| EP3073784 - TERMINAL FOR A CELLULAR COMMUNICATIONS NETWORK AND METHOD OF OPERATING A TERMINAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.07.2021 Database last updated on 04.04.2026 | |
| Former | The patent has been granted Status updated on 14.08.2020 | ||
| Former | Grant of patent is intended Status updated on 06.05.2020 | ||
| Former | Examination is in progress Status updated on 15.04.2020 | ||
| Former | Grant of patent is intended Status updated on 16.01.2020 | ||
| Former | Examination is in progress Status updated on 14.12.2019 | ||
| Former | Grant of patent is intended Status updated on 05.08.2019 | ||
| Former | Examination is in progress Status updated on 18.05.2018 | ||
| Former | Request for examination was made Status updated on 31.03.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Alcatel Lucent Site Nokia Paris Saclay Route de Villejust 91620 Nozay / FR | [2018/16] |
| Former [2016/39] | For all designated states ALCATEL LUCENT 148/152 route de la Reine 92100 Boulogne-Billancourt / FR | Inventor(s) | 01 /
Zeller, Dietrich c/o Alcatel-Lucent Deutschland AG Lorenzstraße 10 70435 Stuttgart / DE | 02 /
Bakker, Hajo c/o Alcatel-Lucent Deutschland AG Lorenzstraße 10 70435 Stuttgart / DE | 03 /
Aziz, Danish c/o Alcatel-Lucent Deutschland AG Lorenzstraße 10 70435 Stuttgart / DE | 04 /
Dötsch, Uwe c/o Alcatel-Lucent Deutschland AG Lorenzstraße 10 70435 Stuttgart / DE | [2016/39] | Representative(s) | DREISS Patentanwälte PartG mbB Postfach 10 37 62 70032 Stuttgart / DE | [2016/39] | Application number, filing date | 15290086.6 | 27.03.2015 | [2016/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3073784 | Date: | 28.09.2016 | Language: | EN | [2016/39] | Type: | B1 Patent specification | No.: | EP3073784 | Date: | 16.09.2020 | Language: | EN | [2020/38] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.09.2015 | Classification | IPC: | H04W36/00 | [2016/39] | CPC: |
H04W36/0085 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/18] |
| Former [2016/39] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ENDGERÄT FÜR EIN ZELLULARES KOMMUNIKATIONSNETZWERK UND VERFAHREN ZUM BETRIEB EINES ENDGERÄTES | [2016/39] | English: | TERMINAL FOR A CELLULAR COMMUNICATIONS NETWORK AND METHOD OF OPERATING A TERMINAL | [2016/39] | French: | TERMINAL POUR UN RÉSEAU DE COMMUNICATION CELLULAIRE ET PROCÉDÉ DE FONCTIONNEMENT D'UN TERMINAL | [2016/39] | Examination procedure | 27.03.2015 | Date on which the examining division has become responsible | 18.12.2015 | Amendment by applicant (claims and/or description) | 28.03.2017 | Examination requested [2017/18] | 16.05.2018 | Despatch of a communication from the examining division (Time limit: M04) | 26.09.2018 | Reply to a communication from the examining division | 06.08.2019 | Communication of intention to grant the patent | 13.12.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 17.01.2020 | Communication of intention to grant the patent | 15.04.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 07.05.2020 | Communication of intention to grant the patent | 05.08.2020 | Fee for grant paid | 05.08.2020 | Fee for publishing/printing paid | 05.08.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 17.06.2021 | No opposition filed within time limit [2021/34] | Fees paid | Renewal fee | 24.03.2017 | Renewal fee patent year 03 | 23.03.2018 | Renewal fee patent year 04 | 13.03.2019 | Renewal fee patent year 05 | 12.03.2020 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.03.2015 | AL | 16.09.2020 | AT | 16.09.2020 | CY | 16.09.2020 | CZ | 16.09.2020 | DK | 16.09.2020 | EE | 16.09.2020 | ES | 16.09.2020 | FI | 16.09.2020 | HR | 16.09.2020 | IT | 16.09.2020 | LT | 16.09.2020 | LV | 16.09.2020 | MC | 16.09.2020 | MK | 16.09.2020 | MT | 16.09.2020 | NL | 16.09.2020 | PL | 16.09.2020 | RO | 16.09.2020 | RS | 16.09.2020 | SE | 16.09.2020 | SI | 16.09.2020 | SK | 16.09.2020 | SM | 16.09.2020 | TR | 16.09.2020 | BG | 16.12.2020 | NO | 16.12.2020 | GR | 17.12.2020 | IS | 16.01.2021 | PT | 18.01.2021 | IE | 27.03.2021 | LU | 27.03.2021 | BE | 31.03.2021 | CH | 31.03.2021 | LI | 31.03.2021 | [2026/04] |
| Former [2024/41] | HU | 27.03.2015 | |
| AL | 16.09.2020 | ||
| AT | 16.09.2020 | ||
| CY | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| DK | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| IT | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| MC | 16.09.2020 | ||
| MK | 16.09.2020 | ||
| MT | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| IE | 27.03.2021 | ||
| LU | 27.03.2021 | ||
| BE | 31.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2024/22] | HU | 27.03.2015 | |
| AL | 16.09.2020 | ||
| AT | 16.09.2020 | ||
| CY | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| DK | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| IT | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| MC | 16.09.2020 | ||
| MK | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| IE | 27.03.2021 | ||
| LU | 27.03.2021 | ||
| BE | 31.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2023/30] | HU | 27.03.2015 | |
| AL | 16.09.2020 | ||
| AT | 16.09.2020 | ||
| CY | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| DK | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| IT | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| MC | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| IE | 27.03.2021 | ||
| LU | 27.03.2021 | ||
| BE | 31.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2023/27] | HU | 27.03.2015 | |
| AL | 16.09.2020 | ||
| AT | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| DK | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| IT | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| MC | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| IE | 27.03.2021 | ||
| LU | 27.03.2021 | ||
| BE | 31.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2022/34] | AL | 16.09.2020 | |
| AT | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| DK | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| IT | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| MC | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| IE | 27.03.2021 | ||
| LU | 27.03.2021 | ||
| BE | 31.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2022/11] | AL | 16.09.2020 | |
| AT | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| DK | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| IT | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| MC | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| IE | 27.03.2021 | ||
| LU | 27.03.2021 | ||
| CH | 31.03.2021 | ||
| LI | 31.03.2021 | ||
| Former [2022/09] | AL | 16.09.2020 | |
| AT | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| DK | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| IT | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| MC | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| IE | 27.03.2021 | ||
| LU | 27.03.2021 | ||
| Former [2022/07] | AL | 16.09.2020 | |
| AT | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| DK | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| IT | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| MC | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| IE | 27.03.2021 | ||
| Former [2021/48] | AL | 16.09.2020 | |
| AT | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| DK | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| IT | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| MC | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| Former [2021/45] | AL | 16.09.2020 | |
| AT | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| DK | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| MC | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| Former [2021/37] | AL | 16.09.2020 | |
| AT | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| DK | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| Former [2021/36] | AL | 16.09.2020 | |
| AT | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SI | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| Former [2021/28] | AL | 16.09.2020 | |
| AT | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SK | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| Former [2021/25] | AL | 16.09.2020 | |
| AT | 16.09.2020 | ||
| CZ | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| ES | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| PL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| IS | 16.01.2021 | ||
| PT | 18.01.2021 | ||
| Former [2021/23] | AT | 16.09.2020 | |
| CZ | 16.09.2020 | ||
| EE | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| SM | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| PT | 18.01.2021 | ||
| Former [2021/22] | CZ | 16.09.2020 | |
| EE | 16.09.2020 | ||
| FI | 16.09.2020 | ||
| HR | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| RO | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| PT | 18.01.2021 | ||
| Former [2021/21] | FI | 16.09.2020 | |
| HR | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| PT | 18.01.2021 | ||
| Former [2021/20] | FI | 16.09.2020 | |
| HR | 16.09.2020 | ||
| LT | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| Former [2021/18] | FI | 16.09.2020 | |
| HR | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| NL | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| Former [2021/10] | FI | 16.09.2020 | |
| HR | 16.09.2020 | ||
| LV | 16.09.2020 | ||
| RS | 16.09.2020 | ||
| SE | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| Former [2021/09] | FI | 16.09.2020 | |
| SE | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| GR | 17.12.2020 | ||
| Former [2021/08] | FI | 16.09.2020 | |
| SE | 16.09.2020 | ||
| BG | 16.12.2020 | ||
| NO | 16.12.2020 | ||
| Former [2021/07] | FI | 16.09.2020 | |
| NO | 16.12.2020 | Documents cited: | Search | [I] US2003040311 (CHOI YOON SEOK et al.) [I] 1-10 * paragraph [0020] - paragraph [0025]; figure 1 * * paragraph [0047] - paragraph [0053]; figure 2 * * tables 1,2 * | [X] WO2008085838 (INTERDIGITAL TECH CORP et al.) [X] 11-17 * paragraph [0021] - paragraph [0040]; figure 3 * * paragraph [0042] - paragraph [0053]; figure 4 * | [T] "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Control (RRC); Protocol specification (Release 12)", 3GPP STANDARD; 3GPP TS 36.331, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. V12.4.1, 7 January 2015 (2015-01-07), pages 1 - 410, XP050927575 [T] 1-17 * page 100 - page 115 * | [T] "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Radio Resource Control (RRC); Protocol specification (Release 12)", 3GPP STANDARD; 3GPP TS 25.331, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. V12.5.0, 25 March 2015 (2015-03-25), pages 1 - 2225, XP050928109 [T] 1-17 * page 2055 - page 2098 * |