EP2969394 - BONDED ABRASIVE ARTICLE [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 03.07.2020 Database last updated on 11.05.2024 | |
Former | Grant of patent is intended Status updated on 01.03.2020 | ||
Former | Examination is in progress Status updated on 01.06.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states 3M Innovative Properties Company 3M Center P.O. Box 33427 St. Paul, MN 55133-3427 / US | [N/P] |
Former [2020/32] | For all designated states 3M Innovative Properties Company 3M Center P.O.Box 33427 St. Paul, MN 55133-3427 / US | ||
Former [2016/03] | For all designated states 3M Innovative Properties Company 3M Center P.O. Box 33427 St. Paul, MN 55133-3427 / US | Inventor(s) | 01 /
FLASCHBERGER, Walter Almblickweg 47 A-9500 Villach / AT | 02 /
KIRSCHNER, Andrea Veronika Röntgenstr. 5/11 A-9500 Villach / AT | [2016/03] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2016/03] | Application number, filing date | 13718229.1 | 12.03.2013 | [2016/03] | WO2013IB51942 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014140689 | Date: | 18.09.2014 | Language: | EN | [2014/38] | Type: | A1 Application with search report | No.: | EP2969394 | Date: | 20.01.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 18.09.2014 takes the place of the publication of the European patent application. | [2016/03] | Type: | B1 Patent specification | No.: | EP2969394 | Date: | 05.08.2020 | Language: | EN | [2020/32] | Search report(s) | International search report - published on: | EP | 18.09.2014 | Classification | IPC: | B24D3/14, B24D5/02, B24B53/07, B24D5/14, C09K3/14 | [2016/03] | CPC: |
B24D3/14 (EP,KR,US);
B24B53/07 (EP,KR,US);
B24D5/02 (EP,KR,US);
B24D5/14 (EP,KR,US);
C09K3/1409 (EP,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/03] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | GEBUNDENES SCHLEIFMITTEL | [2020/12] | English: | BONDED ABRASIVE ARTICLE | [2016/03] | French: | ARTICLE ABRASIF AGGLOMERE | [2020/12] |
Former [2016/03] | GEBONDETER SCHLEIFARTIKEL | ||
Former [2016/03] | ARTICLE ABRASIF LIÉ | Entry into regional phase | 12.10.2015 | National basic fee paid | 12.10.2015 | Designation fee(s) paid | 12.10.2015 | Examination fee paid | Examination procedure | 12.10.2015 | Examination requested [2016/03] | 03.05.2016 | Amendment by applicant (claims and/or description) | 31.05.2018 | Despatch of a communication from the examining division (Time limit: M06) | 10.12.2018 | Reply to a communication from the examining division | 01.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 10.07.2019 | Reply to a communication from the examining division | 20.09.2019 | Despatch of a communication from the examining division (Time limit: M01) | 17.10.2019 | Reply to a communication from the examining division | 02.03.2020 | Communication of intention to grant the patent | 30.06.2020 | Fee for grant paid | 30.06.2020 | Fee for publishing/printing paid | 30.06.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 31.05.2018 | Opposition(s) | Opponent(s) | 01
05.05.2021
Saint-Gobain Abrasives, Inc. One New Bond Street Worcester, Massachusetts 01615 / US Opponent's representative Zimmermann & Partner Patentanwälte mbB Postfach 330 920 80069 München / DE | [2021/23] | deleted | Deletion: Legal effect of rejection of opposition [ N /P ] | 19.05.2021 | Invitation to proprietor to file observations on the notice of opposition | 29.09.2021 | Reply of patent proprietor to notice(s) of opposition | 28.02.2023 | Date of oral proceedings | 20.03.2023 | Despatch of minutes of oral proceedings | 20.03.2023 | Date of despatch of rejection of opposition | Appeal following opposition | 30.05.2023 | Appeal received No. T0997/23 | 30.05.2023 | Payment of appeal fee | 28.07.2023 | Statement of grounds filed | 14.10.2024 | Date of oral proceedings | Fees paid | Renewal fee | 12.10.2015 | Renewal fee patent year 03 | 10.03.2016 | Renewal fee patent year 04 | 10.03.2017 | Renewal fee patent year 05 | 13.03.2018 | Renewal fee patent year 06 | 13.03.2019 | Renewal fee patent year 07 | 12.03.2020 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.03.2013 | AL | 05.08.2020 | AT | 05.08.2020 | CY | 05.08.2020 | CZ | 05.08.2020 | DK | 05.08.2020 | EE | 05.08.2020 | ES | 05.08.2020 | FI | 05.08.2020 | HR | 05.08.2020 | IT | 05.08.2020 | LT | 05.08.2020 | LV | 05.08.2020 | MC | 05.08.2020 | MK | 05.08.2020 | NL | 05.08.2020 | PL | 05.08.2020 | RO | 05.08.2020 | RS | 05.08.2020 | SE | 05.08.2020 | SI | 05.08.2020 | SK | 05.08.2020 | SM | 05.08.2020 | BG | 05.11.2020 | NO | 05.11.2020 | GR | 06.11.2020 | IS | 05.12.2020 | PT | 07.12.2020 | GB | 12.03.2021 | IE | 12.03.2021 | LU | 12.03.2021 | BE | 31.03.2021 | CH | 31.03.2021 | FR | 31.03.2021 | LI | 31.03.2021 | [2024/22] |
Former [2023/30] | HU | 12.03.2013 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.03.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2023/27] | HU | 12.03.2013 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.03.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/34] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.03.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/11] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.03.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/08] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
GB | 12.03.2021 | ||
IE | 12.03.2021 | ||
LU | 12.03.2021 | ||
FR | 31.03.2021 | ||
Former [2022/07] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 12.03.2021 | ||
Former [2021/45] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/36] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/34] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/28] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/25] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/23] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/22] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/21] | AT | 05.08.2020 | |
DK | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/12] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/10] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/09] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/08] | ES | 05.08.2020 | |
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/07] | FI | 05.08.2020 | |
LT | 05.08.2020 | ||
NO | 05.11.2020 | Cited in | International search | [A]US4182082 (MEYER HANS-ROBERT [DE]) [A] 10-13,17,69-84* column 5, line 2 - line 27; figures 1,2 *; | [Y]US2004023599 (TUNSTALL JOHN [US]) [Y] 10-13,17,74-80 * paragraphs [0024] , [0032] - [0034]; figures 1A-3B *; | [XDYI]US2010146867 (BODEN JOHN T [US], et al) [XD] 1-9,14-16,18-47,65,68-73 * paragraphs [0057] , [0058] , [0064] - [0066] - [0086] , [0089] , [0099] - [0101] - [0105]; figures 2-10C * [Y] 10-13,17,74-80 [I] 48-64,66,67,81-84 | by applicant | US1910444 | US3041156 | US4314827 | US4623364 | US4744802 | US4770671 | US4881951 | US4997461 | US5009675 | US5011508 | US5042991 | US5085671 | US5152917 | US5164348 | US5201916 | US5213591 | US5352254 | US5366523 | US5435816 | US5551963 | US5645619 | US5672097 | US5946991 | US5975987 | US6129540 | US6277161 | US2009169816 | US2009165394 | US2010151196 | US2010151201 | US2010151195 | US2010146867 | US2010319269 | WO2011068714 | WO2011109188 | Opposition | US1910444 | US4182082 | US2004023599 | EP1598147 | US7722691 | US2010146867 | US2010151195 | US2010319269 | WO2011068714 | WO2011109188 | WO2012092605 | WO2015160855 | - Anonymous, "Order of magnitude", Wikipedia, (20210319), pages 1 - 7, URL: https://en.wikipedia.org/wiki/Order_of_magnitude, XP055954043 | - Anonymous, "Project ALTOS", Brochure ALTOS, (19990000), pages 1 - 2, XP055954038 | - Anonymous, "Diamond dressers - design general tolerances", Brochure ALTOS-IPX, (20050000), pages 1 - 2, XP055954049 | - Anonymous, "For high performance grinding in the aerospace & land turbine markets", Brochure HAWK, (20110000), pages 1 - 2, XP055954059 | - Anonymous, "OptiMOS ™ High speed grinding for aerospace alloys", Brochure OptiMOS, (20080000), pages 1 - 4, XP055954066 | - Anonymous, "Technical machining solutions for transmission systems", Brochure WINTER, (20060000), pages 1 - 28, XP055954076 | - Anonymous, "Brochure Engineering Solutions for gear manufacture", Saint-Gobain Abrasives, (20050000), pages 1 - 6, XP055954088 | - Oliveira J F G; Bottene A C; Franca T V, "A novel dressing technique for texturing ground surfaces", CIRP Annals - Manufacturing Technology, (20100000), vol. 59, no. 2010, pages 361 - 364, XP027199711 |