EP3269108 - METHOD FOR SECURE TRANSMISSION OF A VIRTUAL KEY AND METHOD FOR AUTHENTICATION OF A MOBILE TERMINAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.04.2022 Database last updated on 17.05.2024 | |
Former | The patent has been granted Status updated on 23.04.2021 | ||
Former | Grant of patent is intended Status updated on 10.02.2021 | ||
Former | Examination is in progress Status updated on 26.03.2019 | ||
Former | Request for examination was made Status updated on 15.12.2017 | ||
Former | The international publication has been made Status updated on 31.08.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Valeo Comfort and Driving Assistance 76, rue Auguste Perret ZI Europarc 94046 Créteil Cedex / FR | [2018/03] | Inventor(s) | 01 /
MENARD, Eric c/o Valeo Comfort and Driving Assistance 76 Rue Auguste Perret ZI Europarc 94046 Créteil Cedex / FR | 02 /
CHALOCHET, Aymeric c/o Valeo Comfort and Driving Assistance 76 Rue Auguste Perret ZI Europarc 94046 Créteil Cedex / FR | 03 /
MASSON, Fabienne c/o Valeo Comfort and Driving Assistance 76 Rue Auguste Perret ZI Europarc 94046 Créteil Cedex / FR | [2018/03] | Representative(s) | Delplanque, Arnaud Valeo Comfort and Driving Assistance 6 rue Daniel Costantini 94000 Créteil / FR | [N/P] |
Former [2018/03] | Delplanque, Arnaud VALEO Comfort and Driving Assistance 76, rue Auguste Perret Z.I. Europarc 94046 Créteil Cedex / FR | Application number, filing date | 15823363.5 | 22.12.2015 | [2018/03] | WO2015FR53720 | Priority number, date | FR20140003003 | 23.12.2014 Original published format: FR 1403003 | [2018/03] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2016102888 | Date: | 30.06.2016 | Language: | FR | [2016/26] | Type: | A1 Application with search report | No.: | EP3269108 | Date: | 17.01.2018 | Language: | FR | The application published by WIPO in one of the EPO official languages on 30.06.2016 takes the place of the publication of the European patent application. | [2018/03] | Type: | B1 Patent specification | No.: | EP3269108 | Date: | 26.05.2021 | Language: | FR | [2021/21] | Search report(s) | International search report - published on: | EP | 30.06.2016 | Classification | IPC: | H04L29/06 | [2018/03] | CPC: |
G07C9/00309 (EP,CN,US);
B60R25/01 (US);
B60R25/209 (US);
B60R25/24 (EP,US);
B60R25/241 (US);
G07C9/00857 (EP,CN,US);
H04L9/0894 (US);
H04W12/041 (EP,US);
H04W12/069 (EP,US);
B60R2325/108 (EP,US);
B60R2325/205 (EP,US);
E05B81/54 (US);
G06F8/60 (US);
G07C2009/00412 (US);
G07C2009/0042 (US);
G07C2009/00428 (EP,CN,US);
G07C2009/00865 (EP,CN,US);
H04L2209/16 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/03] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR GESICHERTEN ÜBERTRAGUNG EINES VIRTUELLEN SCHLÜSSELS UND VERFAHREN ZUR AUTHENTIFIZIERUNG EINES MOBILEN ENDGERÄTS | [2018/03] | English: | METHOD FOR SECURE TRANSMISSION OF A VIRTUAL KEY AND METHOD FOR AUTHENTICATION OF A MOBILE TERMINAL | [2018/03] | French: | PROCÉDÉ DE TRANSMISSION SÉCURISÉE D'UNE CLÉ VIRTUELLE ET MÉTHODE D'AUTHENTIFICATION D'UN TERMINAL MOBILE | [2018/03] | Entry into regional phase | 08.11.2017 | National basic fee paid | 08.11.2017 | Designation fee(s) paid | 08.11.2017 | Examination fee paid | Examination procedure | deleted | Deletion: Application deemed to be withdrawn, date of legal effect [2018/03] | 29.08.2017 | Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time [2018/03] | 08.11.2017 | Examination requested [2018/03] | 08.11.2017 | Date on which the examining division has become responsible | 21.06.2018 | Amendment by applicant (claims and/or description) | 29.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 30.07.2019 | Reply to a communication from the examining division | 09.04.2020 | Despatch of a communication from the examining division (Time limit: M06) | 12.10.2020 | Reply to a communication from the examining division | 11.02.2021 | Communication of intention to grant the patent | 19.04.2021 | Fee for grant paid | 19.04.2021 | Fee for publishing/printing paid | 19.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 01.03.2022 | No opposition filed within time limit [2022/18] | Request for further processing for: | 08.11.2017 | Request for further processing filed | 08.11.2017 | Full payment received (date of receipt of payment) Request granted | 14.12.2017 | Decision despatched | The application is deemed to be withdrawn due to non-payment of the filing fee | 08.11.2017 | Request for further processing filed | 08.11.2017 | Full payment received (date of receipt of payment) Request granted | 14.12.2017 | Decision despatched | The application is deemed to be withdrawn due to non-payment of the examination fee | 08.11.2017 | Request for further processing filed | 08.11.2017 | Full payment received (date of receipt of payment) Request granted | 14.12.2017 | Decision despatched | The application is deemed to be withdrawn due to non-payment of designation fees TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL | 08.11.2017 | Request for further processing filed | 08.11.2017 | Full payment received (date of receipt of payment) Request granted | 14.12.2017 | Decision despatched | Fees paid | Renewal fee | 29.11.2017 | Renewal fee patent year 03 | 29.11.2018 | Renewal fee patent year 04 | 29.11.2019 | Renewal fee patent year 05 | 26.11.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.12.2015 | AL | 26.05.2021 | AT | 26.05.2021 | CY | 26.05.2021 | CZ | 26.05.2021 | DK | 26.05.2021 | EE | 26.05.2021 | ES | 26.05.2021 | FI | 26.05.2021 | HR | 26.05.2021 | IT | 26.05.2021 | LT | 26.05.2021 | LV | 26.05.2021 | MC | 26.05.2021 | MK | 26.05.2021 | NL | 26.05.2021 | PL | 26.05.2021 | RO | 26.05.2021 | RS | 26.05.2021 | SE | 26.05.2021 | SI | 26.05.2021 | SK | 26.05.2021 | SM | 26.05.2021 | BG | 26.08.2021 | NO | 26.08.2021 | GR | 27.08.2021 | IS | 26.09.2021 | PT | 27.09.2021 | IE | 22.12.2021 | LU | 22.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | [2024/22] |
Former [2023/30] | HU | 22.12.2015 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/29] | HU | 22.12.2015 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
BE | 31.12.2021 | ||
Former [2022/48] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 22.12.2021 | ||
LU | 22.12.2021 | ||
Former [2022/46] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
LU | 22.12.2021 | ||
Former [2022/36] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/33] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/29] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/26] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/23] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/10] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/08] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/07] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/04] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/52] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/51] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/50] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
Former [2021/49] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
Former [2021/47] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | ||
BG | 26.08.2021 | ||
Former [2021/46] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | Cited in | International search | [XI]EP2743868 (SEVEN PRINCIPLES AG [DE]) [X] 1,2,6,9,11 * paragraph [0006] * * paragraph [0024] * * paragraph [0030] * * paragraph [0033] * * paragraph [0043] * * paragraph [0046] * * paragraph [0037] * * paragraph [0050] * [I] 3-5,7,8,10; | [A] - IFTODE L ET AL, "Smart phone: an embedded system for universal interactions", DISTRIBUTED COMPUTING SYSTEMS, 2004. PROCEEDINGS. FTDCS 2004. 10TH IEE E INTERNATIONAL WORKSHOP ON FUTURE TRENDS OF SUZHOU, CHINA 26-28 MAY 2004, PISCATAWAY, NJ, USA,IEEE, (20040526), doi:10.1109/FTDCS.2004.1316598, ISBN 978-0-7695-2118-3, pages 88 - 94, XP010711024 [A] 1-11 * 3. Smart Phone Interaction Models * * page 2, column 2, line 16 - line 31 * * figure 7 * * page 4, column 2, line 33 - page 5, column 1, line 14 * DOI: http://dx.doi.org/10.1109/FTDCS.2004.1316598 | [A] - ALLI G ET AL, "Green Move: Towards next generation sustainable smartphone-based vehicle sharing", SUSTAINABLE INTERNET AND ICT FOR SUSTAINABILITY (SUSTAINIT), 2012, IEEE, (20121004), ISBN 978-1-4673-2031-3, pages 1 - 5, XP032282698 [A] 1-11 * page 3, column 1, line 14 - line 42 * * B. User's Smartphone App; page 4, column 1 * | by applicant | - DE BRECHT WYSEUR, WHITE-BOX CRYPTOGRAPHY: HIDING KEYS IN SOFTWARE, URL: http.llwww.whiteboxcrypto.comlfilesl2Ol2 misc.pdf |