EP2056515 - Methods, apparatuses, system and related computer program product for resource allocation [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.04.2020 Database last updated on 17.05.2024 | |
Former | The patent has been granted Status updated on 10.05.2019 | ||
Former | Grant of patent is intended Status updated on 02.01.2019 | ||
Former | Examination is in progress Status updated on 11.03.2017 | Most recent event Tooltip | 23.07.2021 | Lapse of the patent in a contracting state New state(s): MT | published on 25.08.2021 [2021/34] | Applicant(s) | For all designated states CELLULAR COMMUNICATIONS EQUIPMENT LLC 2400 Dallas Parkway Suite 200 Plano, TX 75093 / US | [2019/24] |
Former [2015/34] | For all designated states CELLULAR COMMUNICATIONS EQUIPMENT LLC 2400 Dallas Parkway Suite 200 Plano, TX 75093 / US | ||
Former [2013/46] | For all designated states Nokia Solutions and Networks Oy Karaportti 3 02610 Espoo / FI | ||
Former [2009/19] | For all designated states Nokia Siemens Networks Oy Karaportti 3 02610 Espoo / FI | Inventor(s) | 01 /
Hooli, Kari Nykäsenkankaantie 6 A 7 90650, Oulu / FI | 02 /
Pajukoski, Kari Purantie 3 90240, Oulu / FI | 03 /
Tiirola, Esa Porttikellonkuja 12 90450, Kempele / FI | [2009/19] | Representative(s) | Bosch Jehle Patentanwaltsgesellschaft mbH Flüggenstraße 13 80639 München / DE | [2019/24] |
Former [2009/19] | TBK-Patent Bavariaring 4-6 80336 München / DE | Application number, filing date | 07119645.5 | 30.10.2007 | [2009/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2056515 | Date: | 06.05.2009 | Language: | EN | [2009/19] | Type: | B1 Patent specification | No.: | EP2056515 | Date: | 12.06.2019 | Language: | EN | [2019/24] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.04.2008 | Classification | IPC: | H04L5/00, H04J11/00, H04L27/26, // H04J13/00, H04J13/10 | [2019/03] | CPC: |
H04L5/0007 (EP,US);
H04J11/00 (EP,US);
H04L27/2613 (EP,US);
H04L5/0037 (EP,US);
H04J13/0074 (EP,US);
H04J13/10 (EP,US);
|
Former IPC [2019/01] | H04J11/00, H04J13/10, H04L27/26 | ||
Former IPC [2009/19] | H04L5/02 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR [2019/24] |
Former [2009/19] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | Verfahren, Vorrichtungen, System und entsprechendes Computerprogrammprodukt zur Ressourcenzuweisung | [2009/19] | English: | Methods, apparatuses, system and related computer program product for resource allocation | [2009/19] | French: | Procédés, appareils, système et produit de programme informatique correspondant pour l'affectation de ressources | [2009/19] | Examination procedure | 05.11.2009 | Examination requested [2009/51] | 26.01.2010 | Despatch of a communication from the examining division (Time limit: M06) | 04.08.2010 | Reply to a communication from the examining division | 01.03.2017 | Despatch of a communication from the examining division (Time limit: M04) | 07.07.2017 | Reply to a communication from the examining division | 30.04.2018 | Despatch of a communication from the examining division (Time limit: M04) | 29.08.2018 | Reply to a communication from the examining division | 03.01.2019 | Communication of intention to grant the patent | 03.05.2019 | Fee for grant paid | 03.05.2019 | Fee for publishing/printing paid | 03.05.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | EP18194013.1 / EP3432504 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.01.2010 | Opposition(s) | 13.03.2020 | No opposition filed within time limit [2020/21] | Fees paid | Renewal fee | 27.10.2009 | Renewal fee patent year 03 | 25.10.2010 | Renewal fee patent year 04 | 20.10.2011 | Renewal fee patent year 05 | 23.10.2012 | Renewal fee patent year 06 | 24.10.2013 | Renewal fee patent year 07 | 23.10.2014 | Renewal fee patent year 08 | 12.10.2015 | Renewal fee patent year 09 | 11.10.2016 | Renewal fee patent year 10 | 11.04.2018 | Renewal fee patent year 11 | 25.10.2018 | Renewal fee patent year 12 | Penalty fee | Additional fee for renewal fee | 31.10.2017 | 11   M06   Fee paid on   11.04.2018 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.10.2007 | AT | 12.06.2019 | CY | 12.06.2019 | CZ | 12.06.2019 | DK | 12.06.2019 | EE | 12.06.2019 | ES | 12.06.2019 | FI | 12.06.2019 | IT | 12.06.2019 | LT | 12.06.2019 | LV | 12.06.2019 | MC | 12.06.2019 | MT | 12.06.2019 | NL | 12.06.2019 | PL | 12.06.2019 | RO | 12.06.2019 | SE | 12.06.2019 | SI | 12.06.2019 | SK | 12.06.2019 | TR | 12.06.2019 | BG | 12.09.2019 | GR | 13.09.2019 | PT | 14.10.2019 | IE | 30.10.2019 | LU | 30.10.2019 | BE | 31.10.2019 | CH | 31.10.2019 | FR | 31.10.2019 | LI | 31.10.2019 | IS | 12.11.2019 | [2021/34] |
Former [2021/33] | HU | 30.10.2007 | |
AT | 12.06.2019 | ||
CY | 12.06.2019 | ||
CZ | 12.06.2019 | ||
DK | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
NL | 12.06.2019 | ||
PL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
IE | 30.10.2019 | ||
LU | 30.10.2019 | ||
BE | 31.10.2019 | ||
CH | 31.10.2019 | ||
FR | 31.10.2019 | ||
LI | 31.10.2019 | ||
IS | 12.11.2019 | ||
Former [2021/26] | AT | 12.06.2019 | |
CY | 12.06.2019 | ||
CZ | 12.06.2019 | ||
DK | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
NL | 12.06.2019 | ||
PL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
IE | 30.10.2019 | ||
LU | 30.10.2019 | ||
BE | 31.10.2019 | ||
CH | 31.10.2019 | ||
FR | 31.10.2019 | ||
LI | 31.10.2019 | ||
IS | 12.11.2019 | ||
Former [2020/49] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
DK | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
NL | 12.06.2019 | ||
PL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
IE | 30.10.2019 | ||
LU | 30.10.2019 | ||
BE | 31.10.2019 | ||
CH | 31.10.2019 | ||
FR | 31.10.2019 | ||
LI | 31.10.2019 | ||
IS | 12.11.2019 | ||
Former [2020/46] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
DK | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
NL | 12.06.2019 | ||
PL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
IE | 30.10.2019 | ||
LU | 30.10.2019 | ||
BE | 31.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
IS | 12.11.2019 | ||
Former [2020/38] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
DK | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
NL | 12.06.2019 | ||
PL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
LU | 30.10.2019 | ||
BE | 31.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
IS | 12.11.2019 | ||
Former [2020/36] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
DK | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
NL | 12.06.2019 | ||
PL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
LU | 30.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
IS | 12.11.2019 | ||
Former [2020/35] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
DK | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
NL | 12.06.2019 | ||
PL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
LU | 30.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/34] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
DK | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
NL | 12.06.2019 | ||
PL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
CH | 31.10.2019 | ||
LI | 31.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/29] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
DK | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
MC | 12.06.2019 | ||
NL | 12.06.2019 | ||
PL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
DK | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
NL | 12.06.2019 | ||
PL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SI | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/22] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
DK | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
NL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
IS | 12.10.2019 | ||
PT | 14.10.2019 | ||
Former [2020/17] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
NL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SK | 12.06.2019 | ||
TR | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
IS | 12.10.2019 | ||
PT | 14.10.2019 | ||
Former [2020/12] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
IT | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
NL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SK | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
IS | 12.10.2019 | ||
PT | 14.10.2019 | ||
Former [2020/11] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
EE | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
NL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
SK | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
Former [2020/10] | AT | 12.06.2019 | |
CZ | 12.06.2019 | ||
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
NL | 12.06.2019 | ||
RO | 12.06.2019 | ||
SE | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
PT | 14.10.2019 | ||
Former [2020/09] | CZ | 12.06.2019 | |
ES | 12.06.2019 | ||
FI | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
NL | 12.06.2019 | ||
SE | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
Former [2020/07] | ES | 12.06.2019 | |
FI | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
NL | 12.06.2019 | ||
SE | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
Former [2019/51] | ES | 12.06.2019 | |
FI | 12.06.2019 | ||
LT | 12.06.2019 | ||
LV | 12.06.2019 | ||
SE | 12.06.2019 | ||
BG | 12.09.2019 | ||
GR | 13.09.2019 | ||
Former [2019/48] | ES | 12.06.2019 | |
FI | 12.06.2019 | ||
LT | 12.06.2019 | ||
SE | 12.06.2019 | ||
Former [2019/47] | ES | 12.06.2019 | |
FI | 12.06.2019 | ||
LT | 12.06.2019 | Documents cited: | Search | [A]WO2006109439 (NTT DOCOMO INC [JP], et al); | [E]EP1865733 (NTT DOCOMO INC [JP]) [E] 1-5,16-18,22,28,29,34-42 * the whole document *; | [X] - TEXAS INSTRUMENTS, "On Allocation of Uplink Piot Sub-Channels in EUTRA SC-FDMA", 3GPP TSG-RAN WG1 MEETING AD HOC LTE, XX, XX, (20050829), no. R1-50822, pages 1 - 7, XP002448008 [X] 1-5,16-18,22,28,29,34-42 * paragraphs [0001] - [0003] * |