| EP3085047 - METHOD OF IMPROVING SECURITY IN A COMMUNICATION NETWORK AND AUTHENTICATION ENTITY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.05.2021 Database last updated on 08.04.2026 | |
| Former | The patent has been granted Status updated on 05.06.2020 | ||
| Former | Grant of patent is intended Status updated on 25.02.2020 | ||
| Former | Examination is in progress Status updated on 15.04.2019 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Vodafone GmbH Ferdinand-Braun-Platz 1 40549 Düsseldorf / DE | [2016/43] | Inventor(s) | 01 /
BINDRIM, Walter Hennewigerweg 52 45721 Haltern am See / DE | 02 /
FERNANDES, Antonio Rheinbrohler Weg 26 40489 Düsseldorf / DE | [2020/28] |
| Former [2016/43] | 01 /
BINDRIM, Walter Hennewigerweg 52 45721 Haltern am See / DE | ||
| 02 /
FERNANDES, Antonio Rheinbrohlerweg 30 40489 Düsseldorf / DE | Representative(s) | Müller, Thomas, et al Patentanwalt emescon Balanstraße 57 81541 München / DE | [N/P] |
| Former [2016/43] | Müller & Schubert Patentanwälte Innere Wiener Straße 13 81667 München / DE | Application number, filing date | 13829039.0 | 20.12.2013 | [2016/43] | WO2013EP77644 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015090436 | Date: | 25.06.2015 | Language: | EN | [2015/25] | Type: | A1 Application with search report | No.: | EP3085047 | Date: | 26.10.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.06.2015 takes the place of the publication of the European patent application. | [2016/43] | Type: | B1 Patent specification | No.: | EP3085047 | Date: | 08.07.2020 | Language: | EN | [2020/28] | Search report(s) | International search report - published on: | EP | 25.06.2015 | Classification | IPC: | H04L29/06, H04W12/06 | [2020/11] | CPC: |
H04L63/0876 (EP);
H04W12/06 (EP);
H04W12/71 (EP);
H04W76/10 (EP)
|
| Former IPC [2016/43] | H04L29/06, H04W12/06, H04W76/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR VERBESSERUNG DER SICHERHEIT IN EINEM KOMMUNIKATIONSNETZWERK UND AUTHENTIFIZIERUNGSEINHEIT | [2016/43] | English: | METHOD OF IMPROVING SECURITY IN A COMMUNICATION NETWORK AND AUTHENTICATION ENTITY | [2016/43] | French: | PROCÉDÉ POUR AMÉLIORER LA SÉCURITÉ DANS UN RÉSEAU DE COMMUNICATION ET ENTITÉ D'AUTHENTIFICATION | [2016/43] | Entry into regional phase | 14.07.2016 | National basic fee paid | 14.07.2016 | Designation fee(s) paid | 14.07.2016 | Examination fee paid | Examination procedure | 14.07.2016 | Examination requested [2016/43] | 02.03.2017 | Amendment by applicant (claims and/or description) | 18.04.2019 | Despatch of a communication from the examining division (Time limit: M06) | 10.10.2019 | Reply to a communication from the examining division | 23.10.2019 | Despatch of a communication from the examining division (Time limit: M01) | 20.11.2019 | Reply to a communication from the examining division | 26.02.2020 | Communication of intention to grant the patent | 28.05.2020 | Fee for grant paid | 28.05.2020 | Fee for publishing/printing paid | 28.05.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.04.2019 | Opposition(s) | 09.04.2021 | No opposition filed within time limit [2021/24] | Fees paid | Renewal fee | 01.09.2016 | Renewal fee patent year 03 | 23.12.2016 | Renewal fee patent year 04 | 21.12.2017 | Renewal fee patent year 05 | 31.12.2018 | Renewal fee patent year 06 | 23.12.2019 | Renewal fee patent year 07 | Penalty fee | Additional fee for renewal fee | 20.07.2016 | 03   M06   Fee paid on   01.09.2016 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.12.2013 | AL | 08.07.2020 | AT | 08.07.2020 | CY | 08.07.2020 | CZ | 08.07.2020 | DK | 08.07.2020 | EE | 08.07.2020 | ES | 08.07.2020 | FI | 08.07.2020 | HR | 08.07.2020 | IT | 08.07.2020 | LT | 08.07.2020 | LV | 08.07.2020 | MC | 08.07.2020 | MK | 08.07.2020 | MT | 08.07.2020 | NL | 08.07.2020 | PL | 08.07.2020 | RO | 08.07.2020 | RS | 08.07.2020 | SE | 08.07.2020 | SI | 08.07.2020 | SK | 08.07.2020 | SM | 08.07.2020 | TR | 08.07.2020 | BG | 08.10.2020 | NO | 08.10.2020 | GR | 09.10.2020 | IS | 08.11.2020 | PT | 09.11.2020 | IE | 20.12.2020 | LU | 20.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | [2022/33] |
| Former [2022/32] | HU | 20.12.2013 | |
| AL | 08.07.2020 | ||
| AT | 08.07.2020 | ||
| CY | 08.07.2020 | ||
| CZ | 08.07.2020 | ||
| DK | 08.07.2020 | ||
| EE | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| MC | 08.07.2020 | ||
| MK | 08.07.2020 | ||
| MT | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RO | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| SI | 08.07.2020 | ||
| SK | 08.07.2020 | ||
| SM | 08.07.2020 | ||
| TR | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| IE | 20.12.2020 | ||
| LU | 20.12.2020 | ||
| CH | 31.12.2020 | ||
| LI | 31.12.2020 | ||
| Former [2022/27] | HU | 20.12.2013 | |
| AL | 08.07.2020 | ||
| AT | 08.07.2020 | ||
| CY | 08.07.2020 | ||
| CZ | 08.07.2020 | ||
| DK | 08.07.2020 | ||
| EE | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| MC | 08.07.2020 | ||
| MT | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RO | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| SI | 08.07.2020 | ||
| SK | 08.07.2020 | ||
| SM | 08.07.2020 | ||
| TR | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| IE | 20.12.2020 | ||
| LU | 20.12.2020 | ||
| CH | 31.12.2020 | ||
| LI | 31.12.2020 | ||
| Former [2022/26] | AL | 08.07.2020 | |
| AT | 08.07.2020 | ||
| CZ | 08.07.2020 | ||
| DK | 08.07.2020 | ||
| EE | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| MC | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RO | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| SI | 08.07.2020 | ||
| SK | 08.07.2020 | ||
| SM | 08.07.2020 | ||
| TR | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| IE | 20.12.2020 | ||
| LU | 20.12.2020 | ||
| CH | 31.12.2020 | ||
| LI | 31.12.2020 | ||
| Former [2021/52] | AL | 08.07.2020 | |
| AT | 08.07.2020 | ||
| CZ | 08.07.2020 | ||
| DK | 08.07.2020 | ||
| EE | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| MC | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RO | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| SI | 08.07.2020 | ||
| SK | 08.07.2020 | ||
| SM | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| IE | 20.12.2020 | ||
| LU | 20.12.2020 | ||
| CH | 31.12.2020 | ||
| LI | 31.12.2020 | ||
| Former [2021/47] | AL | 08.07.2020 | |
| AT | 08.07.2020 | ||
| CZ | 08.07.2020 | ||
| DK | 08.07.2020 | ||
| EE | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| MC | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RO | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| SI | 08.07.2020 | ||
| SK | 08.07.2020 | ||
| SM | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| IE | 20.12.2020 | ||
| LU | 20.12.2020 | ||
| Former [2021/46] | AL | 08.07.2020 | |
| AT | 08.07.2020 | ||
| CZ | 08.07.2020 | ||
| DK | 08.07.2020 | ||
| EE | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| MC | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RO | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| SI | 08.07.2020 | ||
| SK | 08.07.2020 | ||
| SM | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| IE | 20.12.2020 | ||
| Former [2021/40] | AL | 08.07.2020 | |
| AT | 08.07.2020 | ||
| CZ | 08.07.2020 | ||
| DK | 08.07.2020 | ||
| EE | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| MC | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RO | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| SI | 08.07.2020 | ||
| SK | 08.07.2020 | ||
| SM | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| Former [2021/36] | AL | 08.07.2020 | |
| AT | 08.07.2020 | ||
| CZ | 08.07.2020 | ||
| DK | 08.07.2020 | ||
| EE | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RO | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| SI | 08.07.2020 | ||
| SK | 08.07.2020 | ||
| SM | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| Former [2021/28] | AL | 08.07.2020 | |
| AT | 08.07.2020 | ||
| CZ | 08.07.2020 | ||
| DK | 08.07.2020 | ||
| EE | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RO | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| SK | 08.07.2020 | ||
| SM | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| Former [2021/25] | AL | 08.07.2020 | |
| AT | 08.07.2020 | ||
| CZ | 08.07.2020 | ||
| DK | 08.07.2020 | ||
| EE | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RO | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| SM | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| Former [2021/22] | AT | 08.07.2020 | |
| CZ | 08.07.2020 | ||
| DK | 08.07.2020 | ||
| EE | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RO | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| SM | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| Former [2021/20] | AT | 08.07.2020 | |
| DK | 08.07.2020 | ||
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| IT | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| Former [2021/17] | AT | 08.07.2020 | |
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| NL | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| Former [2021/10] | AT | 08.07.2020 | |
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| HR | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| LV | 08.07.2020 | ||
| PL | 08.07.2020 | ||
| RS | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| IS | 08.11.2020 | ||
| PT | 09.11.2020 | ||
| Former [2021/09] | AT | 08.07.2020 | |
| ES | 08.07.2020 | ||
| FI | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| GR | 09.10.2020 | ||
| PT | 09.11.2020 | ||
| Former [2021/08] | ES | 08.07.2020 | |
| FI | 08.07.2020 | ||
| LT | 08.07.2020 | ||
| SE | 08.07.2020 | ||
| BG | 08.10.2020 | ||
| NO | 08.10.2020 | ||
| PT | 09.11.2020 | ||
| Former [2021/07] | FI | 08.07.2020 | |
| LT | 08.07.2020 | ||
| NO | 08.10.2020 | Cited in | International search | [XI] WO2010013914 (SAMSUNG ELECTRONICS CO LTD et al.) [X] 1-4,6,7,13-17 * paragraphs [0006] , [0014] - [0017] * * figures 1-3 *[I] 5,8-12 | [XI] EP2282474 (UNILOC USA INC et al.) [X] 1-4,6,7,13-17 * paragraphs [0024] , [0057] , [0064] , [0065] * * figures 1A,3 *[I] 5,8-12 | [XI] WO2011009496 (ERICSSON TELEFON AB L M et al.) [X] 1-4,6,7,13-17 * page 5, line 32 - page 6, line 17 * * figure 1 *[I] 5,8-12 |