EP3077559 - ALUMINUM/COPPER/LITHIUM ALLOY MATERIAL FOR UNDERWING ELEMENT HAVING ENHANCED PROPERTIES AND PROCESS FOR ITS MANUFACTURE [Right-click to bookmark this link] | |||
Former [2016/41] | ALUMINUM/COPPER/LITHIUM ALLOY MATERIAL FOR UNDERWING ELEMENT HAVING ENHANCED PROPERTIES | ||
[2018/14] | Status | The patent has been granted Status updated on 20.07.2018 Database last updated on 11.05.2024 | |
Former | Grant of patent is intended Status updated on 27.03.2018 | ||
Former | Examination is in progress Status updated on 31.03.2017 | Most recent event Tooltip | 22.12.2023 | New entry: Decision (+date) in appeal procedure | Applicant(s) | For all designated states Constellium Issoire Rue Yves Lamourdedieu ZI des Listes 63500 Issoire / FR | [2018/34] |
Former [2016/41] | For all designated states Constellium Issoire Rue Yves Lamourdedieu ZI Les Listes 63500 Issoire / FR | Inventor(s) | 01 /
BAYONA-CARRILLO, Nicolas 51B rue de la Tour de Criel 38500 Voiron / FR | [2016/41] | Representative(s) | Constellium - Propriété Industrielle C-TEC Constellium Technology Center Propriété Industrielle Parc Economique Centr'Alp 725, rue Aristide Bergès, CS10027 38341 Voreppe / FR | [2016/41] | Application number, filing date | 14821688.0 | 02.12.2014 | [2016/41] | WO2014FR00256 | Priority number, date | FR20130002833 | 05.12.2013 Original published format: FR 1302833 | [2016/41] | Filing language | FR | Procedural language | FR | Publication | Type: | A2 Application without search report | No.: | WO2015082779 | Date: | 11.06.2015 | Language: | FR | [2015/23] | Type: | A2 Application without search report | No.: | EP3077559 | Date: | 12.10.2016 | Language: | FR | The application published by WIPO in one of the EPO official languages on 11.06.2015 takes the place of the publication of the European patent application. | [2016/41] | Type: | B1 Patent specification | No.: | EP3077559 | Date: | 22.08.2018 | Language: | FR | [2018/34] | Search report(s) | International search report - published on: | EP | 20.08.2015 | Classification | IPC: | C22C21/16, C22C21/14, C22F1/057, B64C3/26 | [2018/14] | CPC: |
B64C3/26 (EP,KR,US);
C22C21/16 (EP,CN,KR,US);
C22C21/14 (EP,CN,US);
B21B3/00 (US);
B21J1/003 (KR,US);
C22C21/00 (CN);
C22C21/12 (CN);
C22F1/002 (CN);
C22F1/04 (CN);
|
Former IPC [2016/41] | C22C21/16, B64C1/00, C22F1/057 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/41] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ALUMINIUM-/KUPFER-/LITHIUMLEGIERUNGSMATERIAL FÜR EIN FLÜGELUNTERSEITENELEMENT MIT VERBESSERTEN EIGENSCHAFTEN UND VERFAHREN ZU DESSEN HERSTELLUNG | [2018/14] | English: | ALUMINUM/COPPER/LITHIUM ALLOY MATERIAL FOR UNDERWING ELEMENT HAVING ENHANCED PROPERTIES AND PROCESS FOR ITS MANUFACTURE | [2018/14] | French: | PRODUIT EN ALLIAGE ALUMINIUM-CUIVRE-LITHIUM POUR ÉLÉMENT D'INTRADOS A PROPRIÉTÉS AMÉLIORÉES ET PROCÉDÉ DE SA PRODUCTION | [2018/14] |
Former [2016/41] | ALUMINIUM-/KUPFER-/LITHIUMLEGIERUNGSMATERIAL FÜR EIN FLÜGELUNTERSEITENELEMENT MIT VERBESSERTEN EIGENSCHAFTEN | ||
Former [2016/41] | ALUMINUM/COPPER/LITHIUM ALLOY MATERIAL FOR UNDERWING ELEMENT HAVING ENHANCED PROPERTIES | ||
Former [2016/41] | PRODUIT EN ALLIAGE ALUMINIUM-CUIVRE-LITHIUM POUR ÉLÉMENT D'INTRADOS A PROPRIÉTÉS AMÉLIORÉES | Entry into regional phase | 01.07.2016 | National basic fee paid | 01.07.2016 | Designation fee(s) paid | 01.07.2016 | Examination fee paid | Examination procedure | 01.07.2016 | Examination requested [2016/41] | 11.01.2017 | Amendment by applicant (claims and/or description) | 29.03.2017 | Despatch of a communication from the examining division (Time limit: M04) | 28.07.2017 | Reply to a communication from the examining division | 28.03.2018 | Communication of intention to grant the patent | 12.07.2018 | Fee for grant paid | 12.07.2018 | Fee for publishing/printing paid | 12.07.2018 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
22.05.2019
27.05.2019
ADMISSIBLE Howmet Aerospace Inc. 201 Isabella Street Pittsburgh, PA 15212-5858 / US Opponent's representative Forresters IP LLP Skygarden Erika-Mann-Straße 11 80636 München / DE | [2020/43] |
Former [2020/41] | |||
Opponent(s) | 01
22.05.2019
27.05.2019
ADMISSIBLE Howmet Aerospace Inc. 201 Isabella Street Pittsburgh, PA 15212-5858 / US Opponent's representative Barton, Matthew Thomas Forresters IP LLP Skygarden Erika-Mann-Strasse 11 80636 München / DE | ||
Former [2019/26] | |||
Opponent(s) | 01
22.05.2019
ADMISSIBLE Arconic Inc. 201 Isabella Street Pittsburgh, PA 15212-5858 / US Opponent's representative Barton, Matthew Thomas Forresters IP LLP Skygarden Erika-Mann-Strasse 11 80636 München / DE | deleted | Deletion: Legal effect of rejection of opposition [ N /P ] | 04.06.2019 | Invitation to proprietor to file observations on the notice of opposition | 04.10.2019 | Reply of patent proprietor to notice(s) of opposition | 06.05.2020 | Cancellation of oral proceeding that was planned for 27.05.2020 | 27.05.2020 | Date of oral proceedings | 16.09.2020 | Cancellation of oral proceeding that was planned for 16.12.2020 | 16.12.2020 | Date of oral proceedings | 02.09.2021 | Date of oral proceedings | 04.10.2021 | Despatch of minutes of oral proceedings | 04.10.2021 | Date of despatch of rejection of opposition | Appeal following opposition | 22.11.2021 | Appeal received No. T2045/21 | 22.11.2021 | Payment of appeal fee | 14.02.2022 | Statement of grounds filed | 21.12.2023 | Result of appeal procedure: maintenance in amended form | 06.03.2024 | Despatch of the decision of the Board of Appeal | 21.12.2023 | Date of oral proceedings | Fees paid | Renewal fee | 27.12.2016 | Renewal fee patent year 03 | 27.12.2017 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.12.2014 | AL | 22.08.2018 | CY | 22.08.2018 | CZ | 22.08.2018 | DK | 22.08.2018 | EE | 22.08.2018 | ES | 22.08.2018 | FI | 22.08.2018 | HR | 22.08.2018 | IT | 22.08.2018 | LT | 22.08.2018 | LV | 22.08.2018 | MC | 22.08.2018 | MK | 22.08.2018 | MT | 22.08.2018 | NL | 22.08.2018 | PL | 22.08.2018 | PT | 22.08.2018 | RO | 22.08.2018 | RS | 22.08.2018 | SE | 22.08.2018 | SI | 22.08.2018 | SK | 22.08.2018 | SM | 22.08.2018 | TR | 22.08.2018 | BG | 22.11.2018 | NO | 22.11.2018 | GR | 23.11.2018 | IE | 02.12.2018 | LU | 02.12.2018 | IS | 22.12.2018 | BE | 31.12.2018 | CH | 31.12.2018 | LI | 31.12.2018 | [2020/31] |
Former [2020/28] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
MT | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
PT | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
TR | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IE | 02.12.2018 | ||
LU | 02.12.2018 | ||
IS | 22.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/17] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
MT | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
TR | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IE | 02.12.2018 | ||
LU | 02.12.2018 | ||
IS | 22.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/08] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
MT | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IE | 02.12.2018 | ||
LU | 02.12.2018 | ||
IS | 22.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2020/04] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IE | 02.12.2018 | ||
LU | 02.12.2018 | ||
IS | 22.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
Former [2019/51] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IE | 02.12.2018 | ||
LU | 02.12.2018 | ||
IS | 22.12.2018 | ||
BE | 31.12.2018 | ||
Former [2019/48] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IE | 02.12.2018 | ||
LU | 02.12.2018 | ||
IS | 22.12.2018 | ||
Former [2019/40] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
MC | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
LU | 02.12.2018 | ||
IS | 22.12.2018 | ||
Former [2019/39] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
LU | 02.12.2018 | ||
IS | 22.12.2018 | ||
Former [2019/37] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SI | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/26] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
DK | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SK | 22.08.2018 | ||
SM | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/23] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
EE | 22.08.2018 | ||
ES | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
SK | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/22] | AL | 22.08.2018 | |
CZ | 22.08.2018 | ||
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
PL | 22.08.2018 | ||
RO | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/21] | AL | 22.08.2018 | |
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
IT | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/12] | AL | 22.08.2018 | |
FI | 22.08.2018 | ||
HR | 22.08.2018 | ||
LT | 22.08.2018 | ||
LV | 22.08.2018 | ||
NL | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/11] | FI | 22.08.2018 | |
HR | 22.08.2018 | ||
LT | 22.08.2018 | ||
NL | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/10] | FI | 22.08.2018 | |
LT | 22.08.2018 | ||
NL | 22.08.2018 | ||
RS | 22.08.2018 | ||
SE | 22.08.2018 | ||
BG | 22.11.2018 | ||
NO | 22.11.2018 | ||
GR | 23.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/09] | FI | 22.08.2018 | |
LT | 22.08.2018 | ||
NL | 22.08.2018 | ||
NO | 22.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/08] | FI | 22.08.2018 | |
LT | 22.08.2018 | ||
NO | 22.11.2018 | ||
IS | 22.12.2018 | ||
Former [2019/07] | LT | 22.08.2018 | Cited in | International search | [IDA]EP1966402 (ALCAN RHENALU [FR]) [ID] 9,11 * the whole document * [A] 1-8,10; | [AD]US5198045 (CHO ALEX [US], et al) [AD] 1-11 * the whole document *; | [AD]US2013255839 (HEYMES FABRICE [FR], et al) [AD] 1-11 * the whole document *; | [A]US2011278397 (BES BERNARD [FR], et al) [A] 1-11 * the whole document * | [IA] - LEE CHANG-SOON ET AL, "Effect of microstructure and load ratio on fatigue crack growth behavior of advanced Al - Cu - Li - Mg -Ag alloys", METALS AND MATERIALS, KOREAN INSITUTE OF METALS AND MATERIALS, KOREA, (19971231), vol. 3, no. 1, doi:10.1007/BF03026106, ISSN 1598-9623, pages 51 - 59, XP009128087 [I] 9,11 * the whole document * [A] 1-8,10 DOI: http://dx.doi.org/10.1007/BF03026106 | by applicant | US5032359 | US5198045 | US7229509 | EP1966402 | EP1891247 | US5455003 | WO2010055225 | WO2011141647 | - LEE CHANG-SOON ET AL., "Effect of microstructure and load ratio on fatigue crack growth behavior of advanced Al-Cu-Li-Mg-Ag alloys", METALS AND MATERIALS, (1997), vol. 3, no. L, doi:doi:10.1007/BF03026106, pages 51 - 59, XP009128087 DOI: http://dx.doi.org/10.1007/BF03026106 | Opposition | US5198045 | US2010126637 | US2010314007 | US2011278397 |