EP2544395 - Control Channel Signalling for Triggering the Independent Transmission of a Channel Quality Indicator [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.08.2014 Database last updated on 17.05.2024 | Most recent event Tooltip | 29.06.2018 | Lapse of the patent in a contracting state New state(s): MK | published on 01.08.2018 [2018/31] | Applicant(s) | For all designated states Panasonic Corporation 1006, Oaza Kadoma Kadoma-shi Osaka 571-8501 / JP | [N/P] |
Former [2013/02] | For all designated states Panasonic Corporation 1006, Oaza Kadoma Kadoma-shi Osaka 571-8501 / JP | Inventor(s) | 01 /
Golitschek Edler Von Elbwart, Alexander Panasonic R&D Center Germany GmbH Monzastrasse 4c 63225 Langen / DE | 02 /
Wengerter, Christian Panasonic R&D Center Germany GmbH Monzastrasse 4c 63225 Langen / DE | 03 /
Löhr, Joachim Panasonic R&D Center Germany GmbH Monzastrasse 4c 63225 Langen / DE | [2013/41] |
Former [2013/02] | 01 /
Golitscheck Edler Von Elbwart, Alexander Panasonic R&D Center Germany GmbH Monzastrasse 4c 63225 Langen / DE | ||
02 /
Wengerter, Christian Panasonic R&D Center Germany GmbH Monzastrasse 4c 63225 Langen / DE | |||
03 /
Löhr, Joachim Panasonic R&D Center Germany GmbH Monzastrasse 4c 63225 Langen / DE | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [N/P] |
Former [2013/02] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Leopoldstrasse 4 80802 München / DE | Application number, filing date | 12181036.0 | 02.04.2009 | [2013/02] | Priority number, date | EP20080008539 | 06.05.2008 Original published format: EP 08008539 | [2013/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2544395 | Date: | 09.01.2013 | Language: | EN | [2013/02] | Type: | B1 Patent specification | No.: | EP2544395 | Date: | 16.10.2013 | Language: | EN | [2013/42] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.12.2012 | Classification | IPC: | H04L1/00, H04B7/06, H04L1/18, H04W28/00, C12M1/30 | [2013/02] | CPC: |
H04L1/0026 (EP,BR,KR,US);
H04W24/10 (KR);
H04L5/0057 (EP,BR,US);
H04B17/309 (KR);
H04B7/0617 (US);
H04L1/0007 (EP,BR,US);
H04L1/0025 (EP,BR,KR,US);
H04L1/0027 (EP,BR,KR,US);
H04L1/0029 (EP,BR,KR,US);
H04L1/1812 (US);
H04L1/1819 (EP,BR,US);
H04L43/16 (US);
H04L5/0007 (US);
H04L5/0021 (US);
H04L5/0053 (KR);
H04W28/14 (US);
H04W72/20 (EP,BR,KR,US);
H04W72/21 (KR,US);
H04W72/23 (US);
H04W72/542 (EP,BR,KR,US);
H04W74/02 (KR,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2013/02] | Title | German: | Steuerkanalsignalisierung zur Auslösung der unabhängigen Übertragung eines Kanalqualitätsindikators | [2013/02] | English: | Control Channel Signalling for Triggering the Independent Transmission of a Channel Quality Indicator | [2013/02] | French: | Contrôle de signalisation de canal pour déclencher la transmission indépendante d'un indicateur de qualité de canal | [2013/02] | Examination procedure | 26.02.2013 | Examination requested [2013/15] | 03.05.2013 | Communication of intention to grant the patent | 03.09.2013 | Fee for grant paid | 03.09.2013 | Fee for publishing/printing paid | Parent application(s) Tooltip | EP09741793.5 / EP2294737 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20090741793) is 10.10.2011 | Opposition(s) | 17.07.2014 | No opposition filed within time limit [2014/39] | Fees paid | Renewal fee | 20.08.2012 | Renewal fee patent year 03 | 20.08.2012 | Renewal fee patent year 04 | 26.04.2013 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 16.10.2013 | BE | 16.10.2013 | BG | 16.10.2013 | CY | 16.10.2013 | DK | 16.10.2013 | EE | 16.10.2013 | FI | 16.10.2013 | HR | 16.10.2013 | LT | 16.10.2013 | LV | 16.10.2013 | MC | 16.10.2013 | MK | 16.10.2013 | MT | 16.10.2013 | NL | 16.10.2013 | PL | 16.10.2013 | RO | 16.10.2013 | SE | 16.10.2013 | SI | 16.10.2013 | SK | 16.10.2013 | NO | 16.01.2014 | GR | 17.01.2014 | IS | 16.02.2014 | PT | 17.02.2014 | IE | 02.04.2014 | LU | 02.04.2014 | CH | 30.04.2014 | LI | 30.04.2014 | [2018/31] |
Former [2016/28] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
BG | 16.10.2013 | ||
CY | 16.10.2013 | ||
DK | 16.10.2013 | ||
EE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
MC | 16.10.2013 | ||
MT | 16.10.2013 | ||
NL | 16.10.2013 | ||
PL | 16.10.2013 | ||
RO | 16.10.2013 | ||
SE | 16.10.2013 | ||
SI | 16.10.2013 | ||
SK | 16.10.2013 | ||
NO | 16.01.2014 | ||
GR | 17.01.2014 | ||
IS | 16.02.2014 | ||
PT | 17.02.2014 | ||
IE | 02.04.2014 | ||
LU | 02.04.2014 | ||
CH | 30.04.2014 | ||
LI | 30.04.2014 | ||
Former [2016/16] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
CY | 16.10.2013 | ||
DK | 16.10.2013 | ||
EE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
MC | 16.10.2013 | ||
MT | 16.10.2013 | ||
NL | 16.10.2013 | ||
PL | 16.10.2013 | ||
RO | 16.10.2013 | ||
SE | 16.10.2013 | ||
SI | 16.10.2013 | ||
SK | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
PT | 17.02.2014 | ||
IE | 02.04.2014 | ||
LU | 02.04.2014 | ||
CH | 30.04.2014 | ||
LI | 30.04.2014 | ||
Former [2015/21] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
CY | 16.10.2013 | ||
DK | 16.10.2013 | ||
EE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
MC | 16.10.2013 | ||
NL | 16.10.2013 | ||
PL | 16.10.2013 | ||
RO | 16.10.2013 | ||
SE | 16.10.2013 | ||
SI | 16.10.2013 | ||
SK | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
PT | 17.02.2014 | ||
IE | 02.04.2014 | ||
LU | 02.04.2014 | ||
CH | 30.04.2014 | ||
LI | 30.04.2014 | ||
Former [2015/14] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
CY | 16.10.2013 | ||
DK | 16.10.2013 | ||
EE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
MC | 16.10.2013 | ||
NL | 16.10.2013 | ||
PL | 16.10.2013 | ||
RO | 16.10.2013 | ||
SE | 16.10.2013 | ||
SI | 16.10.2013 | ||
SK | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
PT | 17.02.2014 | ||
LU | 02.04.2014 | ||
CH | 30.04.2014 | ||
LI | 30.04.2014 | ||
Former [2015/08] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
CY | 16.10.2013 | ||
DK | 16.10.2013 | ||
EE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
MC | 16.10.2013 | ||
NL | 16.10.2013 | ||
PL | 16.10.2013 | ||
RO | 16.10.2013 | ||
SE | 16.10.2013 | ||
SK | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
PT | 17.02.2014 | ||
LU | 02.04.2014 | ||
CH | 30.04.2014 | ||
LI | 30.04.2014 | ||
Former [2015/01] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
CY | 16.10.2013 | ||
DK | 16.10.2013 | ||
EE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
MC | 16.10.2013 | ||
NL | 16.10.2013 | ||
PL | 16.10.2013 | ||
RO | 16.10.2013 | ||
SE | 16.10.2013 | ||
SK | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
PT | 17.02.2014 | ||
LU | 02.04.2014 | ||
Former [2014/52] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
CY | 16.10.2013 | ||
DK | 16.10.2013 | ||
EE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
MC | 16.10.2013 | ||
NL | 16.10.2013 | ||
PL | 16.10.2013 | ||
RO | 16.10.2013 | ||
SE | 16.10.2013 | ||
SK | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
PT | 17.02.2014 | ||
Former [2014/41] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
CY | 16.10.2013 | ||
DK | 16.10.2013 | ||
EE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
NL | 16.10.2013 | ||
PL | 16.10.2013 | ||
RO | 16.10.2013 | ||
SE | 16.10.2013 | ||
SK | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
PT | 17.02.2014 | ||
Former [2014/37] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
CY | 16.10.2013 | ||
EE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
NL | 16.10.2013 | ||
PL | 16.10.2013 | ||
RO | 16.10.2013 | ||
SE | 16.10.2013 | ||
SK | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
PT | 17.02.2014 | ||
Former [2014/36] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
CY | 16.10.2013 | ||
EE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
NL | 16.10.2013 | ||
SE | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
PT | 17.02.2014 | ||
Former [2014/28] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
CY | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
NL | 16.10.2013 | ||
SE | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
PT | 17.02.2014 | ||
Former [2014/26] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
CY | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
NL | 16.10.2013 | ||
SE | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
Former [2014/25] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
LV | 16.10.2013 | ||
NL | 16.10.2013 | ||
SE | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
Former [2014/24] | AT | 16.10.2013 | |
BE | 16.10.2013 | ||
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
NL | 16.10.2013 | ||
SE | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
Former [2014/23] | BE | 16.10.2013 | |
FI | 16.10.2013 | ||
HR | 16.10.2013 | ||
LT | 16.10.2013 | ||
NL | 16.10.2013 | ||
SE | 16.10.2013 | ||
NO | 16.01.2014 | ||
IS | 16.02.2014 | ||
Former [2014/22] | FI | 16.10.2013 | |
LT | 16.10.2013 | ||
NL | 16.10.2013 | ||
SE | 16.10.2013 | ||
NO | 16.01.2014 | ||
Former [2014/20] | LT | 16.10.2013 | |
NO | 16.01.2014 | Documents cited: | Search | [A]WO2004029806 (INTERDIGITAL TECH CORP [US]) [A] 1-15 * paragraphs [0024] , [0033] , [0036]; figures 1,2 *; | [A]WO2005060132 (ELECTRONICS AND TELECOMM [KR], et al) [A] 1-15 * abstract * * figures 4,8-13 * * page 4, line 15 - page 5, line 10 * * page 13, line 9 - line 17 * * page 23, line 14 - line 17 * * page 24, line 6 - line 22 * * page 25, line 3 - line 21 * * page 26, line 19 - line 23 *; | [A]US2007014273 (KUPERSCHMIDT YEFIM [IL], et al) [A] 1-15 * paragraphs [0046] , [0049] , [0050] *; | [A]US2007149132 (LI JUNYL [US], et al) [A] 1-15 * abstract * * figures 1,2,9-11,13,18 * * paragraphs [0007] , [0039] * * paragraph [0081] - paragraph [0085] * * paragraph [0087] - paragraph [0089] * * paragraph [0093] - paragraph [0095] * * paragraph [0109] *; | [A]US2008095185 (DIGIROLAMO ROCCO [CA], et al) [A] 1-15 * paragraph [0040] - paragraph [0049] *; | [A] - LEE JHONG S ET AL, "CDMA Systems Engineering Handbook", CDMA SYSTEMS ENGINEERING HANDBOOK, XX, XX, (19980101), ISBN 978-0-89006-990-5, pages 360 - 366, XP002503419 [A] 1-15 * page 360 - page 366 * | [A] - PANASONIC, "CQI Feedback Control and Content in E-UTRA", 3GPP DRAFT; R1-072077, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070502), vol. RAN WG1, no. Kobe, Japan; 20070502, XP050105831 [A] 1-15 * the whole document * | [A] - NOKIA ET AL, "CQI Trigger Mechanism", 3GPP DRAFT; R1-073680, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070815), vol. RAN WG1, no. Athens, Greece; 20070815, XP050107276 [A] 1-15 * sections 3, 6 * | [A] - PHILIPS, "Control of CQI feedback signalling in E-UTRA", 3GPP DRAFT; R1-071093, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070206), vol. RAN WG1, no. St. Louis, USA; 20070206, XP050105083 [A] 1-15 * the whole document * | [A] - PANASONIC, "CQI Feedback Control and Content in E-UTRA", 3GPP DRAFT; R1-071524, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070403), vol. RAN WG1, no. St. Julian; 20070403, XP050105455 [A] 1-15 * the whole document * | [XP] - PANASONIC, "PDCCH contents and formats", 3GPP DRAFT; R1-082079, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080514), vol. RAN WG1, no. Kansas City, USA; 20080514, XP050110409 [XP] 1-15 * sections 4.2.3, 4.2.4 * | [XP] - PANASONIC ET AL, "Signaling of CQI only on PUSCH", 3GPP DRAFT; R1-082190_CQI_ONLY_SIGNALING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080514), vol. RAN WG1, no. Kansas City, USA; 20080514, XP050110494 [XP] 1-15 * the whole document * | by applicant | - "Physical Layer Aspects for Evolved UTRA", 3GPP TR 25.814, (200610), URL: http://www.3gpp.org | - "Comparison between RB-level and Sub-carrier-level Distributed Transmission for Shared Data Channel in E-UTRA Downlink", 3GPP RAN WG#1 TDOC R1-062089, (200608), URL: http://www.3gpp.org | - "High Speed Downlink Packet Access (HSDPA); Overall description; Stage 2", 3GPP TS 25.308, (200709), URL: http://www.3gpp.org | - "Multiplexing and Channel Coding (FDD", 3GPP TS 25.212, (200709), URL: http://www.3gpp.org | - "UE procedure for reporting channel quality indication (CQI), precoding matrix indicator (PMI) and rank indication (RI", 3GPP TS 36.213, (200803), URL: http://www.3gpp.org | - "Downlink Link Adaptation and Related Control Signalling", 3GPP RAN1 MEETING 49BIS |