EP2770127 - Fitting device for a bathroom item [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.11.2019 Database last updated on 15.05.2024 | |
Former | The patent has been granted Status updated on 30.11.2018 | ||
Former | Grant of patent is intended Status updated on 26.07.2018 | ||
Former | Examination is in progress Status updated on 08.12.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Geberit International AG Schachenstrasse 77 8645 Jona / CH | [2014/35] | Inventor(s) | 01 /
Kosarnig, Rolf Steinacherstrasse 15 8630 Rüti / CH | [2016/46] |
Former [2014/35] | 01 /
Kosaring, Rolf Steinacherstrasse 15 8630 Rüti / CH | Representative(s) | Frischknecht, Harry Ralph Isler & Pedrazzini AG Giesshübelstrasse 45 Postfach 1772 8027 Zürich / CH | [2019/01] |
Former [2014/35] | Frischknecht, Harry Ralph Isler & Pedrazzini AG Postfach 1772 8027 Zürich / CH | Application number, filing date | 13156357.9 | 22.02.2013 | [2014/35] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2770127 | Date: | 27.08.2014 | Language: | DE | [2014/35] | Type: | B1 Patent specification | No.: | EP2770127 | Date: | 02.01.2019 | Language: | DE | [2019/01] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.07.2013 | Classification | IPC: | E03D11/14, F21V33/00 | [2014/35] | CPC: |
E03D11/143 (EP,US);
G02B6/0001 (US);
E03D11/146 (EP,US);
G02B6/0096 (US);
G02B6/26 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/01] |
Former [2014/35] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Montageeinrichtung für einen Sanitärkörper | [2014/35] | English: | Fitting device for a bathroom item | [2014/35] | French: | Dispositif de montage pour un corps sanitaire | [2014/35] | Examination procedure | 22.01.2015 | Examination requested [2015/10] | 20.02.2015 | Amendment by applicant (claims and/or description) | 07.12.2017 | Despatch of a communication from the examining division (Time limit: M06) | 13.06.2018 | Reply to a communication from the examining division | 27.07.2018 | Communication of intention to grant the patent | 26.11.2018 | Fee for grant paid | 26.11.2018 | Fee for publishing/printing paid | 26.11.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.12.2017 | Opposition(s) | 03.10.2019 | No opposition filed within time limit [2019/50] | Fees paid | Renewal fee | 12.02.2015 | Renewal fee patent year 03 | 11.02.2016 | Renewal fee patent year 04 | 13.02.2017 | Renewal fee patent year 05 | 12.02.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.02.2013 | AL | 02.01.2019 | CY | 02.01.2019 | CZ | 02.01.2019 | DK | 02.01.2019 | EE | 02.01.2019 | ES | 02.01.2019 | HR | 02.01.2019 | LT | 02.01.2019 | LV | 02.01.2019 | MC | 02.01.2019 | MK | 02.01.2019 | MT | 02.01.2019 | NL | 02.01.2019 | PL | 02.01.2019 | RO | 02.01.2019 | RS | 02.01.2019 | SE | 02.01.2019 | SI | 02.01.2019 | SK | 02.01.2019 | SM | 02.01.2019 | TR | 02.01.2019 | AT | 22.02.2019 | IE | 22.02.2019 | LU | 22.02.2019 | BE | 28.02.2019 | FR | 02.03.2019 | BG | 02.04.2019 | GR | 03.04.2019 | IS | 02.05.2019 | PT | 02.05.2019 | [2022/31] |
Former [2021/32] | HU | 22.02.2013 | |
AL | 02.01.2019 | ||
CY | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
MT | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
AT | 22.02.2019 | ||
IE | 22.02.2019 | ||
LU | 22.02.2019 | ||
BE | 28.02.2019 | ||
FR | 02.03.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2021/26] | AL | 02.01.2019 | |
CY | 02.01.2019 | ||
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
MT | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
AT | 22.02.2019 | ||
IE | 22.02.2019 | ||
LU | 22.02.2019 | ||
BE | 28.02.2019 | ||
FR | 02.03.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2020/29] | AL | 02.01.2019 | |
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
MT | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
AT | 22.02.2019 | ||
IE | 22.02.2019 | ||
LU | 22.02.2019 | ||
BE | 28.02.2019 | ||
FR | 02.03.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2020/23] | AL | 02.01.2019 | |
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
AT | 22.02.2019 | ||
IE | 22.02.2019 | ||
LU | 22.02.2019 | ||
BE | 28.02.2019 | ||
FR | 02.03.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2020/17] | AL | 02.01.2019 | |
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
TR | 02.01.2019 | ||
IE | 22.02.2019 | ||
LU | 22.02.2019 | ||
BE | 28.02.2019 | ||
FR | 02.03.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2020/12] | AL | 02.01.2019 | |
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SI | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
IE | 22.02.2019 | ||
LU | 22.02.2019 | ||
BE | 28.02.2019 | ||
FR | 02.03.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2020/09] | AL | 02.01.2019 | |
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
IE | 22.02.2019 | ||
LU | 22.02.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/52] | AL | 02.01.2019 | |
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SK | 02.01.2019 | ||
SM | 02.01.2019 | ||
LU | 22.02.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/49] | AL | 02.01.2019 | |
CZ | 02.01.2019 | ||
DK | 02.01.2019 | ||
EE | 02.01.2019 | ||
ES | 02.01.2019 | ||
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RO | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
SK | 02.01.2019 | ||
LU | 22.02.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/48] | DK | 02.01.2019 | |
ES | 02.01.2019 | ||
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
LU | 22.02.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/47] | ES | 02.01.2019 | |
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
LU | 22.02.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/46] | ES | 02.01.2019 | |
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
MC | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/39] | ES | 02.01.2019 | |
HR | 02.01.2019 | ||
LT | 02.01.2019 | ||
LV | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
RS | 02.01.2019 | ||
SE | 02.01.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
IS | 02.05.2019 | ||
PT | 02.05.2019 | ||
Former [2019/38] | ES | 02.01.2019 | |
LT | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
SE | 02.01.2019 | ||
BG | 02.04.2019 | ||
GR | 03.04.2019 | ||
PT | 02.05.2019 | ||
Former [2019/37] | ES | 02.01.2019 | |
LT | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
SE | 02.01.2019 | ||
GR | 03.04.2019 | ||
PT | 02.05.2019 | ||
Former [2019/35] | ES | 02.01.2019 | |
LT | 02.01.2019 | ||
NL | 02.01.2019 | ||
PL | 02.01.2019 | ||
SE | 02.01.2019 | ||
PT | 02.05.2019 | ||
Former [2019/34] | LT | 02.01.2019 | |
NL | 02.01.2019 | ||
SE | 02.01.2019 | ||
PT | 02.05.2019 | ||
Former [2019/33] | LT | 02.01.2019 | |
NL | 02.01.2019 | ||
PT | 02.05.2019 | ||
Former [2019/30] | NL | 02.01.2019 | Documents cited: | Search | [A]DE7237302U (AUTOKINO BAU GMBH) [A] 1,18 * figure 2 *; | [XAI]DE2500889 (MECHEL KURT) [X] 1,3,18 * figures 1,3,4,6; claim 1 * [A] 13 [I] 10,11; | [A]JPH0541103 (TOTO LTD) [A] 1 * abstract *; | [Y]JP2001107426 (INAX CORP) [Y] 16 * abstract *; | [XYI]DE102007057214 (BIRCO BAUSTOFFWERK GMBH [DE]) [X] 1,3,10,13,17,18 * paragraphs [0023] , [0025] , [0030] - [0042]; figures 1-4; claim - * [Y] 5 [I] 2,4-9,11,12,14-16; | [XA]EP2281957 (TECE GMBH [DE]) [X] 1,18 * paragraph [0029]; figures 1,2,3,4 * [A] 16; | [XI]FR2951204 (SANITEC [FR]) [X] 1,3,18 * page 15, lines 13-15,18,19; figures 1,13 * [I] 10,11; | [AD]EP2439348 (GEBERIT INT AG [CH]) [AD] 1* figures 2,3,5 *; | [XY]US8277070 (SCHWARZ JOSEPH R [US]) [X] 1-4,6-15,18 * figure 2 * [Y] 5,16 | by applicant | EP2439348 |