EP3085636 - SEALING FOIL WITH TEAR LINE [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 17.05.2019 Database last updated on 11.05.2024 | |
Former | Grant of patent is intended Status updated on 06.01.2019 | ||
Former | Examination is in progress Status updated on 15.09.2017 | ||
Former | Request for examination was made Status updated on 15.06.2017 | Most recent event Tooltip | 06.03.2024 | New entry: Decision (+date) in appeal procedure | Applicant(s) | For all designated states N.V. Nutricia Eerste Stationsstraat 186 2712 HM Zoetermeer / NL | [2019/25] |
Former [2016/43] | For all designated states N.V. Nutricia Eerste Stationsstraat 186 2712 HM Zoetermeer / NL | Inventor(s) | 01 /
JOBSE, Pieter, Samuel Eerste Stationsstraat 186 2712 HM Zoetermeer / NL | [2016/43] | Representative(s) | Nederlandsch Octrooibureau P.O. Box 29720 2502 LS The Hague / NL | [2016/43] | Application number, filing date | 15164282.4 | 20.04.2015 | [2016/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3085636 | Date: | 26.10.2016 | Language: | EN | [2016/43] | Type: | B1 Patent specification | No.: | EP3085636 | Date: | 19.06.2019 | Language: | EN | [2019/25] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.06.2015 | Classification | IPC: | B65D51/20 | [2016/43] | CPC: |
B65D51/20 (EP);
B65D2251/0093 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/23] |
Former [2016/43] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DICHTUNGSBAHN MIT EINER AUFREISSLINIE | [2016/43] | English: | SEALING FOIL WITH TEAR LINE | [2016/43] | French: | FEUILLE D'ÉTANCHÉITÉ AVEC LIGNE DE DÉCHIRURE | [2016/43] | Examination procedure | 20.04.2015 | Date on which the examining division has become responsible | 26.04.2017 | Amendment by applicant (claims and/or description) | 26.04.2017 | Examination requested [2017/23] | 15.09.2017 | Despatch of a communication from the examining division (Time limit: M06) | 26.03.2018 | Reply to a communication from the examining division | 07.05.2018 | Observations by third parties | 08.05.2018 | Despatch of a communication from the examining division (Time limit: M06) | 06.11.2018 | Reply to a communication from the examining division | 07.01.2019 | Communication of intention to grant the patent | 07.05.2019 | Fee for grant paid | 07.05.2019 | Fee for publishing/printing paid | 07.05.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | EP19180632.2 / EP3578479 | Opposition(s) | Opponent(s) | 01
11.03.2020
27.03.2020
ADMISSIBLE GPI Systems AB Box 177 221 00 Lund / SE Opponent's representative Valea AB Box 1098 405 23 Göteborg / SE | [2024/14] |
Former [2020/16] | |||
Opponent(s) | 01
11.03.2020
ADMISSIBLE Å&R Carton Lund AB Box 177 221 00 Lund / SE Opponent's representative Valea AB Box 1098 405 23 Göteborg / SE | deleted | Deletion: Legal effect of rejection of opposition [ N /P ] | 18.06.2020 | Invitation to proprietor to file observations on the notice of opposition | 20.10.2020 | Reply of patent proprietor to notice(s) of opposition | 25.11.2021 | Date of oral proceedings | 05.04.2022 | Despatch of minutes of oral proceedings | 05.04.2022 | Date of despatch of rejection of opposition | Appeal following opposition | 07.06.2022 | Appeal received No. T1451/22 | 07.06.2022 | Payment of appeal fee | 11.08.2022 | Statement of grounds filed | 05.03.2024 | Result of appeal procedure: appeal of the opponent was rejected | 07.05.2024 | Despatch of the decision of the Board of Appeal | 05.03.2024 | Date of oral proceedings | Fees paid | Renewal fee | 31.03.2017 | Renewal fee patent year 03 | 18.04.2018 | Renewal fee patent year 04 | 30.04.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.04.2015 | AL | 19.06.2019 | AT | 19.06.2019 | CY | 19.06.2019 | CZ | 19.06.2019 | DK | 19.06.2019 | EE | 19.06.2019 | ES | 19.06.2019 | FI | 19.06.2019 | HR | 19.06.2019 | IT | 19.06.2019 | LT | 19.06.2019 | LV | 19.06.2019 | MC | 19.06.2019 | MK | 19.06.2019 | MT | 19.06.2019 | PL | 19.06.2019 | RO | 19.06.2019 | RS | 19.06.2019 | SI | 19.06.2019 | SK | 19.06.2019 | SM | 19.06.2019 | TR | 19.06.2019 | BG | 19.09.2019 | NO | 19.09.2019 | GR | 20.09.2019 | IS | 19.10.2019 | PT | 21.10.2019 | LU | 20.04.2020 | BE | 30.04.2020 | CH | 30.04.2020 | LI | 30.04.2020 | [2022/32] |
Former [2022/28] | HU | 20.04.2015 | |
AL | 19.06.2019 | ||
AT | 19.06.2019 | ||
CY | 19.06.2019 | ||
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
MC | 19.06.2019 | ||
MT | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
SM | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
LU | 20.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2021/12] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
MC | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
SM | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
LU | 20.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2021/08] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
MC | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
SM | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
LU | 20.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2021/07] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
MC | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
SM | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2020/52] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
MC | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
SM | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/37] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SI | 19.06.2019 | ||
SK | 19.06.2019 | ||
SM | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/36] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SK | 19.06.2019 | ||
SM | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/24] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
PL | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SK | 19.06.2019 | ||
SM | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
PT | 21.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/22] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
DK | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SK | 19.06.2019 | ||
SM | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/17] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SK | 19.06.2019 | ||
SM | 19.06.2019 | ||
TR | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/13] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SK | 19.06.2019 | ||
SM | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/12] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
IT | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SK | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
IS | 19.10.2019 | ||
PT | 21.10.2019 | ||
Former [2020/11] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
EE | 19.06.2019 | ||
ES | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
SK | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
PT | 21.10.2019 | ||
Former [2020/10] | AL | 19.06.2019 | |
AT | 19.06.2019 | ||
CZ | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RO | 19.06.2019 | ||
RS | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
PT | 21.10.2019 | ||
Former [2020/09] | AL | 19.06.2019 | |
CZ | 19.06.2019 | ||
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RS | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
Former [2019/51] | AL | 19.06.2019 | |
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RS | 19.06.2019 | ||
BG | 19.09.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
Former [2019/50] | AL | 19.06.2019 | |
FI | 19.06.2019 | ||
HR | 19.06.2019 | ||
LT | 19.06.2019 | ||
LV | 19.06.2019 | ||
RS | 19.06.2019 | ||
NO | 19.09.2019 | ||
GR | 20.09.2019 | ||
Former [2019/47] | FI | 19.06.2019 | |
LT | 19.06.2019 | ||
NO | 19.09.2019 | Documents cited: | Search | [XA]GB998102 (BRITISH UNITED SHOE MACHINERY) [X] 1-4,6,7 * page 2, line 109 - page 3, line 58; figures 1,2 * [A] 5,8-11; | [XAI]US3776450 (CHRISTENSSON O) [X] 1-3,6-8 * abstract * * column 2, line 53 - column 3, line 62 * * column 4, line 44 - column 5, line 21 * [A] 4,5,9,10 [I] 11; | [AD]WO2005075314 (NUTRICIA NV [NL], et al) [AD] 1-11* paragraphs [0048] , [0053]; figures 2,3 *; | [XA]WO2013125941 (NUTRICIA NV [NL], et al) [X] 1-4,7 * abstract * * page 7, lines 8-29 * [A] 5,6,8-11 | Examination | US6058682 | WO2014062119 | by applicant | WO2005075314 | WO2014062119 | other | GB998102 | US3776450 | GB2267082 | US6058682 | WO2014062119 | Opposition | GB998102 | US3776450 | JPS61217350 | EP0397861 | GB2267082 | WO2005075314 | WO2014062119 |