EP2222104 - Information exchange apparatus, method and managing system applied thereto [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.10.2019 Database last updated on 11.05.2024 | |
Former | The patent has been granted Status updated on 26.10.2018 | ||
Former | Grant of patent is intended Status updated on 10.06.2018 | ||
Former | Examination is in progress Status updated on 10.05.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Yao, Li-Ho No. 3, Ln 7, Qingtian St. Taipei / TW | [N/P] |
Former [2014/14] | For all designated states Yao, Li-ho No. 3, Ln 7, Qingtian St. Taipei / TW | ||
Former [2010/34] | For all designated states Yao, Chih-Ang 1F, No.3, Lane 7 Cing-Tian Street Taipei / TW | Inventor(s) | 01 /
Yao, Li-Ho 1F, No. 3, Lane 7, Cing-Tian Street Taipei / TW | [2018/48] |
Former [2010/34] | 01 /
Yao, Li-Ho 1F, No. 3, Lane 7, Cing-Tian Street Taipei / TW | Representative(s) | Lang, Christian, et al LangPatent Anwaltskanzlei IP Law Firm Ingolstädter Straße 5 80807 München / DE | [N/P] |
Former [2018/48] | Lang, Christian, et al LangPatent Anwaltskanzlei Ingolstädter Straße 5 80807 München / DE | ||
Former [2012/45] | Lang, Christian, et al LangPatent Anwaltskanzlei Rosenheimer Strasse 139 81671 München / DE | ||
Former [2010/34] | Lang, Christian IP Law Firm LangRaible GbR Patent- und Rechtsanwälte Herzog-Wilhelm-Straße 22 80331 München / DE | Application number, filing date | 10152539.2 | 03.02.2010 | [2010/34] | Priority number, date | TW20090103357 | 03.02.2009 Original published format: TW 98103357 | [2010/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2222104 | Date: | 25.08.2010 | Language: | EN | [2010/34] | Type: | A3 Search report | No.: | EP2222104 | Date: | 05.01.2011 | [2011/01] | Type: | B1 Patent specification | No.: | EP2222104 | Date: | 28.11.2018 | Language: | EN | [2018/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.12.2010 | Classification | IPC: | H04W8/20, H04W8/00, H04L29/08, G06Q30/00, // H04W4/02, H04W12/06, H04W88/02, G08B5/36 | [2011/01] | CPC: |
H04L67/306 (EP,US);
H04W12/06 (EP,US);
H04W88/02 (EP,US)
|
Former IPC [2010/34] | H04W8/20, H04L29/08, // H04W12/06, H04W88/02 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2018/48] |
Former [2010/34] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | Informationsaustauschvorrichtung sowie dafür angewendetes Verfahren und Verwaltungssystem | [2011/01] | English: | Information exchange apparatus, method and managing system applied thereto | [2010/34] | French: | Appareil d'échange d'informations, procédé et système de gestion appliqué à celui-ci | [2010/34] |
Former [2010/34] | Informationsaustauschvorrichtung, sowie dafür angewendetes Verfahren und Verwaltungssystem | Examination procedure | 19.01.2011 | Examination requested [2011/09] | 05.07.2011 | Amendment by applicant (claims and/or description) | 22.02.2012 | Despatch of a communication from the examining division (Time limit: M04) | 04.07.2012 | Reply to a communication from the examining division | 22.07.2013 | Despatch of a communication from the examining division (Time limit: M06) | 03.02.2014 | Reply to a communication from the examining division | 07.08.2015 | Despatch of a communication from the examining division (Time limit: M06) | 17.02.2016 | Reply to a communication from the examining division | 03.05.2017 | Despatch of a communication from the examining division (Time limit: M04) | 07.09.2017 | Reply to a communication from the examining division | 11.06.2018 | Communication of intention to grant the patent | 08.10.2018 | Fee for grant paid | 08.10.2018 | Fee for publishing/printing paid | 22.10.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.02.2012 | Opposition(s) | 29.08.2019 | No opposition filed within time limit [2019/45] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 04.07.2012 | Request for further processing filed | 04.07.2012 | Full payment received (date of receipt of payment) Request granted | 18.07.2012 | Decision despatched | Fees paid | Renewal fee | 20.01.2012 | Renewal fee patent year 03 | 13.12.2012 | Renewal fee patent year 04 | 14.02.2014 | Renewal fee patent year 05 | 21.01.2015 | Renewal fee patent year 06 | 14.01.2016 | Renewal fee patent year 07 | 27.01.2017 | Renewal fee patent year 08 | 16.02.2018 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.02.2010 | AT | 28.11.2018 | CY | 28.11.2018 | CZ | 28.11.2018 | DK | 28.11.2018 | EE | 28.11.2018 | ES | 28.11.2018 | FI | 28.11.2018 | HR | 28.11.2018 | IT | 28.11.2018 | LT | 28.11.2018 | LV | 28.11.2018 | MC | 28.11.2018 | MK | 28.11.2018 | PL | 28.11.2018 | RO | 28.11.2018 | SE | 28.11.2018 | SI | 28.11.2018 | SK | 28.11.2018 | SM | 28.11.2018 | TR | 28.11.2018 | IE | 03.02.2019 | LU | 03.02.2019 | MT | 03.02.2019 | BE | 28.02.2019 | BG | 28.02.2019 | CH | 28.02.2019 | LI | 28.02.2019 | NO | 28.02.2019 | GR | 01.03.2019 | IS | 28.03.2019 | PT | 28.03.2019 | [2022/31] |
Former [2021/33] | HU | 03.02.2010 | |
AT | 28.11.2018 | ||
CY | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
IE | 03.02.2019 | ||
LU | 03.02.2019 | ||
MT | 03.02.2019 | ||
BE | 28.02.2019 | ||
BG | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2021/26] | AT | 28.11.2018 | |
CY | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
IE | 03.02.2019 | ||
LU | 03.02.2019 | ||
MT | 03.02.2019 | ||
BE | 28.02.2019 | ||
BG | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2020/29] | AT | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
IE | 03.02.2019 | ||
LU | 03.02.2019 | ||
MT | 03.02.2019 | ||
BE | 28.02.2019 | ||
BG | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2020/17] | AT | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
IE | 03.02.2019 | ||
LU | 03.02.2019 | ||
BE | 28.02.2019 | ||
BG | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2020/12] | AT | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
IE | 03.02.2019 | ||
LU | 03.02.2019 | ||
BE | 28.02.2019 | ||
BG | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2020/09] | AT | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
IE | 03.02.2019 | ||
LU | 03.02.2019 | ||
BG | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2020/04] | AT | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
LU | 03.02.2019 | ||
BG | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/50] | AT | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
LU | 03.02.2019 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/47] | AT | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
LU | 03.02.2019 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/45] | AT | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/40] | AT | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/37] | AT | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/35] | AT | 28.11.2018 | |
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
PL | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/34] | AT | 28.11.2018 | |
DK | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/26] | AT | 28.11.2018 | |
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/24] | AT | 28.11.2018 | |
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
Former [2019/23] | AT | 28.11.2018 | |
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/22] | FI | 28.11.2018 | |
LT | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/21] | FI | 28.11.2018 | |
LT | 28.11.2018 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/20] | LT | 28.11.2018 | |
NO | 28.02.2019 | Documents cited: | Search | [X]WO2005043837 (LOPREIATO DOMENICO [IT]) [X] 1-10 * abstract * * page 3, lines 11-30 * * page 4, lines 6-26 * * page 5, line 13 - page 6, line 13 * * page 7, lines 18-29 * * page 8, lines 11-26 * * page 11, line 9 - page 13, line 10 *; | [X]DE19929188 (FISCHER PAUL [DE]) [X] 1-10 * abstract * * column 1, lines 30-48 * * column 2, lines 9-61 * * column 5, lines 19-51 * * column 6, lines 31-64 *; | [X]WO2008014014 (SONY ERICSSON MOBILE COMM AB [SE], et al) [X] 1-10 * abstract * * page 5, line 21 - page 6, line 17 * * page 8, lines 1-17 * * page 8, line 30 - page 9, line 14 *; | [X]US2007282621 (ALTMAN SAMUEL H [US], et al) [X] 11-15 * abstract * * paragraphs [0033] - [0039] * * paragraphs [0047] , [0048] , [0053] * * paragraphs [0073] - [0076] - [0093] *; | [X]WO2007119088 (MOBIFRIENDS SOLUTIONS S L [ES], et al) [X] 11-15 * abstract * * page 6, line 18 - page 10, line 32 * * page 12, line 31 - page 14, line 24 * * page 20, lines 7-29 *; | [A]US2008056269 (MADHANI SUNIL H [US], et al) [A] 11-15 * abstract * * paragraphs [0016] - [0023] * * paragraphs [0027] , [0035] , [0036] *; | [X]EP1559460 (MICROSOFT CORP [US]) [X] 16-21 * abstract * * paragraphs [0012] , [0013] , [0021] * * paragraphs [0025] , [0040] , [0041] * * paragraphs [0043] , [0046] , [0047] *; | [X]US2005194446 (WIKLOF CHRISTOPHER A [US], et al) [X] 16-21 * abstract * * paragraphs [0076] - [0079] * * paragraphs [0083] , [0084] , [0086] * * paragraphs [0091] , [0093] , [0094] *; | [A]US2004046656 (SCHAEFER ROBERT A [US], et al) [A] 16-21 * abstract * * paragraphs [0026] , [0034] , [0037] * * paragraphs [0038] , [0039] , [0048] * * paragraphs [0051] , [0055] , [0060] *; | [A]US2006142034 (WENTINK MENZO [NL], et al) [A] 16-21 * abstract * * paragraphs [0041] - [0055] * * paragraphs [0082] - [0089] * | Examination | US2005188062 |