EP3065491 - DISCOVERY SIGNAL PROCESSING METHOD, BASE STATION AND COMPUTER STORAGE MEDIUM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.04.2021 Database last updated on 15.05.2024 | |
Former | The patent has been granted Status updated on 08.05.2020 | ||
Former | Grant of patent is intended Status updated on 02.01.2020 | ||
Former | Examination is in progress Status updated on 19.10.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states ZTE Corporation ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan District Shenzhen, Guangdong 518057 / CN | [2020/24] |
Former [2016/36] | For all designated states ZTE Corporation ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan District Shenzhen, Guangdong 518057 / CN | Inventor(s) | 01 /
ZHAO, Yajun ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 02 /
MO, Linmei ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 03 /
XU, Hanqing ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | [2016/36] | Representative(s) | Lavoix Bayerstraße 83 80335 München / DE | [N/P] |
Former [2016/36] | Lavoix Bayerstrasse 83 80335 München / DE | Application number, filing date | 14858730.6 | 24.10.2014 | [2016/36] | WO2014CN89481 | Priority number, date | CN201310535676 | 01.11.2013 Original published format: CN201310535676 | CN201410228839 | 27.05.2014 Original published format: CN201410228839 | [2016/36] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015062451 | Date: | 07.05.2015 | Language: | ZH | [2015/18] | Type: | A1 Application with search report | No.: | EP3065491 | Date: | 07.09.2016 | Language: | EN | [2016/36] | Type: | B1 Patent specification | No.: | EP3065491 | Date: | 10.06.2020 | Language: | EN | [2020/24] | Search report(s) | International search report - published on: | CN | 07.05.2015 | (Supplementary) European search report - dispatched on: | EP | 18.07.2016 | Classification | IPC: | H04W72/04, H04W48/08, // H04W88/08, H04W48/14, H04B7/26, H04W56/00, H04W76/27 | [2020/01] | CPC: |
H04W48/14 (EP,KR,US);
H04L5/0053 (CN);
H04W24/02 (US);
H04B7/2656 (EP,US);
H04J11/00 (US);
H04J11/0069 (KR);
H04L5/0051 (US);
H04L5/0062 (US);
H04W16/26 (US);
H04W16/32 (US);
H04W24/10 (CN);
H04W56/001 (EP,US);
H04W72/52 (US);
H04W72/53 (KR);
H04W72/54 (US);
|
Former IPC [2016/36] | H04W72/04, H04W48/08, // H04W88/08, H04W48/14 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ENTDECKUNGSSIGNALVERARBEITUNGSVERFAHREN, BASISSTATION UND COMPUTERSPEICHERMEDIUM | [2016/36] | English: | DISCOVERY SIGNAL PROCESSING METHOD, BASE STATION AND COMPUTER STORAGE MEDIUM | [2016/36] | French: | PROCÉDÉ DE TRAITEMENT DE SIGNAUX DE DÉCOUVERTE, STATION DE BASE ET SUPPORT DE STOCKAGE INFORMATIQUE | [2016/36] | Entry into regional phase | 01.06.2016 | Translation filed | 01.06.2016 | National basic fee paid | 01.06.2016 | Search fee paid | 01.06.2016 | Designation fee(s) paid | 01.06.2016 | Examination fee paid | Examination procedure | 01.06.2016 | Examination requested [2016/36] | 26.01.2017 | Amendment by applicant (claims and/or description) | 22.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 21.02.2019 | Reply to a communication from the examining division | 03.01.2020 | Communication of intention to grant the patent | 29.04.2020 | Fee for grant paid | 29.04.2020 | Fee for publishing/printing paid | 29.04.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 11.03.2021 | No opposition filed within time limit [2021/20] | Fees paid | Renewal fee | 28.09.2016 | Renewal fee patent year 03 | 27.10.2017 | Renewal fee patent year 04 | 30.10.2018 | Renewal fee patent year 05 | 28.10.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.10.2014 | AL | 10.06.2020 | AT | 10.06.2020 | CY | 10.06.2020 | CZ | 10.06.2020 | DK | 10.06.2020 | EE | 10.06.2020 | FI | 10.06.2020 | HR | 10.06.2020 | LT | 10.06.2020 | LV | 10.06.2020 | MC | 10.06.2020 | MK | 10.06.2020 | MT | 10.06.2020 | NL | 10.06.2020 | PL | 10.06.2020 | RO | 10.06.2020 | RS | 10.06.2020 | SE | 10.06.2020 | SI | 10.06.2020 | SK | 10.06.2020 | SM | 10.06.2020 | TR | 10.06.2020 | BG | 10.09.2020 | NO | 10.09.2020 | GR | 11.09.2020 | IS | 10.10.2020 | PT | 12.10.2020 | IE | 24.10.2020 | LU | 24.10.2020 | BE | 31.10.2020 | CH | 31.10.2020 | FR | 31.10.2020 | LI | 31.10.2020 | [2022/32] |
Former [2022/27] | HU | 24.10.2014 | |
AL | 10.06.2020 | ||
AT | 10.06.2020 | ||
CY | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
MT | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
TR | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
IE | 24.10.2020 | ||
LU | 24.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
FR | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2021/46] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
IE | 24.10.2020 | ||
LU | 24.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
FR | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2021/37] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
LU | 24.10.2020 | ||
BE | 31.10.2020 | ||
CH | 31.10.2020 | ||
FR | 31.10.2020 | ||
LI | 31.10.2020 | ||
Former [2021/36] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
LU | 24.10.2020 | ||
BE | 31.10.2020 | ||
FR | 31.10.2020 | ||
Former [2021/35] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
LU | 24.10.2020 | ||
FR | 31.10.2020 | ||
Former [2021/31] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
MC | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
LU | 24.10.2020 | ||
Former [2021/24] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SI | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/21] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
DK | 10.06.2020 | ||
EE | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/10] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
EE | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
PL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SK | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
IS | 10.10.2020 | ||
PT | 12.10.2020 | ||
Former [2021/09] | AL | 10.06.2020 | |
AT | 10.06.2020 | ||
CZ | 10.06.2020 | ||
EE | 10.06.2020 | ||
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
RO | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
SM | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
PT | 12.10.2020 | ||
Former [2021/04] | AL | 10.06.2020 | |
FI | 10.06.2020 | ||
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
NL | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2021/01] | FI | 10.06.2020 | |
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
BG | 10.09.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2020/51] | FI | 10.06.2020 | |
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
RS | 10.06.2020 | ||
SE | 10.06.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2020/50] | FI | 10.06.2020 | |
HR | 10.06.2020 | ||
LT | 10.06.2020 | ||
LV | 10.06.2020 | ||
SE | 10.06.2020 | ||
NO | 10.09.2020 | ||
GR | 11.09.2020 | ||
Former [2020/48] | FI | 10.06.2020 | |
LT | 10.06.2020 | ||
SE | 10.06.2020 | ||
NO | 10.09.2020 | ||
Former [2020/47] | LT | 10.06.2020 | |
NO | 10.09.2020 | Documents cited: | Search | [A]US5040238 (COMROE RICHARD A [US], et al) [A] 1* page 6, lines 36-53 *; | [A]EP2533595 (ALCATEL LUCENT [FR]) [A] 1,2,13-15 * paragraph [0029] *; | [A]US2013196675 (XIAO WEIMIN [US], et al) [A] 3 * paragraph [0004] *; | [I] - CMCC, "Procedures for efficient discovery of small cells", vol. RAN WG1, no. Fukuoka, Japan; 20130520 - 20130524, (20130511), 3GPP DRAFT; R1-132547_PROCEDURES FOR EFFICIENT DISCOVERY OF SMALL CELLS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_73/Docs/, (20130511), XP050698265 [I] 1-11,13-15 * chapter 2.4, points 1 -3 in table 1 * | [A] - NEC GROUP, "Discussion on possible small cell discovery schemes", vol. RAN WG1, no. Guangzhou, China; 20131007 - 20131011, (20130927), 3GPP DRAFT; R1-134255, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_74b/Docs/, (20130927), XP050717149 [A] 3,4,6,7 * chapter 3.1 * * chapter 3.1. Observation 2: * * last sentence of chapter 3.2 * | [A] - MEDIATEK INC, "Performance Evaluation for Small Cell Discovery Using New Schemes Based On CSI-RS and PRS", vol. RAN WG1, no. Fukuoka, Japan; 20130520 - 20130524, (20130511), 3GPP DRAFT; R1-132281_EVALUATION FOR DISCOVERY USING CSIRS AND PRS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRA, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_73/Docs/, (20130511), XP050698048 [A] 1 * chapter 2 * | [A] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Small cell enhancements for E-UTRA and E-UTRAN - Physical layer aspects (Release 12)", 3GPP STANDARD; 3GPP TR 36.872, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20130920), vol. RAN WG1, no. V12.0.0, pages 1 - 78, XP050712719 [A] 8 * chapter 7.2.2.2 * | [A] - INTERDIGITAL, "Evaluation scenarios and methodology for LTE D2D", vol. RAN WG1, no. Chicago, USA; 20130415 - 20130419, (20130406), 3GPP DRAFT; R1-131345, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_72b/Docs/, (20130406), XP050697200 [A] 1 * chapter 2 General COnsiderations - Recommendation 1 * | International search | [A]CN102468926 (ZTE CORP); | [X]CN102546113 (NEW POSTCOM EQUIPMENT CO LTD); | [A]CN103155643 (QUALCOMM INC); | [A]CN103369583 (HUAWEI TECH CO LTD); | [A]CN103581993 (IND TECH RES INST) |