EP2858593 - INTRAOCULAR GAS INJECTOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.08.2021 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 25.08.2020 | ||
Former | Examination is in progress Status updated on 15.07.2020 | ||
Former | Grant of patent is intended Status updated on 23.03.2020 | ||
Former | Examination is in progress Status updated on 21.09.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Alcon Inc. Rue Louis-d'Affry 6 1701 Fribourg / CH | [2020/08] |
Former [2019/14] | For all designated states Alcon Pharmaceuticals Ltd. Rue Louis-d'Affry 6 Case Postale 1701 Fribourg / CH | ||
Former [2015/16] | For all designated states Altaviz LLC 2 Park Plaza Suite 450 Irvine, CA 92614 / US | Inventor(s) | 01 /
AULD, Jack R. 28282 El Sur Laguna Niguel, CA 92677 / US | 02 /
HUCULAK, John C. 25551 Aria Dr. Mission Viejo, CA 92692 / US | 03 /
McCOLLAM, Christopher L. 1036 Oak Glen Irvine, CA 92618 / US | [2015/16] | Representative(s) | Hanna Moore + Curley Garryard House 25-26 Earlsfort Terrace Dublin 2, D02 PX51 / IE | [N/P] |
Former [2020/40] | Hanna Moore + Curley Garryard House 25/26 Earlsfort Terrace Dublin 2, D02 PX51 / IE | ||
Former [2015/16] | Zacco Sweden AB P.O. Box 5581 114 85 Stockholm / SE | Application number, filing date | 13803578.7 | 12.06.2013 | [2020/40] | WO2013US45515 | Priority number, date | US201261658765P | 12.06.2012 Original published format: US 201261658765 P | US201361799840P | 15.03.2013 Original published format: US 201361799840 P | [2015/16] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013188595 | Date: | 19.12.2013 | Language: | EN | [2013/51] | Type: | A1 Application with search report | No.: | EP2858593 | Date: | 15.04.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.12.2013 takes the place of the publication of the European patent application. | [2015/16] | Type: | B1 Patent specification | No.: | EP2858593 | Date: | 30.09.2020 | Language: | EN | [2020/40] | Search report(s) | International search report - published on: | KR | 19.12.2013 | (Supplementary) European search report - dispatched on: | EP | 19.01.2016 | Classification | IPC: | A61M5/315, A61M5/31, A61F9/007 | [2020/07] | CPC: |
A61F9/00727 (EP,CN,US);
A61F9/007 (RU,US);
A61M5/3145 (EP,US);
A61M5/31553 (EP,US);
A61M5/3156 (EP,US);
A61M5/31596 (EP,US);
A61M2005/3128 (EP,US);
A61M2202/02 (EP,US);
A61M2210/0612 (EP,US);
A61M5/3158 (EP,US)
(-)
|
Former IPC [2015/16] | A61D1/02, A61D7/00, A61F9/007 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | INTRAOKULARER GASINJEKTOR | [2015/16] | English: | INTRAOCULAR GAS INJECTOR | [2015/16] | French: | INJECTEUR DE GAZ INTRA-OCULAIRE | [2015/16] | Entry into regional phase | 19.11.2014 | National basic fee paid | 19.11.2014 | Search fee paid | 19.11.2014 | Designation fee(s) paid | 19.11.2014 | Examination fee paid | Examination procedure | 19.11.2014 | Examination requested [2015/16] | 12.08.2016 | Amendment by applicant (claims and/or description) | 21.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 25.01.2019 | Reply to a communication from the examining division | 26.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 25.07.2019 | Reply to a communication from the examining division | 24.03.2020 | Communication of intention to grant the patent | 13.07.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 13.07.2020 | Fee for grant paid | 13.07.2020 | Fee for publishing/printing paid | 25.08.2020 | Information about intention to grant a patent | 25.08.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20195203.3 / EP3766455 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 21.09.2018 | Opposition(s) | 01.07.2021 | No opposition filed within time limit [2021/36] | Fees paid | Renewal fee | 25.06.2015 | Renewal fee patent year 03 | 10.06.2016 | Renewal fee patent year 04 | 16.06.2017 | Renewal fee patent year 05 | 12.06.2018 | Renewal fee patent year 06 | 13.06.2019 | Renewal fee patent year 07 | 15.06.2020 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.06.2013 | AL | 30.09.2020 | AT | 30.09.2020 | CY | 30.09.2020 | CZ | 30.09.2020 | DK | 30.09.2020 | EE | 30.09.2020 | FI | 30.09.2020 | HR | 30.09.2020 | LT | 30.09.2020 | LV | 30.09.2020 | MC | 30.09.2020 | MK | 30.09.2020 | PL | 30.09.2020 | RO | 30.09.2020 | RS | 30.09.2020 | SE | 30.09.2020 | SI | 30.09.2020 | SK | 30.09.2020 | SM | 30.09.2020 | BG | 30.12.2020 | NO | 30.12.2020 | GR | 31.12.2020 | IS | 30.01.2021 | PT | 01.02.2021 | IE | 12.06.2021 | LU | 12.06.2021 | BE | 30.06.2021 | [2024/22] |
Former [2023/30] | HU | 12.06.2013 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
IE | 12.06.2021 | ||
LU | 12.06.2021 | ||
BE | 30.06.2021 | ||
Former [2023/29] | HU | 12.06.2013 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
IE | 12.06.2021 | ||
LU | 12.06.2021 | ||
BE | 30.06.2021 | ||
Former [2022/34] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
IE | 12.06.2021 | ||
LU | 12.06.2021 | ||
BE | 30.06.2021 | ||
Former [2022/23] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
IE | 12.06.2021 | ||
LU | 12.06.2021 | ||
Former [2022/21] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
IE | 12.06.2021 | ||
LU | 12.06.2021 | ||
Former [2022/18] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
LU | 12.06.2021 | ||
Former [2022/10] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2022/08] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/49] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/37] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/28] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/25] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/24] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/23] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/22] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/21] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/20] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/10] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/08] | FI | 30.09.2020 | |
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
Former [2021/07] | FI | 30.09.2020 | |
NO | 30.12.2020 | Documents cited: | Search | [XI]US5334163 (SINNETT KEVIN B [US]) [X] 1,4,9 * column 1, lines 7-13 * * page 3, line 40 - page 4, line 34 * * column 4, line 64 * * column 5, line 9 - column 9, line 64; figures 1-3; claim 2 *[I] 2,3,5-8,10-15; | [XI]US2009118680 (GOLDBRUNNER PETER [US], et al) [X] 1,4,5,9-13 * paragraphs [0001] , [0008] , [0020] , [0023] - [0029]; figures 1,5,6; claim 1 * [I] 2,3,5-8,14,15 | International search | [A]US4498904 (TURNER ROBERT C [GB], et al); | [X]US5334163 (SINNETT KEVIN B [US]); | [A]US2004035491 (CASTELLANO THOMAS P [US]); | [A]US2010087776 (WARREN TIM J [US]); | [A]US2011196232 (KIM DUCKSOO [US], et al) | Examination | WO2011011423 |