| EP2464042 - CHANNEL ARRANGEMENT METHOD AND RADIO COMMUNCATION BASE STATION DEVICE [Right-click to bookmark this link] | |||
| Former [2012/24] | Channel arrangement method and radio communcation base station device | ||
| [2014/13] | Status | No opposition filed within time limit Status updated on 12.06.2015 Database last updated on 14.03.2026 | Most recent event Tooltip | 01.09.2017 | Lapse of the patent in a contracting state New state(s): HU | published on 04.10.2017 [2017/40] | Applicant(s) | For all designated states Panasonic Intellectual Property Corporation of America 20000 Mariner Avenue, Suite 200 Torrance, CA 90503 / US | [N/P] |
| Former [2014/30] | For all designated states Panasonic Intellectual Property Corporation of America 20000 Mariner Avenue Suite 200 Torrance CA 90503 / US | ||
| Former [2012/24] | For all designated states Panasonic Corporation 1006, Oaza Kadoma Kadoma-shi Osaka 571-8501 / JP | Inventor(s) | 01 /
Nishio, Akihiko c/o Panasonic Corporation IPROC 7F Twin 21 OBP Panasonic Tower 2-1-61, Shiromi, Chuo-ku Osaka-shi, Osaka 540-6207 / JP | 02 /
Wengerter, Christian c/o Panasonic R&D center Germany GmbH Monzastrasse 4c 63225 Langen / DE | 03 /
Suzuki, Hidetoshi c/o Panasonic Corporation IPROC 7F Twin 21 OBP Panasonic Tower 2-1-61, Shiromi, Chuo-ku Osaka-shi, Osaka 540-6207 / JP | 04 /
Fukuoka, Masaru c/o Panasonic Corporation IPROC 7F Twin 21 OBP Panasonic Tower 2-1-61, Shiromi, Chuo-ku Osaka-shi, Osaka 540-6207 / JP | [2014/13] |
| Former [2012/24] | 01 /
Nishio, Akihiko c/o Panasonic Corporation IPROC 7F Twin 21 OBP Panasonic Tower 2-1-61, Shiromi, Chuo-ku Osaka-shi, Osaka 540-6207 / JP | ||
| 02 /
Wengerter, Christian c/o Panasonic R&D center Germany GmbH Monzastrasse 4c 63225 Langen 63225 Langen / DE | |||
| 03 /
Suzuki, Hidetoshi c/o Panasonic Corporation IPROC 7F Twin 21 OBP Panasonic Tower 2-1-61, Shiromi, Chuo-ku Osaka-shi, Osaka 540-6207 / JP | |||
| 04 /
Fukuoka, Masaru c/o Panasonic Corporation IPROC 7F Twin 21 OBP Panasonic Tower 2-1-61, Shiromi, Chuo-ku Osaka-shi, Osaka 540-6207 / JP | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [N/P] |
| Former [2012/24] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Leopoldstrasse 4 80802 München / DE | Application number, filing date | 12158789.3 | 18.06.2008 | [2012/24] | Priority number, date | JP20070161958 | 19.06.2007 Original published format: JP 2007161958 | JP20070211545 | 14.08.2007 Original published format: JP 2007211545 | JP20080056561 | 06.03.2008 Original published format: JP 2008056561 | [2012/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2464042 | Date: | 13.06.2012 | Language: | EN | [2012/24] | Type: | B1 Patent specification | No.: | EP2464042 | Date: | 06.08.2014 | Language: | EN | [2014/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.04.2012 | Classification | IPC: | H04W72/04 | [2014/10] | CPC: |
H04B7/12 (EP,BR,US);
H04W72/0446 (EP,BR,KR,US);
H04W72/23 (KR);
H04L1/0003 (EP,BR,US);
H04L1/0009 (EP,BR,US);
H04L1/0071 (EP,BR,US);
H04L5/0007 (EP,BR,KR,US);
H04L5/0028 (EP,BR,KR,US);
H04L5/0037 (KR);
H04L5/0039 (EP,BR,US);
H04L5/0041 (EP,BR,US);
H04L5/0092 (EP,BR,KR,US);
H04W72/0453 (EP,BR,KR,US);
H04L5/006 (EP,BR,US);
H04L5/0064 (EP,BR,US);
|
| Former IPC [2012/24] | H04J1/00, H04J3/00, H04J11/00, H04L5/00, H04L1/00, H04B7/12 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2012/24] | Title | German: | KANALANORDNUNGSVERFAHREN UND BASISSTATIONSVORRICHTUNG FÜR FUNKKOMMUNIKATION | [2014/10] | English: | CHANNEL ARRANGEMENT METHOD AND RADIO COMMUNCATION BASE STATION DEVICE | [2014/13] | French: | PROCÉDÉ D'AGENCEMENT DE CANAL ET DISPOSITIF D'UNE STATION DE BASE DE RADIOCOMMUNICATION | [2014/10] |
| Former [2012/24] | Kanalanordnungsverfahren und Basisstationsvorrichtung für Funkkommunikation | ||
| Former [2012/24] | Channel arrangement method and radio communcation base station device | ||
| Former [2012/24] | Procédé d'agencement de canal et dispositif d'une station de base de radiocommunication | Examination procedure | 09.03.2012 | Examination requested [2012/24] | 09.07.2012 | Amendment by applicant (claims and/or description) | 20.08.2012 | Despatch of a communication from the examining division (Time limit: M04) | 29.11.2012 | Reply to a communication from the examining division | 15.01.2014 | Cancellation of oral proceeding that was planned for 21.01.2014 | 21.01.2014 | Date of oral proceedings (cancelled) | 28.02.2014 | Communication of intention to grant the patent | 18.06.2014 | Fee for grant paid | 18.06.2014 | Fee for publishing/printing paid | 18.06.2014 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP08776722.4 / EP2169855 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20080776722) is 23.08.2012 | Opposition(s) | 07.05.2015 | No opposition filed within time limit [2015/29] | Fees paid | Renewal fee | 09.03.2012 | Renewal fee patent year 03 | 09.03.2012 | Renewal fee patent year 04 | 25.05.2012 | Renewal fee patent year 05 | 27.06.2013 | Renewal fee patent year 06 | 25.06.2014 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.06.2008 | AT | 06.08.2014 | BE | 06.08.2014 | CY | 06.08.2014 | CZ | 06.08.2014 | DK | 06.08.2014 | EE | 06.08.2014 | FI | 06.08.2014 | HR | 06.08.2014 | LT | 06.08.2014 | LV | 06.08.2014 | MC | 06.08.2014 | MT | 06.08.2014 | PL | 06.08.2014 | RO | 06.08.2014 | SI | 06.08.2014 | SK | 06.08.2014 | BG | 06.11.2014 | NO | 06.11.2014 | GR | 07.11.2014 | IS | 06.12.2014 | PT | 09.12.2014 | [2017/40] |
| Former [2017/03] | AT | 06.08.2014 | |
| BE | 06.08.2014 | ||
| CY | 06.08.2014 | ||
| CZ | 06.08.2014 | ||
| DK | 06.08.2014 | ||
| EE | 06.08.2014 | ||
| FI | 06.08.2014 | ||
| HR | 06.08.2014 | ||
| LT | 06.08.2014 | ||
| LV | 06.08.2014 | ||
| MC | 06.08.2014 | ||
| MT | 06.08.2014 | ||
| PL | 06.08.2014 | ||
| RO | 06.08.2014 | ||
| SI | 06.08.2014 | ||
| SK | 06.08.2014 | ||
| BG | 06.11.2014 | ||
| NO | 06.11.2014 | ||
| GR | 07.11.2014 | ||
| IS | 06.12.2014 | ||
| PT | 09.12.2014 | ||
| Former [2016/32] | AT | 06.08.2014 | |
| BE | 06.08.2014 | ||
| CY | 06.08.2014 | ||
| CZ | 06.08.2014 | ||
| DK | 06.08.2014 | ||
| EE | 06.08.2014 | ||
| FI | 06.08.2014 | ||
| HR | 06.08.2014 | ||
| LT | 06.08.2014 | ||
| LV | 06.08.2014 | ||
| MC | 06.08.2014 | ||
| PL | 06.08.2014 | ||
| RO | 06.08.2014 | ||
| SI | 06.08.2014 | ||
| SK | 06.08.2014 | ||
| BG | 06.11.2014 | ||
| NO | 06.11.2014 | ||
| GR | 07.11.2014 | ||
| IS | 06.12.2014 | ||
| PT | 09.12.2014 | ||
| Former [2016/09] | AT | 06.08.2014 | |
| CY | 06.08.2014 | ||
| CZ | 06.08.2014 | ||
| DK | 06.08.2014 | ||
| EE | 06.08.2014 | ||
| FI | 06.08.2014 | ||
| HR | 06.08.2014 | ||
| LT | 06.08.2014 | ||
| LV | 06.08.2014 | ||
| MC | 06.08.2014 | ||
| PL | 06.08.2014 | ||
| RO | 06.08.2014 | ||
| SI | 06.08.2014 | ||
| SK | 06.08.2014 | ||
| BG | 06.11.2014 | ||
| NO | 06.11.2014 | ||
| GR | 07.11.2014 | ||
| IS | 06.12.2014 | ||
| PT | 09.12.2014 | ||
| Former [2015/50] | AT | 06.08.2014 | |
| CY | 06.08.2014 | ||
| CZ | 06.08.2014 | ||
| DK | 06.08.2014 | ||
| EE | 06.08.2014 | ||
| FI | 06.08.2014 | ||
| HR | 06.08.2014 | ||
| LT | 06.08.2014 | ||
| LV | 06.08.2014 | ||
| PL | 06.08.2014 | ||
| RO | 06.08.2014 | ||
| SI | 06.08.2014 | ||
| SK | 06.08.2014 | ||
| BG | 06.11.2014 | ||
| NO | 06.11.2014 | ||
| GR | 07.11.2014 | ||
| IS | 06.12.2014 | ||
| PT | 09.12.2014 | ||
| Former [2015/23] | AT | 06.08.2014 | |
| CY | 06.08.2014 | ||
| CZ | 06.08.2014 | ||
| DK | 06.08.2014 | ||
| EE | 06.08.2014 | ||
| FI | 06.08.2014 | ||
| HR | 06.08.2014 | ||
| LT | 06.08.2014 | ||
| LV | 06.08.2014 | ||
| PL | 06.08.2014 | ||
| RO | 06.08.2014 | ||
| SK | 06.08.2014 | ||
| BG | 06.11.2014 | ||
| NO | 06.11.2014 | ||
| GR | 07.11.2014 | ||
| IS | 06.12.2014 | ||
| PT | 09.12.2014 | ||
| Former [2015/22] | AT | 06.08.2014 | |
| CY | 06.08.2014 | ||
| DK | 06.08.2014 | ||
| FI | 06.08.2014 | ||
| HR | 06.08.2014 | ||
| LT | 06.08.2014 | ||
| LV | 06.08.2014 | ||
| PL | 06.08.2014 | ||
| RO | 06.08.2014 | ||
| BG | 06.11.2014 | ||
| NO | 06.11.2014 | ||
| GR | 07.11.2014 | ||
| IS | 06.12.2014 | ||
| PT | 09.12.2014 | ||
| Former [2015/12] | AT | 06.08.2014 | |
| CY | 06.08.2014 | ||
| FI | 06.08.2014 | ||
| HR | 06.08.2014 | ||
| LT | 06.08.2014 | ||
| LV | 06.08.2014 | ||
| PL | 06.08.2014 | ||
| BG | 06.11.2014 | ||
| NO | 06.11.2014 | ||
| GR | 07.11.2014 | ||
| IS | 06.12.2014 | ||
| PT | 09.12.2014 | ||
| Former [2015/11] | CY | 06.08.2014 | |
| FI | 06.08.2014 | ||
| LT | 06.08.2014 | ||
| PL | 06.08.2014 | ||
| BG | 06.11.2014 | ||
| NO | 06.11.2014 | ||
| GR | 07.11.2014 | ||
| PT | 09.12.2014 | ||
| Former [2015/10] | FI | 06.08.2014 | |
| LT | 06.08.2014 | ||
| BG | 06.11.2014 | ||
| NO | 06.11.2014 | ||
| Former [2015/09] | FI | 06.08.2014 | |
| LT | 06.08.2014 | ||
| Former [2015/08] | LT | 06.08.2014 | Documents cited: | Search | [I] WO2006137708 (SAMSUNG ELECTRONICS CO LTD et al.) | [I] US2006195752 (WALKER GORDON K et al.) | [ID] NTT DOCOMO ET AL: "Comparison between RB-level and Sub-carrier-level Distributed Transmission for Shared Data Channel in E-UTRA Downlink", 3GPP DRAFT; R1-072431 DL COMPARISON ON DISTRIBUTED TRANSMISSION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Kobe, Japan; 20070502, 2 May 2007 (2007-05-02), XP050106154 | [I] SAMSUNG: "Text proposal on Downlink data multiplexing", 3GPP DRAFT; R1-061335, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Shanghai, China; 20060502, 2 May 2006 (2006-05-02), XP050102212 | [I] NORTEL: "The Multiplexing scheme for downlink resource block: distributed transmission and localized transmission", 3GPP DRAFT; R1-072377(NORTELDL_VRB), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Kobe, Japan; 20070507, 2 May 2007 (2007-05-02), XP050417699 | [I] ZTE: "Physical downlink shared channel (PDSCH) construction in LTE EUTRAN", 3GPP DRAFT; R1-070675 PHYSICAL DOWNLINK SHARED CHANNEL (PDSCH) CONSTRUCTION IN LTE EUTRAN, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. St. Louis, USA; 20070206, 6 February 2007 (2007-02-06), XP050104710 | [ID] PHILIPS: "Further discussion of Resource Block Mapping for E-UTRA Downlink", 3GPP DRAFT; R1-072393, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Kobe, Japan; 20070502, 2 May 2007 (2007-05-02), XP050106122 [ID] 1-8 * figures 2-5 * * sections 1-3, 5 * | [I] MOTOROLA: "Way forward for mapping of DL distributed transmissions to physical resource blocks", 3GPP DRAFT; R1-072163 DISTRIBUTED_WAY_FORWARD, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Kobe, Japan; 20070502, 2 May 2007 (2007-05-02), XP050105908 [I] 1-8 * figure 1 * * sections 1-3 * | Examination | WO2007052766 | NTT DOCOMO ET AL: "Distributed FDMA Transmission for Shared Data Channel in E-UTRA Downlink", 3GPP DRAFT; R1-060305 DL SHARED DATA CHANNEL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Denver, USA; 20060209, 9 February 2006 (2006-02-09), XP050101252 | MOTOROLA: "EUTRA Downlink Distributed Multiplexing and Mapping Rules", 3GPP DRAFT; R1-071352 DRAMAPPING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. St. Julian; 20070403, 3 April 2007 (2007-04-03), XP050105302 | QUALCOMM EUROPE: "E-UTRA Downlink Multiplexing and Control", 3GPP DRAFT; R1-060169, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Helsinki, Finland; 20060123, 19 January 2006 (2006-01-19), XP050417527 | LG ELECTRONICS: "Downlink resource allocation for localized and distributed transmission", 3GPP DRAFT; R1-071549 - DL RESOURCE ALLOCATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. St. Julian; 20070403, 3 April 2007 (2007-04-03), XP050105480 | 3RD GENERATION PARTNERSHIP PROJECT: "Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2 (Release 8)", 3GPP TS 36.300, V1.0.0, 1 March 2007 (2007-03-01) [I] 1-8 * figures 1,3 * * section 7.1.1.2.1 * | by applicant | JP2007161958 | JP2007211545 | JP2008056561 | "Comparison between RB-level and Sub-carrier-level Distributed Transmission for Shared Data Channel in E-UTRA Downlink", 3GPP TSG RAN WG1 LTE MEETING, KOBE, JAPAN, 7 May 2007 (2007-05-07) |