blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3040744

EP3040744 - X-RAY BEAM INTENSITY MONITORING DEVICE AND X-RAY INSPECTION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.05.2021
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  29.05.2020
FormerGrant of patent is intended
Status updated on  03.01.2020
FormerExamination is in progress
Status updated on  02.07.2019
FormerGrant of patent is intended
Status updated on  26.02.2019
FormerExamination is in progress
Status updated on  28.12.2017
FormerRequest for examination was made
Status updated on  20.01.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Nuctech Company Limited
2nd Floor, Block A
TongFang Building
Shuangqinglu
Haidian District
Beijing 100084 / CN
For all designated states
Tsinghua University
Qinghua Yuan
Haidian District
Beijing 100084 / CN
[2020/27]
Former [2016/27]For all designated states
Nuctech Company Limited
2nd Fl. Block A Tongfang Building
Shuangqinglu
Hadian District
Beijing 100084 / CN
For all designated states
Tsinghua University
Qinghua Yuan
Haidian District
Beijing 100084 / CN
Inventor(s)01 / LI, Yuanjing
Nuctech Company Limited
2nd Floor, Block A
Tongfang Building
Shuangquinglu, Haidan District
Beijing 100084 / CN
02 / KANG, Kejun
Nuctech Company Limited
2nd Floor, Block A
Tongfang Building
Shuangquinglu, Haidan District
Beijing 100084 / CN
03 / LI, Shuwei
Nuctech Company Limited
2nd Floor, Block A
Tongfang Building
Shuangquinglu, Haidan District
Beijing 100084 / CN
04 / ZHANG, Qingjun
Nuctech Company Limited
2nd Floor, Block A
Tongfang Building
Shuangquinglu, Haidan District
Beijing 100084 / CN
05 / LI, Yulan
Nuctech Company Limited
2nd Floor, Block A
Tongfang Building
Shuangquinglu, Haidan District
Beijing 100084 / CN
06 / ZHAO, Ziran
Nuctech Company Limited
2nd Floor, Block A
Tongfang Building
Shuangquinglu, Haidan District
Beijing 100084 / CN
07 / LIU, Yinong
Nuctech Company Limited
2nd Floor, Block A
Tongfang Building
Shuangquinglu, Haidan District
Beijing 100084 / CN
08 / LIU, Yaohong
Nuctech Company Limited
2nd Floor, Block A
Tongfang Building
Shuangquinglu, Haidan District
Beijing 100084 / CN
09 / ZHU, Weibin
Nuctech Company Limited
2nd Floor, Block A
Tongfang Building
Shuangquinglu, Haidan District
Beijing 100084 / CN
10 / ZHAO, Xiaolin
Nuctech Company Limited
2nd Floor, Block A
Tongfang Building
Shuangquinglu, Haidan District
Beijing 100084 / CN
11 / HE, Huishao
Nuctech Company Limited
2nd Floor, Block A
Tongfang Building
Shuangquinglu, Haidan District
Beijing 100084 / CN
 [2020/06]
Former [2019/13]01 / LI, Yuanjing
2nd Floor, Block A
Tongfang Building
Shuangquinglu
Haidan District
Beijing 100084 / CN
02 / KANG, Kejun
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
Beijing 100084 / CN
03 / LI, Shuwei
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
Beijing 100084 / CN
04 / ZHANG, Qingjun
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
Beijing 100084 / CN
05 / LI, Yulan
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
Beijing 100084 / CN
06 / ZHAO, Ziran
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
Beijing 100084 / CN
07 / LIU, Yinong
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
Beijing 100084 / CN
08 / LIU, Yaohong
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
Beijing 100084 / CN
09 / ZHU, Weibin
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
Beijing 100084 / CN
10 / ZHAO, Xiaolin
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
Beijing 100084 / CN
11 / HE, Huishao
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
Beijing 100084 / CN
Former [2016/27]01 / LI, Yuanjing
2nd Floor, Block A, Tongfang Building
Shuangquinglu, Haidan District
100084 Beijing / CN
02 / KANG, Kejun
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
100084 Beijing / CN
03 / LI, Shuwei
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
100084 Beijing / CN
04 / ZHANG, Qingjun
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
100084 Beijing / CN
05 / LI, Yulan
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
100084 Beijing / CN
06 / ZHAO, Ziran
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
100084 Beijing / CN
07 / LIU, Yinong
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
100084 Beijing / CN
08 / LIU, Yaohong
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
100084 Beijing / CN
09 / ZHU, Weibin
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
100084 Beijing / CN
10 / ZHAO, Xiaolin
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
100084 Beijing / CN
11 / HE, Huishao
2nd Floor, Block A
Tongfang Building
Shuangqinglu
Haidian District
100084 Beijing / CN
Representative(s)Parker, Andrew James
Meissner Bolte Patentanwälte
Rechtsanwälte Partnerschaft mbB
Postfach 86 06 24
81633 München / DE
[2020/27]
Former [2016/27]Parker, Andrew James
Meissner Bolte & Partner GbR
Postfach 86 06 24
81633 München / DE
Application number, filing date15203078.930.12.2015
[2016/27]
Priority number, dateCN20141085136631.12.2014         Original published format: CN201410851366
CN20141085141631.12.2014         Original published format: CN201410851416
[2016/27]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3040744
Date:06.07.2016
Language:EN
[2016/27]
Type: B1 Patent specification 
No.:EP3040744
Date:01.07.2020
Language:EN
[2020/27]
Search report(s)(Supplementary) European search report - dispatched on:EP10.05.2016
ClassificationIPC:G01V5/00, G01T1/17
[2016/27]
CPC:
G01T1/17 (EP,BR,RU,US); G01T1/2006 (BR,US); G01T7/00 (BR,US);
G01T1/1603 (US); G01V5/22 (EP,BR,US); H04N5/57 (US);
H05G1/36 (US); H10K39/00 (US); G01T1/1606 (BR);
G06T1/0014 (US); G09G2320/0626 (US); G09G2320/0646 (US);
G21K1/02 (BR,US); H04N25/709 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/08]
Former [2016/27]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VORRICHTUNG ZUR ÜBERWACHUNG DER RÖNTGENSTRAHLINTENSITÄT UND RÖNTGENSTRAHLUNTERSUCHUNGSSYSTEM[2016/27]
English:X-RAY BEAM INTENSITY MONITORING DEVICE AND X-RAY INSPECTION SYSTEM[2016/27]
French:DISPOSITIF DE SURVEILLANCE DE L'INTENSITÉ D'UN FAISCEAU DE RAYONS X ET SYSTÈME D'INSPECTION PAR RAYONS X[2016/27]
Examination procedure30.12.2015Date on which the examining division has become responsible
05.01.2017Amendment by applicant (claims and/or description)
05.01.2017Examination requested  [2017/08]
22.12.2017Despatch of a communication from the examining division (Time limit: M04)
27.04.2018Reply to a communication from the examining division
27.02.2019Communication of intention to grant the patent
28.06.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
11.12.2019Cancellation of oral proceeding that was planned for 08.01.2020
08.01.2020Date of oral proceedings (cancelled)
13.01.2020Communication of intention to grant the patent
25.05.2020Fee for grant paid
25.05.2020Fee for publishing/printing paid
25.05.2020Receipt of the translation of the claim(s)
Opposition(s)06.04.2021No opposition filed within time limit [2021/23]
Fees paidRenewal fee
28.12.2017Renewal fee patent year 03
31.12.2018Renewal fee patent year 04
13.12.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.12.2015
AL01.07.2020
AT01.07.2020
CY01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
MK01.07.2020
MT01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
IE30.12.2020
LU30.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
[2022/33]
Former [2022/32]HU30.12.2015
AL01.07.2020
AT01.07.2020
CY01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
MK01.07.2020
MT01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
IE30.12.2020
LU30.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/27]HU30.12.2015
AL01.07.2020
AT01.07.2020
CY01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
MT01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
IE30.12.2020
LU30.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/52]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
IE30.12.2020
LU30.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/46]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
IE30.12.2020
LU30.12.2020
Former [2021/40]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/36]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/28]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SK01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/25]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/22]AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/20]AT01.07.2020
CZ01.07.2020
DK01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
RS01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/11]AT01.07.2020
CZ01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
RS01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/09]AT01.07.2020
CZ01.07.2020
ES01.07.2020
FI01.07.2020
LT01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
PT02.11.2020
Former [2021/08]ES01.07.2020
FI01.07.2020
LT01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
PT02.11.2020
Former [2021/07]FI01.07.2020
LT01.07.2020
BG01.10.2020
NO01.10.2020
Former [2021/01]BG01.10.2020
Documents cited:Search[XAYI]US4051377  (KEMNER RUDOLF, et al) [X] 1,7-9,11 * column 2, line 19 - line 64 * * column 3, line 10 - line 12 * * column 3, line 46 - line 50 * * column 1, line 4 - line 8; figure - * [A] 5 [Y] 4 [I] 2,3,6,10,12,13;
 [YA]US7091486  (MCCORD MARK A [US], et al) [Y] 4 * column 3, line 31 - line 37; figure - *[A] 5
Examination   - Anonymous, "adopt, v. : Oxford English Dictionary", (20190705), URL: https://www.oed.com/view/Entry/2665?redirectedFrom=adopt#eid, (20190705), XP055602693
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.