EP3229402 - METHOD AND DEVICE FOR MANAGING A DATA TRANSMISSION CHANNEL [Right-click to bookmark this link] | |||
Former [2017/41] | METHOD AND DEVICE FOR MANAGING DATA TRANSMISSION CHANNEL | ||
[2021/37] | Status | No opposition filed within time limit Status updated on 30.12.2022 Database last updated on 17.05.2024 | |
Former | The patent has been granted Status updated on 21.01.2022 | ||
Former | Grant of patent is intended Status updated on 28.09.2021 | ||
Former | Examination is in progress Status updated on 15.05.2019 | ||
Former | Request for examination was made Status updated on 08.09.2017 | ||
Former | The international publication has been made Status updated on 07.07.2017 | Most recent event Tooltip | 19.04.2024 | Lapse of the patent in a contracting state New state(s): CY | published on 22.05.2024 [2024/21] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2022/08] |
Former [2017/41] | For all designated states Huawei Technologies Co. Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
LIU, Kai Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2017/41] | Representative(s) | Pfenning, Meinig & Partner mbB Patent- und Rechtsanwälte Theresienhöhe 11a 80339 München / DE | [2017/41] | Application number, filing date | 15875047.1 | 03.12.2015 | [2017/41] | WO2015CN96302 | Priority number, date | CN201410842925 | 30.12.2014 Original published format: CN201410842925 | [2017/41] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016107369 | Date: | 07.07.2016 | Language: | ZH | [2016/27] | Type: | A1 Application with search report | No.: | EP3229402 | Date: | 11.10.2017 | Language: | EN | [2017/41] | Type: | B1 Patent specification | No.: | EP3229402 | Date: | 23.02.2022 | Language: | EN | [2022/08] | Search report(s) | International search report - published on: | CN | 07.07.2016 | (Supplementary) European search report - dispatched on: | EP | 22.11.2017 | Classification | IPC: | H04L12/24, H04L12/26 | [2017/51] | CPC: |
H04L41/0663 (EP,US);
H04L41/0695 (KR);
H04L45/50 (US);
H04L41/0668 (KR);
H04L41/0806 (US);
H04L41/085 (US);
H04L41/0896 (US);
H04L41/5022 (EP,US);
H04L41/5025 (EP,US);
H04L43/0823 (KR);
H04L43/0847 (EP,US);
H04L43/0852 (KR);
H04L43/087 (EP,US);
H04L43/10 (EP,US);
H04L43/16 (EP,KR,US);
H04W16/18 (US)
(-)
|
Former IPC [2017/41] | H04L12/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/41] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR VERWALTUNG EINES DATENÜBERTRAGUNGSKANALS | [2021/37] | English: | METHOD AND DEVICE FOR MANAGING A DATA TRANSMISSION CHANNEL | [2021/37] | French: | PROCÉDÉ ET DISPOSITIF DE GESTION DE CANAL DE TRANSMISSION DE DONNÉES | [2017/41] |
Former [2017/41] | VERFAHREN UND VORRICHTUNG ZUR VERWALTUNG EINES VON DATENÜBERTRAGUNGSKANALS | ||
Former [2017/41] | METHOD AND DEVICE FOR MANAGING DATA TRANSMISSION CHANNEL | Entry into regional phase | 07.07.2017 | Translation filed | 07.07.2017 | National basic fee paid | 07.07.2017 | Search fee paid | 07.07.2017 | Designation fee(s) paid | 07.07.2017 | Examination fee paid | Examination procedure | 07.07.2017 | Examination requested [2017/41] | 07.07.2017 | Date on which the examining division has become responsible | 18.05.2018 | Amendment by applicant (claims and/or description) | 20.05.2019 | Despatch of a communication from the examining division (Time limit: M04) | 19.09.2019 | Reply to a communication from the examining division | 24.02.2020 | Despatch of a communication from the examining division (Time limit: M06) | 24.08.2020 | Reply to a communication from the examining division | 03.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 28.04.2021 | Reply to a communication from the examining division | 29.09.2021 | Communication of intention to grant the patent | 19.12.2021 | Fee for grant paid | 19.12.2021 | Fee for publishing/printing paid | 11.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 24.11.2022 | No opposition filed within time limit [2023/05] | Fees paid | Renewal fee | 29.12.2017 | Renewal fee patent year 03 | 31.12.2018 | Renewal fee patent year 04 | 20.12.2019 | Renewal fee patent year 05 | 23.12.2020 | Renewal fee patent year 06 | 27.12.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.12.2015 | AL | 23.02.2022 | AT | 23.02.2022 | CY | 23.02.2022 | CZ | 23.02.2022 | DK | 23.02.2022 | EE | 23.02.2022 | ES | 23.02.2022 | FI | 23.02.2022 | HR | 23.02.2022 | IT | 23.02.2022 | LT | 23.02.2022 | LV | 23.02.2022 | NL | 23.02.2022 | PL | 23.02.2022 | RO | 23.02.2022 | RS | 23.02.2022 | SE | 23.02.2022 | SI | 23.02.2022 | SK | 23.02.2022 | SM | 23.02.2022 | BG | 23.05.2022 | NO | 23.05.2022 | GR | 24.05.2022 | IS | 23.06.2022 | PT | 23.06.2022 | [2024/21] |
Former [2024/18] | HU | 03.12.2015 | |
AL | 23.02.2022 | ||
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/35] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/10] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/01] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/49] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/48] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/47] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/46] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/42] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/39] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/36] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/35] | ES | 23.02.2022 | |
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
NL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/34] | ES | 23.02.2022 | |
LT | 23.02.2022 | ||
NL | 23.02.2022 | ||
NO | 23.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/33] | LT | 23.02.2022 | |
NO | 23.05.2022 | Documents cited: | Search | [A]WO2009056972 (ERICSSON TELEFON AB L M [SE], et al) [A] 1-15* the whole document *; | [Y]EP2254276 (ALCATEL LUCENT [FR]) [Y] 1-15 * abstract,;; figures 6,7 * * paragraph [0001] - paragraph [0004] * * paragraph [0025] - paragraph [0033] * * paragraph [0052] - paragraph [0088] *; | [Y]US2013091408 (O'CONNELL ANNE G [IE], et al) [Y] 1-15 * paragraph [0001] - paragraph [0017]; figures 1,3,7 * * paragraph [0032] - paragraph [0036] * | International search | [A]CN101227397 (HUAWEI TECH CO LTD [CN]) [A] 1-8* , the whole document *; | [A]CN102142948 (HUAWEI TECH CO LTD) [A] 1-8 * , the whole document *; | [X]CN102407868 (NANJING STATE POWER SOUTH RAIL TRANSIT ENGINEERING CO LTD) [X] 1-8 * , claim 1 *; | [PX]CN104579770 (HUAWEI TECH CO LTD) [PX] 1-8 * claims 1-8 * |