ES | 03.09.2014 | ||
| LT | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| GR | 04.12.2014 | ||
| Former [2015/10] | ES | 03.09.2014 | |
| LT | 03.09.2014 | ||
| SE | 03.09.2014 | ||
| Former [2015/09] | LT | 03.09.2014 | |
| SE | 03.09.2014 | ||
| Former [2015/08] | LT | 03.09.2014 | Documents cited: | Search | [Y] CH346920 (SIEMENS AG et al.) [Y] 1-15 * page 1, line 1 - line 19 * * page 1, line 56 - page 2, line 3; figure . * | [Y] WO03003382 (PIRELLI CAVI E SISTEMI SPA et al.) [Y] 1-4,8,10-15 * page 1, line 5 - line 24 * * page 7, line 13 - line 22 * * page 12, line 20 - line 37 * * figure 1 * | [YD] DE3123040 (VACUUMSCHMELZE GMBH et al.) [YD] 5-7,9 * page 2, line 5 - line 9 * * page 3, line 23 - line 30 * * page 4, line 19 - page 5, line 26; figure . * | [A] EP1191546 (NKT POWER CABLES AS et al.) [A] 3 * paragraph [0017] - paragraph [0018]; figure 1 * | [AD] DE19807527 (CIT ALCATEL et al.) [AD] 1 * column 2, line 31 - line 60; figure . * |