EP2984016 - ELEVATOR SECURITY CONTROL SYSTEM AND METHOD [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 16.08.2019 Database last updated on 11.05.2024 | |
Former | Grant of patent is intended Status updated on 26.03.2019 | ||
Former | Examination is in progress Status updated on 10.02.2017 | Most recent event Tooltip | 01.09.2023 | Change: Date of oral proceedings | 01.09.2023 | Deletion: Despatch of minutes of oral proceedings | Applicant(s) | For all designated states Sensormatic Electronics LLC 1501 Yamato Road Boca Raton, Florida 33431 / US | [2016/07] | Inventor(s) | 01 /
KUMAR, Saravana Flat No. F1 Andrabhi Classic 1st Cross Ashirwad Colony PNT Layout Near Deva Matha Central School, Horamavu Main Road Bangalore Karnataka 560043 / IN | 02 /
OUELLETTE, Jason M. 452 Dennison Drive Southbridge, Massachusetts 01550 / US | [2016/07] | Representative(s) | dompatent von Kreisler Selting Werner - Partnerschaft von Patent- und Rechtsanwälten mbB Deichmannhaus am Dom Bahnhofsvorplatz 1 50667 Köln / DE | [2019/38] |
Former [2016/07] | von Kreisler Selting Werner - Partnerschaft von Patentanwälten und Rechtsanwälten mbB Deichmannhaus am Dom Bahnhofsvorplatz 1 50667 Köln / DE | Application number, filing date | 14705444.9 | 30.01.2014 | [2016/07] | WO2014US13886 | Priority number, date | US201361810326P | 10.04.2013 Original published format: US 201361810326 P | US201313961158 | 07.08.2013 Original published format: US201313961158 | [2016/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014168676 | Date: | 16.10.2014 | Language: | EN | [2014/42] | Type: | A1 Application with search report | No.: | EP2984016 | Date: | 17.02.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.10.2014 takes the place of the publication of the European patent application. | [2016/07] | Type: | B1 Patent specification | No.: | EP2984016 | Date: | 18.09.2019 | Language: | EN | [2019/38] | Search report(s) | International search report - published on: | EP | 16.10.2014 | Classification | IPC: | B66B5/00 | [2019/10] | CPC: |
B66B5/0006 (EP,US);
B66B1/468 (US);
B66B2201/4676 (US)
|
Former IPC [2016/07] | B66B1/46 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SICHERHEITSSTEUERUNGSSYSTEM UND VERFAHREN FÜR AUFZÜGE | [2017/07] | English: | ELEVATOR SECURITY CONTROL SYSTEM AND METHOD | [2016/07] | French: | SYSTÈME ET PROCÉDÉ DE CONTRÔLE DE SÉCURITÉ POUR ASCENSEURS | [2017/07] |
Former [2016/07] | AUFZUGSICHERHEITSTEUERUNGSSYSTEM UND -VERFAHREN | ||
Former [2016/07] | SYSTÈME DE COMMANDE DE SÉCURITÉ D'ASCENSEUR ET PROCÉDÉ | Entry into regional phase | 03.11.2015 | National basic fee paid | 03.11.2015 | Designation fee(s) paid | 03.11.2015 | Examination fee paid | Examination procedure | 28.08.2014 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 03.11.2015 | Examination requested [2016/07] | 04.05.2016 | Amendment by applicant (claims and/or description) | 10.02.2017 | Despatch of a communication from the examining division (Time limit: M04) | 20.06.2017 | Reply to a communication from the examining division | 27.03.2019 | Communication of intention to grant the patent | 30.07.2019 | Fee for grant paid | 30.07.2019 | Fee for publishing/printing paid | 30.07.2019 | Receipt of the translation of the claim(s) | 13.10.2021 | Observations by third parties | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.02.2017 | Opposition(s) | Opponent(s) | 01
18.06.2020
ADMISSIBLE Otis Elevator Company Intellectual Property Department One Carrier Place Farmington, Connecticut 06032 / US Opponent's representative Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [2020/31] | 02.07.2020 | Invitation to proprietor to file observations on the notice of opposition | 11.11.2020 | Reply of patent proprietor to notice(s) of opposition | 18.01.2022 | Date of oral proceedings | 14.02.2022 | Despatch of minutes of oral proceedings | 14.02.2022 | Despatch of communication that the patent will be revoked | Appeal following opposition | 11.04.2022 | Appeal received No. T1152/22 | 11.04.2022 | Payment of appeal fee | 20.06.2022 | Statement of grounds filed | 02.07.2024 | Date of oral proceedings | Fees paid | Renewal fee | 27.01.2016 | Renewal fee patent year 03 | 27.01.2017 | Renewal fee patent year 04 | 29.01.2018 | Renewal fee patent year 05 | 28.01.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.01.2014 | AL | 18.09.2019 | AT | 18.09.2019 | CY | 18.09.2019 | CZ | 18.09.2019 | DK | 18.09.2019 | EE | 18.09.2019 | ES | 18.09.2019 | FI | 18.09.2019 | HR | 18.09.2019 | IT | 18.09.2019 | LT | 18.09.2019 | LV | 18.09.2019 | MC | 18.09.2019 | MK | 18.09.2019 | MT | 18.09.2019 | NL | 18.09.2019 | PL | 18.09.2019 | RO | 18.09.2019 | RS | 18.09.2019 | SE | 18.09.2019 | SI | 18.09.2019 | SK | 18.09.2019 | SM | 18.09.2019 | TR | 18.09.2019 | BG | 18.12.2019 | NO | 18.12.2019 | GR | 19.12.2019 | IS | 19.01.2020 | PT | 20.01.2020 | IE | 30.01.2020 | LU | 30.01.2020 | BE | 31.01.2020 | CH | 31.01.2020 | LI | 31.01.2020 | [2022/32] |
Former [2022/27] | HU | 30.01.2014 | |
AL | 18.09.2019 | ||
AT | 18.09.2019 | ||
CY | 18.09.2019 | ||
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
ES | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
IT | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
MC | 18.09.2019 | ||
MT | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SI | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
TR | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
IE | 30.01.2020 | ||
LU | 30.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2021/08] | AL | 18.09.2019 | |
AT | 18.09.2019 | ||
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
ES | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
IT | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
MC | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SI | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
IE | 30.01.2020 | ||
LU | 30.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/51] | AL | 18.09.2019 | |
AT | 18.09.2019 | ||
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
ES | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
IT | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
MC | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SI | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
LU | 30.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/46] | AL | 18.09.2019 | |
AT | 18.09.2019 | ||
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
ES | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
IT | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
MC | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SI | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
LU | 30.01.2020 | ||
Former [2020/39] | AL | 18.09.2019 | |
AT | 18.09.2019 | ||
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
ES | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
IT | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
MC | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SI | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
Former [2020/37] | AL | 18.09.2019 | |
AT | 18.09.2019 | ||
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
ES | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
IT | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SI | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
Former [2020/36] | AL | 18.09.2019 | |
AT | 18.09.2019 | ||
CZ | 18.09.2019 | ||
DK | 18.09.2019 | ||
EE | 18.09.2019 | ||
ES | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
IT | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
IS | 19.01.2020 | ||
PT | 20.01.2020 | ||
Former [2020/27] | AL | 18.09.2019 | |
AT | 18.09.2019 | ||
CZ | 18.09.2019 | ||
EE | 18.09.2019 | ||
ES | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
IT | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SK | 18.09.2019 | ||
SM | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
PT | 20.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 18.09.2019 | |
AT | 18.09.2019 | ||
CZ | 18.09.2019 | ||
EE | 18.09.2019 | ||
ES | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
IT | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
SK | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
PT | 20.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 18.09.2019 | |
AT | 18.09.2019 | ||
EE | 18.09.2019 | ||
ES | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
IT | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
PT | 20.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 18.09.2019 | |
AT | 18.09.2019 | ||
EE | 18.09.2019 | ||
ES | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
IT | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
PL | 18.09.2019 | ||
RO | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
PT | 20.01.2020 | ||
Former [2020/22] | AL | 18.09.2019 | |
EE | 18.09.2019 | ||
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
PT | 20.01.2020 | ||
Former [2020/20] | AL | 18.09.2019 | |
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
NL | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
Former [2020/15] | AL | 18.09.2019 | |
FI | 18.09.2019 | ||
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
Former [2020/11] | FI | 18.09.2019 | |
HR | 18.09.2019 | ||
LT | 18.09.2019 | ||
LV | 18.09.2019 | ||
RS | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
GR | 19.12.2019 | ||
Former [2020/10] | FI | 18.09.2019 | |
LT | 18.09.2019 | ||
SE | 18.09.2019 | ||
BG | 18.12.2019 | ||
NO | 18.12.2019 | ||
Former [2020/09] | FI | 18.09.2019 | |
LT | 18.09.2019 | ||
NO | 18.12.2019 | ||
Former [2020/08] | LT | 18.09.2019 | |
NO | 18.12.2019 | Cited in | International search | [A]WO2011075115 (OTIS ELEVATOR CO [US], et al) [A] 1-24* the whole document * | Examination | US8151942 | other | WO2011075115 | - Gallagher Security, "Gallagher Command Centre", Technical details, (201208), pages 1 - 16, URL: https://www.sourcesecurity.com/gallagher-command-centre-technical-details.html, XP055859770 | Opposition | JP2008280117 | - Anonymous, "Knowledge Base Article Example Access Control Project Involving Elevators", ISONAS Securrity Systems, (20081110), pages 1 - 21, ISONAS Securrity Systems, URL: https://www.isonas.com/files/KnowledgeBase_KBA0110ElevatorDigitalIO.pdf, (20201207), XP055757341 | - Anonymous, "History of APIs", amazon social, (20200618), pages 1 - 5, amazon social, URL: https://apievangelist.com/ 2012/12/20 /history-of-apis, (20201207), XP055757352 | - Anonymous, "Compass Destination Management A solution for every building", OTIS, (20090101), pages 1 - 8, XP055757450 |