EP3230342 - METHOD OF PRODUCING A POLYETHERAMINE [Right-click to bookmark this link] | |||
Former [2017/42] | PROCESS FOR PREPARING A POLYETHERAMINE | ||
[2019/08] | Status | The patent has been granted Status updated on 31.05.2019 Database last updated on 11.05.2024 | |
Former | Grant of patent is intended Status updated on 05.02.2019 | ||
Former | Request for examination was made Status updated on 15.09.2017 | ||
Former | The international publication has been made Status updated on 02.06.2017 | Most recent event Tooltip | 08.03.2024 | New entry: Decision (+date) in appeal procedure | Applicant(s) | For all designated states BASF SE 67056 Ludwigshafen / DE | [2017/42] | Inventor(s) | 01 /
WIGBERS, Christof Wilhelm Lange Roetterstrasse 102 68167 Mannheim / DE | 02 /
MAEGERLEIN, Wolfgang Deidesheimer Strasse 10b 67117 Limburgerhof / DE | 03 /
KRUG, Thomas Am Kirschberg 5 67550 Worms / DE | 04 /
MELDER, Johann-Peter Fichtenstrasse 2 67459 Boehl-Iggelheim / DE | [2017/42] | Representative(s) | Schuck, Alexander Patentanwälte Isenbruck Bösl Hörschler PartG mbB Eastsite One Seckenheimer Landstraße 4 68163 Mannheim / DE | [N/P] |
Former [2019/27] | BASF IP Association BASF SE G-FLP-C006 67056 Ludwigshafen / DE | ||
Former [2017/42] | BASF IP Association BASF SE G-FLP-C006 67056 Ludwigshafen / DE | Application number, filing date | 15801870.5 | 01.12.2015 | [2017/42] | WO2015EP78126 | Priority number, date | EP20140197758 | 12.12.2014 Original published format: EP 14197758 | [2017/42] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2016091643 | Date: | 16.06.2016 | Language: | DE | [2016/24] | Type: | A1 Application with search report | No.: | EP3230342 | Date: | 18.10.2017 | Language: | DE | The application published by WIPO in one of the EPO official languages on 16.06.2016 takes the place of the publication of the European patent application. | [2017/42] | Type: | B1 Patent specification | No.: | EP3230342 | Date: | 03.07.2019 | Language: | DE | [2019/27] | Search report(s) | International search report - published on: | EP | 16.06.2016 | Classification | IPC: | C08G65/325 | [2019/08] | CPC: |
C08G65/2621 (EP,CN,US);
C07C213/02 (US);
B01J21/04 (US);
B01J21/066 (US);
B01J23/04 (US);
B01J23/14 (US);
B01J23/28 (US);
B01J23/72 (US);
B01J23/75 (US);
B01J23/755 (US);
C08G65/2648 (EP,CN,US);
C08G65/2696 (EP,CN,US);
Y02P20/582 (EP,US)
(-)
|
Former IPC [2017/42] | C08G65/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES POLYETHERAMINS | [2017/42] | English: | METHOD OF PRODUCING A POLYETHERAMINE | [2019/08] | French: | PROCÉDÉ DE PRÉPARATION D'UNE POLYÉTHERAMINE | [2017/42] |
Former [2017/42] | PROCESS FOR PREPARING A POLYETHERAMINE | Entry into regional phase | 12.07.2017 | National basic fee paid | 12.07.2017 | Designation fee(s) paid | 12.07.2017 | Examination fee paid | Examination procedure | 07.03.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 02.06.2017 | Date on which the examining division has become responsible | 12.07.2017 | Examination requested [2017/42] | 06.02.2019 | Communication of intention to grant the patent | 24.05.2019 | Fee for grant paid | 24.05.2019 | Fee for publishing/printing paid | 24.05.2019 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
26.03.2020
30.03.2020
ADMISSIBLE Clariant Produkte (Deutschland) GmbH Brüningstrasse 50 65929 Frankfurt am Main / DE Opponent's representative Clariant Produkte (Deutschland) GmbH Patent Management Industriepark Höchst, G 860 65926 Frankfurt am Main / DE | [N/P] |
Former [2024/08] | |||
Opponent(s) | 01
26.03.2020
30.03.2020
ADMISSIBLE Clariant Produkte (Deutschland) GmbH Brüningstrasse 50 65929 Frankfurt am Main / DE Opponent's representative Clariant Produkte (Deutschland) GmbH Patent Management Industriepark Höchst, G 860 DE-65926 Frankfurt am Main / DE | ||
Former [2020/18] | |||
Opponent(s) | 01
26.03.2020
ADMISSIBLE Clariant Produkte (Deutschland) GmbH Brüningstrasse 50 65929 Frankfurt am Main / DE Opponent's representative Mikulecky, Klaus Clariant Produkte (Deutschland) GmbH Patent & License Management Chemicals Industriepark Höchst, G 860 65926 Frankfurt am Main / DE | 19.06.2020 | Invitation to proprietor to file observations on the notice of opposition | 16.10.2020 | Reply of patent proprietor to notice(s) of opposition | 04.02.2022 | Despatch of interlocutory decision in opposition | Appeal following opposition | 06.04.2022 | Appeal received No. T0872/22 | 06.04.2022 | Payment of appeal fee | 31.05.2022 | Statement of grounds filed | 06.03.2024 | Result of appeal procedure: maintenance in amended form | 27.03.2024 | Despatch of the decision of the Board of Appeal | 01.04.2022 | Appeal received No. T0872/22 | 04.04.2022 | Payment of appeal fee | 31.05.2022 | Statement of grounds filed | 06.03.2024 | Result of appeal procedure: maintenance in amended form | 27.03.2024 | Despatch of the decision of the Board of Appeal | 06.03.2024 | Date of oral proceedings | Fees paid | Renewal fee | 02.01.2018 | Renewal fee patent year 03 | 02.01.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 03.07.2019 | CY | 03.07.2019 | CZ | 03.07.2019 | DK | 03.07.2019 | EE | 03.07.2019 | FI | 03.07.2019 | HR | 03.07.2019 | LT | 03.07.2019 | LV | 03.07.2019 | MC | 03.07.2019 | MK | 03.07.2019 | MT | 03.07.2019 | NL | 03.07.2019 | PL | 03.07.2019 | RO | 03.07.2019 | RS | 03.07.2019 | SE | 03.07.2019 | SI | 03.07.2019 | SK | 03.07.2019 | SM | 03.07.2019 | TR | 03.07.2019 | BG | 03.10.2019 | NO | 03.10.2019 | GR | 04.10.2019 | IS | 03.11.2019 | PT | 04.11.2019 | IE | 01.12.2019 | LU | 01.12.2019 | BE | 31.12.2019 | CH | 31.12.2019 | LI | 31.12.2019 | AT | 01.12.2020 | [2022/31] |
Former [2022/21] | AL | 03.07.2019 | |
CY | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
MT | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
IE | 01.12.2019 | ||
LU | 01.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
AT | 01.12.2020 | ||
Former [2021/34] | AL | 03.07.2019 | |
CY | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
MT | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
IE | 01.12.2019 | ||
LU | 01.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2021/26] | AL | 03.07.2019 | |
CY | 03.07.2019 | ||
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
IE | 01.12.2019 | ||
LU | 01.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2020/51] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
IE | 01.12.2019 | ||
LU | 01.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2020/46] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
IE | 01.12.2019 | ||
LU | 01.12.2019 | ||
Former [2020/39] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
MC | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/37] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
SI | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/36] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/27] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
SK | 03.07.2019 | ||
SM | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
PT | 04.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
SK | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
PT | 04.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
PT | 04.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
PL | 03.07.2019 | ||
RO | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/22] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
DK | 03.07.2019 | ||
EE | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/17] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
TR | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/15] | AL | 03.07.2019 | |
CZ | 03.07.2019 | ||
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/12] | CZ | 03.07.2019 | |
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
IS | 03.11.2019 | ||
PT | 04.11.2019 | ||
Former [2020/11] | CZ | 03.07.2019 | |
FI | 03.07.2019 | ||
HR | 03.07.2019 | ||
LT | 03.07.2019 | ||
LV | 03.07.2019 | ||
NL | 03.07.2019 | ||
RS | 03.07.2019 | ||
SE | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
GR | 04.10.2019 | ||
PT | 04.11.2019 | ||
Former [2020/10] | CZ | 03.07.2019 | |
FI | 03.07.2019 | ||
LT | 03.07.2019 | ||
NL | 03.07.2019 | ||
SE | 03.07.2019 | ||
BG | 03.10.2019 | ||
NO | 03.10.2019 | ||
PT | 04.11.2019 | ||
Former [2020/09] | CZ | 03.07.2019 | |
FI | 03.07.2019 | ||
LT | 03.07.2019 | ||
NL | 03.07.2019 | ||
NO | 03.10.2019 | ||
Former [2020/08] | LT | 03.07.2019 | |
NL | 03.07.2019 | ||
NO | 03.10.2019 | ||
Former [2020/07] | NL | 03.07.2019 | Cited in | International search | [XDI]EP0696572 (BASF AG [DE]) [XD] 1-8,17-20 * page 11; example 9 * [I] 1-26; | [AD]EP1028138 (BASF CORP [US]) [AD] 1-26* column 1, line 14 * | by applicant | US3580952 | JPS4914158B | JPS4914159B | EP0636409 | EP0696572 | EP0742045 | EP1028138 | WO2007096317 | WO2009092724 | WO2011067199 | WO2011087793 | WO2014009292 | - "Fixed-Bed Reactors", Ullmann's Encyclopedia of Industrial Chemistry. 5TH ED., vol. 4, pages 199 - 238 | WO2014EP59181 | WO2014EP59145 | Opposition | US3000963 | US4137398 | CA1264767 | US4990576 | US4992590 | EP0428802 | US5103062 | EP0584967 | WO9730103 | WO03051508 |