EP2278838 - Method and system for power-limited switching and/or routing in a network [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.02.2015 Database last updated on 20.05.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Broadcom Corporation 5300 California Avenue Irvine, CA 92617 / US | [2011/04] | Inventor(s) | 01 /
Karaoguz, Jeyhan 15 Petria Irvine, CA 92606 / US | 02 /
Diab, Wael William 1425 Vallejo Street Apt. 305 San Francisco, CA 94109 / US | 03 /
Ma, Kenneth 10111 Westminster Court Cupertino, CA 95014 / US | 04 /
Currivan, Bruce 29 Banstead Dove Canyon, CA 92679 / US | 05 /
Kim, Yongbum 7114 Glenview Drive San Jose, CA 95120 / US | 06 /
Teener, Michael Johas 23 Acacia Way Santa Cruz, CA 95062 / US | [2014/16] |
Former [2011/04] | 01 /
Karaoguz, Jeyhan 15 Petria Irvine, CA 92606 / US | ||
02 /
Diab, Wael William 1425 Vallejo Street Apt. 305 San Francisco, CA 94109 / US | |||
03 /
Ma, Kenneth 10111 Westminster Court Cupertino, CA 95014 / US | |||
04 /
Currivan, Bruce 29 Banstead Dove Canyon, CA 92679 / US | |||
05 /
Kim, Yongbum 7114 Glenview Drive San Jose, CA 95120 / US | |||
06 /
Teener, Michael Johas 23 Acacia Way Santa Cruz, CA 95062 / US | Representative(s) | Jehle, Volker Armin Bosch Jehle Patentanwaltsgesellschaft mbH Flüggenstrasse 13 80639 München / DE | [N/P] |
Former [2014/16] | Jehle, Volker Armin Bosch Jehle Patentanwaltsgesellschaft mbH Flüggenstrasse 13 80639 München / DE | ||
Former [2011/04] | Jehle, Volker Armin Bosch Jehle Patentanwaltsgesellschaft mbH Flüggenstrasse 13 80639 München / DE | Application number, filing date | 10007402.0 | 16.07.2010 | [2011/04] | Priority number, date | US20090228432P | 24.07.2009 Original published format: US 228432 P | US20090634211 | 09.12.2009 Original published format: US 634211 | [2011/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2278838 | Date: | 26.01.2011 | Language: | EN | [2011/04] | Type: | B1 Patent specification | No.: | EP2278838 | Date: | 16.04.2014 | Language: | EN | [2014/16] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.12.2010 | Classification | IPC: | H04W40/10, H04L12/729 | [2013/50] | CPC: |
H04W40/10 (EP,US);
H04L45/125 (EP,US);
Y02D30/00 (EP,US);
Y02D30/70 (EP,US)
|
Former IPC [2011/04] | H04W40/10, // H04L12/56 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2011/04] | Title | German: | Verfahren und System zur leistungsbegrenzten Umschaltung und/oder Leitweglenkung in einem Netzwerk | [2011/04] | English: | Method and system for power-limited switching and/or routing in a network | [2011/04] | French: | Procédé et système pour la commutation de limite de puissance et/ou le routage dans un réseau | [2011/04] | Examination procedure | 16.07.2010 | Examination requested [2011/04] | 14.01.2011 | Despatch of a communication from the examining division (Time limit: M04) | 16.05.2011 | Reply to a communication from the examining division | 13.10.2011 | Despatch of a communication from the examining division (Time limit: M06) | 13.04.2012 | Reply to a communication from the examining division | 13.09.2012 | Despatch of a communication from the examining division (Time limit: M06) | 14.03.2013 | Reply to a communication from the examining division | 20.11.2013 | Communication of intention to grant the patent | 04.03.2014 | Fee for grant paid | 04.03.2014 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.01.2011 | Opposition(s) | 19.01.2015 | No opposition filed within time limit [2015/13] | Fees paid | Renewal fee | 31.07.2012 | Renewal fee patent year 03 | 31.07.2013 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.07.2010 | AL | 16.04.2014 | AT | 16.04.2014 | BE | 16.04.2014 | CY | 16.04.2014 | CZ | 16.04.2014 | DK | 16.04.2014 | EE | 16.04.2014 | ES | 16.04.2014 | FI | 16.04.2014 | HR | 16.04.2014 | IT | 16.04.2014 | LT | 16.04.2014 | LV | 16.04.2014 | MC | 16.04.2014 | MK | 16.04.2014 | MT | 16.04.2014 | NL | 16.04.2014 | PL | 16.04.2014 | RO | 16.04.2014 | SE | 16.04.2014 | SI | 16.04.2014 | SK | 16.04.2014 | SM | 16.04.2014 | TR | 16.04.2014 | BG | 16.07.2014 | GB | 16.07.2014 | IE | 16.07.2014 | LU | 16.07.2014 | NO | 16.07.2014 | GR | 17.07.2014 | CH | 31.07.2014 | FR | 31.07.2014 | LI | 31.07.2014 | IS | 16.08.2014 | PT | 18.08.2014 | [2018/46] |
Former [2018/30] | HU | 16.07.2010 | |
AT | 16.04.2014 | ||
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
IT | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
MC | 16.04.2014 | ||
MK | 16.04.2014 | ||
MT | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SI | 16.04.2014 | ||
SK | 16.04.2014 | ||
SM | 16.04.2014 | ||
TR | 16.04.2014 | ||
BG | 16.07.2014 | ||
GB | 16.07.2014 | ||
IE | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
CH | 31.07.2014 | ||
FR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2016/33] | HU | 16.07.2010 | |
AT | 16.04.2014 | ||
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
IT | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
MC | 16.04.2014 | ||
MT | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SI | 16.04.2014 | ||
SK | 16.04.2014 | ||
SM | 16.04.2014 | ||
TR | 16.04.2014 | ||
BG | 16.07.2014 | ||
GB | 16.07.2014 | ||
IE | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
CH | 31.07.2014 | ||
FR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2016/32] | HU | 16.07.2010 | |
AT | 16.04.2014 | ||
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
IT | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
MC | 16.04.2014 | ||
MT | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SI | 16.04.2014 | ||
SK | 16.04.2014 | ||
SM | 16.04.2014 | ||
BG | 16.07.2014 | ||
GB | 16.07.2014 | ||
IE | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
CH | 31.07.2014 | ||
FR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2016/28] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
IT | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
MC | 16.04.2014 | ||
MT | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SI | 16.04.2014 | ||
SK | 16.04.2014 | ||
SM | 16.04.2014 | ||
BG | 16.07.2014 | ||
GB | 16.07.2014 | ||
IE | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
CH | 31.07.2014 | ||
FR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2016/22] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
IT | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
MC | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SI | 16.04.2014 | ||
SK | 16.04.2014 | ||
SM | 16.04.2014 | ||
BG | 16.07.2014 | ||
GB | 16.07.2014 | ||
IE | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
CH | 31.07.2014 | ||
FR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2016/21] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
IT | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
MC | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SI | 16.04.2014 | ||
SK | 16.04.2014 | ||
BG | 16.07.2014 | ||
GB | 16.07.2014 | ||
IE | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
CH | 31.07.2014 | ||
FR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2015/37] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
IT | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SI | 16.04.2014 | ||
SK | 16.04.2014 | ||
BG | 16.07.2014 | ||
GB | 16.07.2014 | ||
IE | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
CH | 31.07.2014 | ||
FR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2015/36] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
IT | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SI | 16.04.2014 | ||
SK | 16.04.2014 | ||
BG | 16.07.2014 | ||
GB | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
CH | 31.07.2014 | ||
FR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2015/24] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
IT | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SK | 16.04.2014 | ||
BG | 16.07.2014 | ||
GB | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
CH | 31.07.2014 | ||
FR | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2015/20] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
IT | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SK | 16.04.2014 | ||
BG | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
CH | 31.07.2014 | ||
LI | 31.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2015/18] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
IT | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SK | 16.04.2014 | ||
BG | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2015/13] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SK | 16.04.2014 | ||
BG | 16.07.2014 | ||
LU | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2015/11] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
RO | 16.04.2014 | ||
SE | 16.04.2014 | ||
SK | 16.04.2014 | ||
BG | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2015/10] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
CZ | 16.04.2014 | ||
DK | 16.04.2014 | ||
EE | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
SE | 16.04.2014 | ||
SK | 16.04.2014 | ||
BG | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2015/08] | AT | 16.04.2014 | |
BE | 16.04.2014 | ||
CY | 16.04.2014 | ||
DK | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
SE | 16.04.2014 | ||
BG | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2015/02] | AT | 16.04.2014 | |
CY | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
SE | 16.04.2014 | ||
BG | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
IS | 16.08.2014 | ||
PT | 18.08.2014 | ||
Former [2014/51] | AT | 16.04.2014 | |
CY | 16.04.2014 | ||
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
SE | 16.04.2014 | ||
BG | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
IS | 16.08.2014 | ||
Former [2014/50] | CY | 16.04.2014 | |
ES | 16.04.2014 | ||
FI | 16.04.2014 | ||
HR | 16.04.2014 | ||
LT | 16.04.2014 | ||
LV | 16.04.2014 | ||
NL | 16.04.2014 | ||
PL | 16.04.2014 | ||
SE | 16.04.2014 | ||
BG | 16.07.2014 | ||
NO | 16.07.2014 | ||
GR | 17.07.2014 | ||
IS | 16.08.2014 | ||
Former [2014/49] | CY | 16.04.2014 | |
FI | 16.04.2014 | ||
LT | 16.04.2014 | ||
BG | 16.07.2014 | ||
NO | 16.07.2014 | ||
IS | 16.08.2014 | ||
Former [2014/48] | CY | 16.04.2014 | |
LT | 16.04.2014 | ||
BG | 16.07.2014 | ||
Former [2014/47] | CY | 16.04.2014 | Documents cited: | Search | [X]EP1560370 (UNIV EDINBURGH INC UNDER THE U [GB]) [X] 1-3,11-13 * paragraphs [0011] - [0018]; claims 1-7 *; | [XY]US2006034252 (KARAOGUZ JEYHAN [US], et al) [X] 1-6,9-15 * paragraphs [0006] , [0013] - [0072] * * figures 1,2 * [Y] 7,8; | [Y] - ZHIHAO GUO ET AL, "Energy Aware Proactive MANET Routing with Prediction on Energy Consumption", WIRELESS ALGORITHMS, SYSTEMS AND APPLICATIONS, 2007. WASA 2007. INTERNATIONAL CONFERENCE ON, IEEE, PISCATAWAY, NJ, USA, (20070801), ISBN 978-0-7695-2981-3, pages 287 - 293, XP031334870 [Y] 7,8 * Chapter 3. * | Examination | US7159035 |