EP2149214 - PHASE SYNCHRONIZATION OF NODES IN A TELECOMMUNICATION NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.05.2015 Database last updated on 06.11.2024 | Most recent event Tooltip | 13.10.2017 | Lapse of the patent in a contracting state New state(s): HU, TR | published on 15.11.2017 [2017/46] | Applicant(s) | For all designated states Orange 78, rue Olivier de Serres 75015 Paris / FR | [2013/39] |
Former [2010/05] | For all designated states FRANCE TELECOM 6 place d'Alleray 75015 Paris / FR | ||
Former [2010/05] | For all designated states France Télécom 6 Place d'Alleray 75015 Paris / FR | Inventor(s) | 01 /
JOBERT, Sebastien 44, rue de Botlezan F-22140 Begard / FR | 02 /
DELETRE, Fabrice 16, rue Jean-Marie de Penguern F-22300 Lannion / FR | 03 /
MORLON, Yves 32 rue du Hingar F-22300 Lannion / FR | [2010/05] | Representative(s) | Regimbeau 20, rue de Chazelles 75847 Paris Cedex 17 / FR | [2012/49] |
Former [2012/26] | Moisand, Thomas Marie, et al Cabinet Regimbeau 20, rue de Chazelles 75847 Paris Cedex 17 / FR | ||
Former [2010/05] | Bonnetat, Christian, et al Bloch & Bonnétat 23bis, rue de Turin 75008 Paris / FR | Application number, filing date | 08805818.5 | 20.05.2008 | [2010/05] | WO2008FR50872 | Priority number, date | FR20070055203 | 22.05.2007 Original published format: FR 0755203 | [2010/05] | Filing language | FR | Procedural language | FR | Publication | Type: | A2 Application without search report | No.: | WO2008149028 | Date: | 11.12.2008 | Language: | FR | [2008/50] | Type: | A2 Application without search report | No.: | EP2149214 | Date: | 03.02.2010 | Language: | FR | The application published by WIPO in one of the EPO official languages on 11.12.2008 takes the place of the publication of the European patent application. | [2010/05] | Type: | B1 Patent specification | No.: | EP2149214 | Date: | 02.07.2014 | Language: | FR | [2014/27] | Search report(s) | International search report - published on: | EP | 14.05.2009 | Classification | IPC: | H04J3/06 | [2010/05] | CPC: |
H04J3/0667 (EP,US);
H04J3/067 (EP,US);
H04L7/06 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2010/05] | Extension states | AL | Not yet paid | BA | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | PHASENSYNCHRONISIERUNG VON KNOTEN IN EINEM NACHRICHTENÜBERTRAGUNGSNETZ | [2014/03] | English: | PHASE SYNCHRONIZATION OF NODES IN A TELECOMMUNICATION NETWORK | [2010/05] | French: | SYNCHRONISATION EN PHASE DE NOEUDS DANS UN RESEAU DE TELECOMMUNICATIONS | [2010/05] |
Former [2010/05] | PHASENSYNCHRONISATION VON KNOTEN IN EINEM TELEKOMMUNIKATIONSNETZWERK | Entry into regional phase | 19.11.2009 | National basic fee paid | 19.11.2009 | Designation fee(s) paid | 19.11.2009 | Examination fee paid | Examination procedure | 19.11.2009 | Examination requested [2010/05] | 14.01.2014 | Communication of intention to grant the patent | 14.05.2014 | Fee for grant paid | 14.05.2014 | Fee for publishing/printing paid | 14.05.2014 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.01.2014 | Opposition(s) | 07.04.2015 | No opposition filed within time limit [2015/24] | Fees paid | Renewal fee | 28.05.2010 | Renewal fee patent year 03 | 30.05.2011 | Renewal fee patent year 04 | 26.03.2012 | Renewal fee patent year 05 | 29.05.2013 | Renewal fee patent year 06 | 26.05.2014 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.05.2008 | AT | 02.07.2014 | CY | 02.07.2014 | CZ | 02.07.2014 | DK | 02.07.2014 | EE | 02.07.2014 | ES | 02.07.2014 | FI | 02.07.2014 | HR | 02.07.2014 | IT | 02.07.2014 | LT | 02.07.2014 | LV | 02.07.2014 | MC | 02.07.2014 | MT | 02.07.2014 | NL | 02.07.2014 | PL | 02.07.2014 | RO | 02.07.2014 | SE | 02.07.2014 | SI | 02.07.2014 | SK | 02.07.2014 | TR | 02.07.2014 | BG | 02.10.2014 | NO | 02.10.2014 | GR | 03.10.2014 | IS | 02.11.2014 | PT | 03.11.2014 | [2017/39] |
Former [2017/03] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
DK | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
MC | 02.07.2014 | ||
MT | 02.07.2014 | ||
NL | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
SE | 02.07.2014 | ||
SI | 02.07.2014 | ||
SK | 02.07.2014 | ||
BG | 02.10.2014 | ||
NO | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
Former [2016/06] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
DK | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
MC | 02.07.2014 | ||
NL | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
SE | 02.07.2014 | ||
SI | 02.07.2014 | ||
SK | 02.07.2014 | ||
BG | 02.10.2014 | ||
NO | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
Former [2015/50] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
DK | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
NL | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
SE | 02.07.2014 | ||
SI | 02.07.2014 | ||
SK | 02.07.2014 | ||
BG | 02.10.2014 | ||
NO | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
Former [2015/25] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
DK | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
NL | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
SE | 02.07.2014 | ||
SK | 02.07.2014 | ||
BG | 02.10.2014 | ||
NO | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
Former [2015/23] | CY | 02.07.2014 | |
CZ | 02.07.2014 | ||
DK | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
NL | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
SE | 02.07.2014 | ||
SK | 02.07.2014 | ||
BG | 02.10.2014 | ||
NO | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
Former [2015/22] | CY | 02.07.2014 | |
CZ | 02.07.2014 | ||
DK | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
NL | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
SE | 02.07.2014 | ||
BG | 02.10.2014 | ||
NO | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
Former [2015/12] | CY | 02.07.2014 | |
CZ | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
NL | 02.07.2014 | ||
PL | 02.07.2014 | ||
SE | 02.07.2014 | ||
BG | 02.10.2014 | ||
NO | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
Former [2015/11] | CY | 02.07.2014 | |
CZ | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
LT | 02.07.2014 | ||
PL | 02.07.2014 | ||
SE | 02.07.2014 | ||
BG | 02.10.2014 | ||
NO | 02.10.2014 | ||
GR | 03.10.2014 | ||
PT | 03.11.2014 | ||
Former [2015/10] | CZ | 02.07.2014 | |
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
LT | 02.07.2014 | ||
SE | 02.07.2014 | ||
BG | 02.10.2014 | ||
NO | 02.10.2014 | ||
Former [2015/09] | FI | 02.07.2014 | |
LT | 02.07.2014 | ||
SE | 02.07.2014 | ||
Former [2015/08] | LT | 02.07.2014 | Cited in | International search | [A]US2003235216 (GUSTIN JAY W [US]) [A] 1,11,13,15-17 * column A; figures 1,2 * * paragraph [0054] * * paragraph [0061] *; | [A]US2002018475 (OFEK YORAM [US] ET AL) [A] 1,11,13,15-17 * figures 18q-18c,38 * * paragraph [0321] * * paragraph [0456] - paragraph [0460] * * paragraph [0463] *; | [A]WO0188746 (BRIX NETWORKS INC [US]) [A] 1,11,13,15-17 * paragraph [0043] * * paragraph [0045] * * figure 2 *; | [A]US5559796 (EDEM BRIAN C [US] ET AL) [A] 1,11,13,15-17 * column 13, line 13 - line 57 * * column 14, line 16 - line 45 * * column 15, line 3 - line 5 * | [A] - "B-ISDN ATM Adaptation Layer specification: Type 1 AAL; I.363.1 (08/96); B-ISDN ATM Adaptation Layer specification : Type 1 AAL", ITU-T STANDARD IN FORCE (I), INTERNATIONAL TELECOMMUNICATION UNION, GENEVA,, CH, (19960801), no. I3631 8/96, XP017401668 [A] 1,11,13,15-17 * paragraph [2.5.2.2.2] * * paragraph [2.5.2.3] * * figures 5-8 * |