| EP2826190 - SCHEDULING TIMING DESIGN FOR A TDD SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.03.2022 Database last updated on 31.03.2026 | |
| Former | The patent has been granted Status updated on 16.04.2021 | ||
| Former | Grant of patent is intended Status updated on 10.12.2020 | ||
| Former | Examination is in progress Status updated on 23.02.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Apple Inc. One Apple Park Way Cupertino, CA 95014 / US | [2020/51] |
| Former [2015/04] | For all designated states Intel Corporation 2200 Mission College Boulevard Santa Clara, CA 95054 / US | Inventor(s) | 01 /
HE, Hong 8F, Raycom Infotech Park A No.2, Kexueyuan South Road Haidian District Beijing 100190 / CN | 02 /
FWU, Jong-Kae 1519 Dminion Ave. Sunnyvale, California 94087 / US | 03 /
HUANG, Rui 8F, Raycom A No.2 Kexueyuan South Road 11 Beijing 100085 / CN | [2015/04] | Representative(s) | Rooney, John-Paul Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [N/P] |
| Former [2021/20] | Rooney, John-Paul Withers & Rogers LLP 4 More London Riverside London SE1 2AU / GB | ||
| Former [2015/04] | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Patentanwälte Rechtsanwälte Pettenkoferstrasse 20-22 80336 München / DE | Application number, filing date | 13761752.8 | 18.02.2013 | [2021/20] | WO2013US26599 | Priority number, date | US201261612188P | 16.03.2012 Original published format: US 201261612188 P | US201213716978 | 17.12.2012 Original published format: US201213716978 | [2015/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013138019 | Date: | 19.09.2013 | Language: | EN | [2013/38] | Type: | A1 Application with search report | No.: | EP2826190 | Date: | 21.01.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.09.2013 takes the place of the publication of the European patent application. | [2015/04] | Type: | B1 Patent specification | No.: | EP2826190 | Date: | 19.05.2021 | Language: | EN | [2021/20] | Search report(s) | International search report - published on: | KR | 19.09.2013 | (Supplementary) European search report - dispatched on: | EP | 23.10.2015 | Classification | IPC: | H04W4/06, H04L1/18, H04J3/00, H04L5/00, H04L5/14, H04W28/02, H04W52/02, H04W72/12, H04W52/14, H04L1/16, H04W72/04, H04W74/08 | [2020/52] | CPC: |
H04L1/0077 (EP,US);
H04L1/1825 (EP,BR,CN,RU,US);
H04L1/1812 (FI,SE,US);
G06F11/08 (FI);
H04W28/0236 (RU,US);
H04W28/0268 (EP,KR,US);
H04B7/0404 (CN);
H04W52/02 (EP,CN,ES,RU,US);
H04B7/0413 (CN);
H04B7/063 (CN);
H04L1/0006 (CN);
H04L1/0033 (RU,US);
H04L1/08 (EP);
H04L1/1607 (EP);
H04L1/1635 (EP,CN,RU,US);
H04L1/18 (ES);
H04L1/1819 (RU,US);
H04L1/1854 (RU,US);
H04L1/1861 (EP,CN);
H04L1/1864 (EP,BR,CN,US);
H04L1/1877 (US);
H04L1/1887 (US);
H04L1/189 (EP,CN,US);
H04L1/1896 (EP,BR,CN,US);
H04L12/189 (US);
H04L12/2854 (US);
H04L47/283 (US);
H04L47/6275 (EP,US);
H04L5/001 (CN,US);
H04L5/0053 (CN,RU,US);
H04L5/0055 (CN,RU,US);
H04L5/0073 (EP,US);
H04L5/0094 (CN);
H04L5/14 (US);
H04L5/1438 (US);
H04L5/1446 (US);
H04L5/1469 (CN,US);
H04L65/752 (EP,BR,CN,ES,FI,RU,SE,US);
H04L65/756 (EP,BR,CN,ES,FI,RU,SE,US);
H04L67/02 (EP,US);
H04L67/568 (US);
H04N21/25841 (US);
H04N21/41407 (US);
H04N21/6405 (RU,US);
H04N21/6408 (RU,US);
H04W16/04 (EP,US);
H04W24/00 (US);
H04W24/02 (EP,US);
H04W28/0263 (KR);
H04W28/0278 (US);
H04W28/24 (CN);
H04W4/06 (EP,CN,US);
H04W52/0206 (EP,CN,US);
H04W52/0209 (EP,CN,US);
H04W52/0235 (EP,CN,US);
H04W52/04 (ES);
H04W52/243 (US);
H04W72/04 (FI,SE,US);
H04W72/12 (CN,KR,RU,US);
H04W72/1273 (US);
H04W72/20 (US);
H04W72/21 (EP,CN,RU,US);
H04W72/23 (CN,US);
H04W72/27 (EP,CN,US);
H04W72/51 (US);
H04W72/541 (US);
H04W72/56 (KR);
H04W72/569 (US);
H04W74/085 (EP,CN,US);
H04W76/27 (US);
H04W76/28 (US);
H04J11/0073 (US);
H04L1/0025 (CN);
H04L1/0072 (CN);
H04L1/1822 (CN);
H04L5/0023 (CN);
H04L5/0035 (CN);
H04W52/0229 (EP,CN,US);
H04W52/143 (EP,CN,US);
H04W72/0446 (US);
H04W72/1268 (EP,CN,US);
Y02D30/70 (EP,US)
(-)
|
| Former IPC [2015/48] | H04L1/18, H04J3/00, H04L5/00, H04L5/14 | ||
| Former IPC [2015/04] | H04L1/18, H04J3/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | PLANUNGS-TIMING-ENTWURF FÜR EIN TDD-SYSTEM | [2015/04] | English: | SCHEDULING TIMING DESIGN FOR A TDD SYSTEM | [2015/04] | French: | CONCEPTION D'UNE DISTRIBUTION DES TEMPS D'ORDONNANCEMENT POUR UN SYSTÈME DRT | [2015/04] | Entry into regional phase | 11.08.2014 | National basic fee paid | 11.08.2014 | Search fee paid | 11.08.2014 | Designation fee(s) paid | 11.08.2014 | Examination fee paid | Examination procedure | 11.08.2014 | Examination requested [2015/04] | 13.05.2016 | Amendment by applicant (claims and/or description) | 26.02.2018 | Despatch of a communication from the examining division (Time limit: M04) | 26.06.2018 | Reply to a communication from the examining division | 13.11.2019 | Despatch of a communication from the examining division (Time limit: M06) | 11.05.2020 | Reply to a communication from the examining division | 11.12.2020 | Communication of intention to grant the patent | 12.04.2021 | Fee for grant paid | 12.04.2021 | Fee for publishing/printing paid | 12.04.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.02.2018 | Opposition(s) | 22.02.2022 | No opposition filed within time limit [2022/17] | Fees paid | Renewal fee | 11.02.2015 | Renewal fee patent year 03 | 10.02.2016 | Renewal fee patent year 04 | 10.02.2017 | Renewal fee patent year 05 | 14.02.2018 | Renewal fee patent year 06 | 13.02.2019 | Renewal fee patent year 07 | 13.02.2020 | Renewal fee patent year 08 | 12.02.2021 | Renewal fee patent year 09 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.02.2013 | AL | 19.05.2021 | AT | 19.05.2021 | CY | 19.05.2021 | CZ | 19.05.2021 | DK | 19.05.2021 | EE | 19.05.2021 | ES | 19.05.2021 | FI | 19.05.2021 | HR | 19.05.2021 | IT | 19.05.2021 | LT | 19.05.2021 | LV | 19.05.2021 | MC | 19.05.2021 | MK | 19.05.2021 | MT | 19.05.2021 | NL | 19.05.2021 | PL | 19.05.2021 | RO | 19.05.2021 | RS | 19.05.2021 | SE | 19.05.2021 | SI | 19.05.2021 | SK | 19.05.2021 | SM | 19.05.2021 | TR | 19.05.2021 | BG | 19.08.2021 | NO | 19.08.2021 | GR | 20.08.2021 | IS | 19.09.2021 | PT | 20.09.2021 | GB | 18.02.2022 | IE | 18.02.2022 | LU | 18.02.2022 | [2026/04] |
| Former [2024/41] | HU | 18.02.2013 | |
| AL | 19.05.2021 | ||
| AT | 19.05.2021 | ||
| CY | 19.05.2021 | ||
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| IT | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| MC | 19.05.2021 | ||
| MK | 19.05.2021 | ||
| MT | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SI | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| GB | 18.02.2022 | ||
| IE | 18.02.2022 | ||
| LU | 18.02.2022 | ||
| Former [2024/22] | HU | 18.02.2013 | |
| AL | 19.05.2021 | ||
| AT | 19.05.2021 | ||
| CY | 19.05.2021 | ||
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| IT | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| MC | 19.05.2021 | ||
| MK | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SI | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| GB | 18.02.2022 | ||
| IE | 18.02.2022 | ||
| LU | 18.02.2022 | ||
| Former [2024/20] | HU | 18.02.2013 | |
| AL | 19.05.2021 | ||
| AT | 19.05.2021 | ||
| CY | 19.05.2021 | ||
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| IT | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| MC | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SI | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| GB | 18.02.2022 | ||
| IE | 18.02.2022 | ||
| LU | 18.02.2022 | ||
| Former [2024/18] | HU | 18.02.2013 | |
| AL | 19.05.2021 | ||
| AT | 19.05.2021 | ||
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| IT | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| MC | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SI | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| GB | 18.02.2022 | ||
| IE | 18.02.2022 | ||
| LU | 18.02.2022 | ||
| Former [2023/09] | AL | 19.05.2021 | |
| AT | 19.05.2021 | ||
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| IT | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| MC | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SI | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| GB | 18.02.2022 | ||
| IE | 18.02.2022 | ||
| LU | 18.02.2022 | ||
| Former [2023/08] | AL | 19.05.2021 | |
| AT | 19.05.2021 | ||
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| IT | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| MC | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SI | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| GB | 18.02.2022 | ||
| IE | 18.02.2022 | ||
| LU | 18.02.2022 | ||
| Former [2022/47] | AL | 19.05.2021 | |
| AT | 19.05.2021 | ||
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| IT | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| MC | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SI | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| LU | 18.02.2022 | ||
| Former [2022/44] | AL | 19.05.2021 | |
| AT | 19.05.2021 | ||
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| IT | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| MC | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SI | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| Former [2022/36] | AL | 19.05.2021 | |
| AT | 19.05.2021 | ||
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| IT | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SI | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| Former [2022/29] | AL | 19.05.2021 | |
| AT | 19.05.2021 | ||
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SI | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| Former [2022/26] | AL | 19.05.2021 | |
| AT | 19.05.2021 | ||
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| Former [2022/23] | AT | 19.05.2021 | |
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| Former [2022/10] | AT | 19.05.2021 | |
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| EE | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| PT | 20.09.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/09] | AT | 19.05.2021 | |
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RO | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SK | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| Former [2022/08] | AT | 19.05.2021 | |
| CZ | 19.05.2021 | ||
| DK | 19.05.2021 | ||
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| Former [2022/07] | AT | 19.05.2021 | |
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| SM | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| Former [2022/04] | AT | 19.05.2021 | |
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| NL | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| Former [2021/52] | AT | 19.05.2021 | |
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| PL | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| Former [2021/51] | AT | 19.05.2021 | |
| ES | 19.05.2021 | ||
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| RS | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| IS | 19.09.2021 | ||
| PT | 20.09.2021 | ||
| Former [2021/50] | AT | 19.05.2021 | |
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| PT | 20.09.2021 | ||
| Former [2021/49] | AT | 19.05.2021 | |
| FI | 19.05.2021 | ||
| HR | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| LV | 19.05.2021 | ||
| SE | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| NO | 19.08.2021 | ||
| GR | 20.08.2021 | ||
| Former [2021/47] | AT | 19.05.2021 | |
| FI | 19.05.2021 | ||
| LT | 19.05.2021 | ||
| BG | 19.08.2021 | ||
| Former [2021/46] | AT | 19.05.2021 | |
| FI | 19.05.2021 | ||
| LT | 19.05.2021 | Documents cited: | Search | [XPI] RENESAS MOBILE EUROPE LTD: "Remain Issues on PUSCH HARQ/Scheduling with cross-carrier scheduling for CC specific TDD configuration", vol. RAN WG1, no. Qingdao, China; 20120813 - 20120817, 5 August 2012 (2012-08-05), XP050661453, Retrieved from the Internet | [IA] NOKIA SIEMENS NETWORKS ET AL: "Views on inter-band CA with different TDD configurations on different bands", 3GPP DRAFT; R1-120708, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Dresden, Germany; 20120206 - 20120210, 31 January 2012 (2012-01-31), XP050563092 [I] 5-8,10-15 * section 3 * * section 5 *[A] 9 | [IA] INTEL CORPORATION: "Discussion on HARQ feedback of TDD Inter-band Carrier Aggregation", 3GPP DRAFT; R1-120207, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Dresden, Germany; 20120206 - 20120210, 31 January 2012 (2012-01-31), XP050562770 [I] 5-7,9-12,14,15 * section 2.2 * * Appendix *[A] 8,13 | [XAI] AD-HOC CHAIRMAN (SAMSUNG): "Summary of AI 7.2.1.3-7.2.1.5 session", 3GPP DRAFT; R1-120911_CA_TDD_TXD_MINS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Dresden, Germany; 20120206 - 20120210, 13 February 2012 (2012-02-13), XP050563450 [X] 1,4 * page 3 *[A] 2 [I] 3 | [A] CMCC: "Email discussion summary on Inter-band CA for supporting different TDD UL-DL configuration", 3GPP DRAFT; R1-120873_67-06 INTER-BAND CA FOR DIFFERENT TDD UL-DL CONFIGURATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Dresden, Germany; 20120206 - 20120210, 13 February 2012 (2012-02-13), XP050563412 [A] 1-15 * the whole document * | International search | [Y] US2010211845 (LEE MI-HYUN et al.) | [Y] WO2009154394 (LG ELECTRONICS INC et al.) | [A] US2011176461 (ASTELY DAVID et al.) | [Y] US2011211522 (CHUNG JAE HOON et al.) [Y] | [Y] US2011149774 (CHEN WANSHI et al.) [Y] | by applicant | "Views on inter-band CA with different TDD configurations on different bands", 3GPP TDOC. RL-120708 | "Discussion on HARQ feedback of TDD Inter-band Carrier Aggregation", 3GPP TDOC. RL-120207 | 3GPP TSG-RAN WG1 MEETING #68, February 2012 (2012-02-01) |