blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3296755

EP3296755 - DETERMINATION OF LOAD SIZES IN CURRENT OPERATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.01.2023
Database last updated on 17.05.2024
FormerThe patent has been granted
Status updated on  18.02.2022
FormerGrant of patent is intended
Status updated on  21.11.2021
FormerRequest for examination was made
Status updated on  21.09.2018
FormerThe application has been published
Status updated on  16.02.2018
Most recent event   Tooltip19.04.2024Lapse of the patent in a contracting state
New state(s): CY
published on 22.05.2024 [2024/21]
Applicant(s)For all designated states
Siemens Aktiengesellschaft
Werner-von-Siemens-Straße 1
80333 München / DE
[2018/12]
Inventor(s)01 / Nolte, Uwe
Kaltenbornstraße 40 B
30890 Barsinghausen / DE
02 / Braatz, Uwe
Martinihof 9
30455 Hannover / DE
03 / Piatkowski, Martin
Heinrich-Heine-Str. 25
38239 Salzgitter / DE
 [2018/12]
Application number, filing date16188732.814.09.2016
[2018/12]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3296755
Date:21.03.2018
Language:DE
[2018/12]
Type: B1 Patent specification 
No.:EP3296755
Date:23.03.2022
Language:DE
[2022/12]
Search report(s)(Supplementary) European search report - dispatched on:EP11.05.2017
ClassificationIPC:G01R31/34, G05B11/01, H02P23/14
[2021/47]
CPC:
G05B11/01 (EP); H02P23/14 (EP)
Former IPC [2018/12]G01R31/34
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/43]
Former [2018/12]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ERMITTLUNG VON LASTGRÖSSEN IM LAUFENDEN BETRIEB[2018/12]
English:DETERMINATION OF LOAD SIZES IN CURRENT OPERATION[2018/12]
French:DÉTERMINATION D'AMPLEURS DE CHARGE EN COURS DE FONCTIONNEMENT[2018/12]
Examination procedure14.09.2016Date on which the examining division has become responsible
18.09.2018Examination requested  [2018/43]
19.09.2018Amendment by applicant (claims and/or description)
22.11.2021Communication of intention to grant the patent
09.02.2022Receipt of the translation of the claim(s)
10.02.2022Fee for grant paid
10.02.2022Fee for publishing/printing paid
Opposition(s)02.01.2023No opposition filed within time limit [2023/09]
Fees paidRenewal fee
20.09.2018Renewal fee patent year 03
19.09.2019Renewal fee patent year 04
18.09.2020Renewal fee patent year 05
17.09.2021Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.09.2016
AL23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
AT14.09.2022
GB14.09.2022
IE14.09.2022
LU14.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
[2024/21]
Former [2024/18]HU14.09.2016
AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
AT14.09.2022
GB14.09.2022
IE14.09.2022
LU14.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2024/09]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
AT14.09.2022
GB14.09.2022
IE14.09.2022
LU14.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/47]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB14.09.2022
IE14.09.2022
LU14.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/42]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
IE14.09.2022
LU14.09.2022
BE30.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/35]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
IE14.09.2022
LU14.09.2022
CH30.09.2022
FR30.09.2022
LI30.09.2022
Former [2023/33]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
IE14.09.2022
LU14.09.2022
Former [2023/30]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
LU14.09.2022
Former [2023/25]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/22]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/07]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/01]AL23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/51]CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/50]CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/49]CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/48]CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/47]ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/44]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/39]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/36]HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/35]HR23.03.2022
LT23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
Former [2022/33]LT23.03.2022
NO23.06.2022
Documents cited:Search[X]JPH05332875  (N F KEISOKU SYST KK, et al) [X] 1-19 * abstract * * paragraph [[0009]] - paragraph [[0012]] * * paragraph [[0026]] - paragraph [[0034]]; figures 1-22 *;
 [X]US2001037691  (HIGASHIJIMA TETSUJI [JP]) [X] 1-19 * abstract * * paragraph [[0029]] - paragraph [[0075]]; figures 1-12 *;
 [X]US5428285  (KOYAMA MASATO [JP], et al) [X] 1-19 * abstract * * column 13, line 40 - column 17, line 58; figures 10-14 *;
 [X]US2010226157  (OHNISHI TOKUO [JP], et al) [X] 1-19 * abstract * * paragraph [[0199]] - paragraph [[0205]]; figures 22, 23 *;
 [X]CN103048620  (UNIV SHANGHAI JIAOTONG) [X] 1-19 * the whole document *;
 [A]DE102011121839  (BOSCH GMBH ROBERT [DE]) [A] 1-19 * abstract * * paragraph [[0022]] - paragraph [[0023]] * * paragraph [[0039]] - paragraph [[0046]]; figure 1 *;
 [AD]WO2015110341  (SIEMENS AG [DE]) [AD] 1-19 * abstract *;
 [A]DE102010064217  (SIEMENS AG [DE]) [A] 1-19 * abstract * * paragraph [[0048]] - paragraph [[0091]]; figure 1 *;
 [A]DE102006043896  (SIEMENS AG [DE]) [A] 1-19 * abstract *;
 [A]DE102015200609  (GEZE GMBH [DE]) [A] 1-19 * abstract *
 [X]  - IOHIMOVICH ANASTASIA D ET AL, "The development of the direct electric drive system of a radar station antenna", 2013 14TH INTERNATIONAL CONFERENCE OF YOUNG SPECIALISTS ON MICRO/NANOTECHNOLOGIES AND ELECTRON DEVICES, IEEE, doi:10.1109/EDM.2013.6642000, ISSN 2325-4173, ISBN 978-1-4799-0761-8, (20130701), pages 300 - 304, (20131020), XP032513633 [X] 1-19 * abstract * * page 301, column l, paragraph 2nd - page 302, column r; figures 2,3 *

DOI:   http://dx.doi.org/10.1109/EDM.2013.6642000
 [X]  - BRAD P ET AL, "ANGULAR ACCELERATION MEASUREMENT WITH EDDY-CURRENT SENSOR", ELECTROMOTION 2001,, (20010619), pages 169 - 172, XP008036167 [X] 1-19 * the whole document *
by applicantDE102014201399
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.