blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2732600

EP2732600 - APPARATUS AND METHOD FOR SYNCHRONIZING EVENTS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.11.2016
Database last updated on 24.04.2024
Most recent event   Tooltip12.10.2018Lapse of the patent in a contracting state
New state(s): AL
published on 14.11.2018  [2018/46]
Applicant(s)For all designated states
Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V.
Hansastraße 27c
80686 München / DE
[2014/21]
Inventor(s)01 / MUTSCHLER, Christopher
Schleifmühlstrasse 6a
91054 Erlangen / DE
02 / WITT, Nicolas
Gabelsbergerstrasse 10
90459 Nürnberg / DE
03 / PHILIPPSEN, Michael
Tucherstrasse 29
90562 Heroldsberg / DE
04 / OTTO, Stephan
Saranskstrasse 1b
90562 Heroldsberg / DE
 [2014/33]
Former [2014/21]01 / MUTSCHLER, Christopher
Schleifmühlstrasse 6a
91054 Erlangen / DE
02 / WITT, Nicolas
Neue Gasse 18
90403 Nürnberg / DE
03 / PHILIPPSEN, Michael
Tucherstrasse 29
90562 Heroldsberg / DE
04 / OTTO, Stephan
Saranskstrasse 1b
90562 Heroldsberg / DE
Representative(s)2SPL Patentanwälte PartG mbB
Landaubogen 3
81373 München / DE
[N/P]
Former [2016/01]2SPL Patentanwälte PartG mbB
Postfach 15 17 23
80050 München / DE
Former [2014/21]2SPL Patentanwälte
Postfach 15 17 23
80050 München / DE
Application number, filing date11784447.231.10.2011
[2016/01]
WO2011EP69160
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013064172
Date:10.05.2013
Language:EN
[2013/19]
Type: A1 Application with search report 
No.:EP2732600
Date:21.05.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 10.05.2013 takes the place of the publication of the European patent application.
[2014/21]
Type: B1 Patent specification 
No.:EP2732600
Date:30.12.2015
Language:EN
[2015/53]
Search report(s)International search report - published on:EP10.05.2013
ClassificationIPC:H04L29/06, H04L29/08
[2015/32]
CPC:
H04L67/12 (EP,US); H04L67/10 (US); H04L69/28 (EP,US)
Former IPC [2014/21]H04L29/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/21]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR EREIGNISSYNCHRONISATION[2015/32]
English:APPARATUS AND METHOD FOR SYNCHRONIZING EVENTS[2014/21]
French:METHODE ET APPAREIL POUR LA SYNCRONISATION DES EVENEMENTS[2015/32]
Former [2014/21]VORRICHTUNG UND VERFAHREN ZUR EREIGNISSYNCHRONISIERUNG
Former [2014/21]APPAREIL ET PROCÉDÉ DE SYNCHRONISATION D'ÉVÉNEMENTS
Entry into regional phase04.11.2013National basic fee paid 
04.11.2013Designation fee(s) paid 
04.11.2013Examination fee paid 
Examination procedure05.07.2012Amendment by applicant (claims and/or description)
04.11.2013Examination requested  [2014/21]
23.03.2015Despatch of a communication from the examining division (Time limit: M04)
03.06.2015Reply to a communication from the examining division
17.07.2015Communication of intention to grant the patent
20.10.2015Fee for grant paid
20.10.2015Fee for publishing/printing paid
20.10.2015Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  23.03.2015
Opposition(s)03.10.2016No opposition filed within time limit [2016/49]
Fees paidRenewal fee
04.11.2013Renewal fee patent year 03
31.10.2014Renewal fee patent year 04
02.11.2015Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.10.2011
AL30.12.2015
BG30.12.2015
CY30.12.2015
CZ30.12.2015
DK30.12.2015
EE30.12.2015
HR30.12.2015
LT30.12.2015
LV30.12.2015
MC30.12.2015
MK30.12.2015
PL30.12.2015
RO30.12.2015
RS30.12.2015
SE30.12.2015
SI30.12.2015
SK30.12.2015
SM30.12.2015
TR30.12.2015
NO30.03.2016
GR31.03.2016
IS30.04.2016
PT02.05.2016
[2018/46]
Former [2018/45]HU31.10.2011
BG30.12.2015
CY30.12.2015
CZ30.12.2015
DK30.12.2015
EE30.12.2015
HR30.12.2015
LT30.12.2015
LV30.12.2015
MC30.12.2015
MK30.12.2015
PL30.12.2015
RO30.12.2015
RS30.12.2015
SE30.12.2015
SI30.12.2015
SK30.12.2015
SM30.12.2015
TR30.12.2015
NO30.03.2016
GR31.03.2016
IS30.04.2016
PT02.05.2016
Former [2018/38]HU31.10.2011
BG30.12.2015
CY30.12.2015
CZ30.12.2015
DK30.12.2015
EE30.12.2015
HR30.12.2015
LT30.12.2015
LV30.12.2015
MC30.12.2015
MK30.12.2015
PL30.12.2015
RO30.12.2015
RS30.12.2015
SE30.12.2015
SI30.12.2015
SK30.12.2015
SM30.12.2015
NO30.03.2016
GR31.03.2016
IS30.04.2016
PT02.05.2016
Former [2018/31]HU31.10.2011
CY30.12.2015
CZ30.12.2015
DK30.12.2015
EE30.12.2015
HR30.12.2015
LT30.12.2015
LV30.12.2015
MC30.12.2015
MK30.12.2015
PL30.12.2015
RO30.12.2015
RS30.12.2015
SE30.12.2015
SI30.12.2015
SK30.12.2015
SM30.12.2015
NO30.03.2016
GR31.03.2016
IS30.04.2016
PT02.05.2016
Former [2018/28]HU31.10.2011
CY30.12.2015
CZ30.12.2015
DK30.12.2015
EE30.12.2015
HR30.12.2015
LT30.12.2015
LV30.12.2015
MC30.12.2015
MK30.12.2015
PL30.12.2015
RO30.12.2015
RS30.12.2015
SE30.12.2015
SI30.12.2015
SK30.12.2015
SM30.12.2015
NO30.03.2016
GR31.03.2016
IS30.04.2016
PT02.05.2016
Former [2017/16]CZ30.12.2015
DK30.12.2015
EE30.12.2015
HR30.12.2015
LT30.12.2015
LV30.12.2015
PL30.12.2015
RO30.12.2015
RS30.12.2015
SE30.12.2015
SI30.12.2015
SK30.12.2015
SM30.12.2015
NO30.03.2016
GR31.03.2016
IS30.04.2016
PT02.05.2016
Former [2016/46]CZ30.12.2015
DK30.12.2015
EE30.12.2015
HR30.12.2015
LT30.12.2015
LV30.12.2015
PL30.12.2015
RO30.12.2015
RS30.12.2015
SE30.12.2015
SK30.12.2015
SM30.12.2015
NO30.03.2016
GR31.03.2016
IS30.04.2016
PT02.05.2016
Former [2016/38]CZ30.12.2015
EE30.12.2015
HR30.12.2015
LT30.12.2015
LV30.12.2015
PL30.12.2015
RO30.12.2015
RS30.12.2015
SE30.12.2015
SK30.12.2015
SM30.12.2015
NO30.03.2016
GR31.03.2016
IS30.04.2016
PT02.05.2016
Former [2016/36]CZ30.12.2015
EE30.12.2015
HR30.12.2015
LT30.12.2015
LV30.12.2015
PL30.12.2015
RO30.12.2015
RS30.12.2015
SE30.12.2015
SK30.12.2015
NO30.03.2016
GR31.03.2016
Former [2016/34]CZ30.12.2015
HR30.12.2015
LT30.12.2015
LV30.12.2015
RS30.12.2015
SE30.12.2015
NO30.03.2016
GR31.03.2016
Former [2016/25]HR30.12.2015
LT30.12.2015
LV30.12.2015
RS30.12.2015
SE30.12.2015
NO30.03.2016
GR31.03.2016
Former [2016/24]HR30.12.2015
LT30.12.2015
RS30.12.2015
SE30.12.2015
NO30.03.2016
GR31.03.2016
Former [2016/23]HR30.12.2015
LT30.12.2015
RS30.12.2015
SE30.12.2015
NO30.03.2016
Former [2016/21]LT30.12.2015
NO30.03.2016
Former [2016/20]LT30.12.2015
Cited inInternational search[XI]US2005125150  (WANG DAVID [CA], et al) [X] 1-4,9-11,14,17,18 * abstract * * paragraph [0020] - paragraph [0027] * * figure 2 * * claim 59 * [I] 5-7,13,15;
 [X]US2007070914  (ABIGAIL SHAWN G [CA]) [X] 1,14,17,18* abstract *;
 [X]EP2301635  (ALCATEL LUCENT [FR]) [X] 1,14,17,18 * abstract *
by applicantUS2005125150
 US2007070914
 EP2301635
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.