EP3289832 - UPGRADING A LIGHT SOURCE [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 24.01.2020 Database last updated on 11.05.2024 | |
Former | Grant of patent is intended Status updated on 19.09.2019 | ||
Former | Examination is in progress Status updated on 24.04.2019 | ||
Former | Request for examination was made Status updated on 02.02.2018 | ||
Former | The international publication has been made Status updated on 04.11.2016 | Most recent event Tooltip | 28.10.2022 | New entry: Date of receipt of statement of grounds of an appeal | Applicant(s) | For all designated states Signify Holding B.V. High Tech Campus 48 5656 AE Eindhoven / NL | [2019/11] |
Former [2018/50] | For all designated states Philips Lighting Holding B.V. High Tech Campus 48 5656 AE Eindhoven / NL | ||
Former [2018/10] | For all designated states Philips Lighting Holding B.V. High Tech Campus 45 5656 AE Eindhoven / NL | Inventor(s) | 01 /
DEIXLER, Peter High Tech Campus 5 5656 AE Eindhoven / NL | 02 /
JACOBS, Jean-Paul High Tech Campus 5 5656 AE Eindhoven / NL | [2018/10] | Representative(s) | Verweij, Petronella Daniëlle Signify Netherlands B.V. Intellectual Property High Tech Campus 7 5656 AE Eindhoven / NL | [2020/09] |
Former [2018/10] | Verweij, Petronella Daniëlle Philips Lighting B.V. Philips Lighting Intellectual Property High Tech Campus 45 5656 AE Eindhoven / NL | Application number, filing date | 16717930.8 | 21.04.2016 | [2018/10] | WO2016EP58892 | Priority number, date | EP20150165857 | 30.04.2015 Original published format: EP 15165857 | [2018/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016173921 | Date: | 03.11.2016 | Language: | EN | [2016/44] | Type: | A1 Application with search report | No.: | EP3289832 | Date: | 07.03.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.11.2016 takes the place of the publication of the European patent application. | [2018/10] | Type: | B1 Patent specification | No.: | EP3289832 | Date: | 26.02.2020 | Language: | EN | [2020/09] | Search report(s) | International search report - published on: | EP | 03.11.2016 | Classification | IPC: | H05B37/02, H04L12/28 | [2018/10] | CPC: |
H04L12/2814 (EP,CN,US);
H05B47/18 (EP,CN,US);
G06F8/65 (US);
H04L12/2816 (EP,CN);
H05B47/16 (EP,CN,US);
H05B47/175 (US);
H05B47/19 (EP,CN,US);
H04L2012/2841 (EP,CN);
H04W4/80 (US);
Y02B20/40 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ERWEITERUNG EINER LICHTQUELLENSTEUERUNG | [2019/41] | English: | UPGRADING A LIGHT SOURCE | [2018/10] | French: | AMÉLIORATION D'UN CONTROLEUR DE SOURCE LUMINEUSE | [2019/41] |
Former [2018/10] | VERBESSERUNG EINER LICHTQUELLE | ||
Former [2018/10] | MISE À NIVEAU D'UNE SOURCE LUMINEUSE | Entry into regional phase | 30.11.2017 | National basic fee paid | 30.11.2017 | Designation fee(s) paid | 30.11.2017 | Examination fee paid | Examination procedure | 28.09.2017 | Amendment by applicant (claims and/or description) | 28.09.2017 | Date on which the examining division has become responsible | 30.11.2017 | Examination requested [2018/10] | 26.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 02.09.2019 | Reply to a communication from the examining division | 20.09.2019 | Communication of intention to grant the patent | 17.01.2020 | Fee for grant paid | 17.01.2020 | Fee for publishing/printing paid | 17.01.2020 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
26.11.2020
30.11.2020
ADMISSIBLE Schöpf, Patrick Daiserstr. 27 81371 München / DE Opponent's representative Samson & Partner Patentanwälte mbB Widenmayerstraße 6 80538 München / DE | [2021/01] | 10.12.2020 | Invitation to proprietor to file observations on the notice of opposition | 09.04.2021 | Reply of patent proprietor to notice(s) of opposition | 13.07.2021 | Cancellation of oral proceeding that was planned for 13.01.2022 | 13.01.2022 | Date of oral proceedings | 03.02.2022 | Date of oral proceedings | 22.06.2022 | Despatch of interlocutory decision in opposition | 22.06.2022 | Despatch of minutes of oral proceedings | Appeal following opposition | 31.08.2022 | Appeal received No. T2060/22 | 27.10.2022 | Statement of grounds filed | Fees paid | Renewal fee | 30.04.2018 | Renewal fee patent year 03 | 30.04.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.04.2016 | AL | 26.02.2020 | CY | 26.02.2020 | CZ | 26.02.2020 | EE | 26.02.2020 | HR | 26.02.2020 | LT | 26.02.2020 | LV | 26.02.2020 | MC | 26.02.2020 | MK | 26.02.2020 | MT | 26.02.2020 | RO | 26.02.2020 | RS | 26.02.2020 | SI | 26.02.2020 | SK | 26.02.2020 | SM | 26.02.2020 | IE | 21.04.2020 | LU | 21.04.2020 | BG | 26.05.2020 | GR | 27.05.2020 | IS | 26.06.2020 | PT | 19.07.2020 | [2022/31] |
Former [2022/30] | HU | 21.04.2016 | |
AL | 26.02.2020 | ||
CY | 26.02.2020 | ||
CZ | 26.02.2020 | ||
EE | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
MT | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
IE | 21.04.2020 | ||
LU | 21.04.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2022/28] | HU | 21.04.2016 | |
CY | 26.02.2020 | ||
CZ | 26.02.2020 | ||
EE | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
MT | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
IE | 21.04.2020 | ||
LU | 21.04.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2021/20] | CZ | 26.02.2020 | |
EE | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
IE | 21.04.2020 | ||
LU | 21.04.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2021/13] | CZ | 26.02.2020 | |
EE | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
LU | 21.04.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2021/08] | CZ | 26.02.2020 | |
EE | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
LU | 21.04.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/52] | CZ | 26.02.2020 | |
EE | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/50] | CZ | 26.02.2020 | |
EE | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/49] | CZ | 26.02.2020 | |
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/48] | HR | 26.02.2020 | |
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/47] | HR | 26.02.2020 | |
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/40] | HR | 26.02.2020 | |
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/39] | HR | 26.02.2020 | |
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
BG | 26.05.2020 | ||
GR | 27.05.2020 | ||
Former [2020/38] | HR | 26.02.2020 | |
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
GR | 27.05.2020 | ||
Former [2020/37] | HR | 26.02.2020 | |
LV | 26.02.2020 | ||
RS | 26.02.2020 | Cited in | International search | [Y]WO2006107647 (LUCENT TECHNOLOGIES INC [US]) [Y] 1-5,11-15 * paragraph [0009] - paragraph [0011]; figure 1 * * paragraph [0034]; figure 2 *; | [A]WO2012090116 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [A] 1-15 * page 7, line 21 - page 8, line 11; figure 1 *; | [A]US2014265919 (POPE DANIEL J [US], et al) [A] 1-15* paragraph [0005] - paragraph [0007] *; | [Y]WO2015049412 (CASAMBI TECHNOLOGIES OY [FI]) [Y] 1-5,11-15 * page 2, line 19 - page 3, line 2 * * page 12, line 6 - line 12; figure 1 * * page 13, line 11 - line 17 * * page 14, line 31 - page 34 * * page 15, line 17 - line 20 * | Opposition | US2007268680 | US7656747 | WO2013123945 | US2013342111 | WO2014009880 | US2014203939 | CA2913892 | US2014380443 | WO2015000803 |