blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3349947

EP3349947 - COMMUNICATION UNIT FOR AN ELECTRICAL MACHINE TOOL, ELECTRICAL MACHINE TOOL SYSTEM AND METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.05.2021
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  19.06.2020
FormerGrant of patent is intended
Status updated on  29.04.2020
FormerRequest for examination was made
Status updated on  22.06.2018
FormerThe international publication has been made
Status updated on  25.03.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
[2020/18]
Former [2018/30]For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
Inventor(s)01 / SZELL, Istvan
Lilienstr. 17
70771 Leinfelden-Echterdingen / DE
 [2018/30]
Application number, filing date16763242.107.09.2016
[2018/30]
WO2016EP71037
Priority number, dateDE20151021782617.09.2015         Original published format: DE102015217826
[2018/30]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2017045980
Date:23.03.2017
Language:DE
[2017/12]
Type: A1 Application with search report 
No.:EP3349947
Date:25.07.2018
Language:DE
The application published by WIPO in one of the EPO official languages on 23.03.2017 takes the place of the publication of the European patent application.
[2018/30]
Type: B1 Patent specification 
No.:EP3349947
Date:22.07.2020
Language:DE
[2020/30]
Search report(s)International search report - published on:EP23.03.2017
ClassificationIPC:B25F5/00
[2018/30]
CPC:
B25F5/00 (EP,US); H04B11/00 (US); B25B21/00 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/30]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:KOMMUNIKATIONSEINRICHTUNG FÜR EINE ELEKTRISCHE WERKZEUGMASCHINE, ELEKTROWERKZEUGSYSTEM UND VERFAHREN[2018/30]
English:COMMUNICATION UNIT FOR AN ELECTRICAL MACHINE TOOL, ELECTRICAL MACHINE TOOL SYSTEM AND METHOD[2018/30]
French:DISPOSITIF DE COMMUNICATION POUR UNE MACHINE-OUTIL ÉLECTRIQUE, SYSTÈME D'OUTIL ÉLECTRIQUE ET PROCÉDÉ[2018/30]
Entry into regional phase17.04.2018National basic fee paid 
17.04.2018Designation fee(s) paid 
17.04.2018Examination fee paid 
Examination procedure12.03.2018Date on which the examining division has become responsible
17.04.2018Examination requested  [2018/30]
07.11.2018Amendment by applicant (claims and/or description)
30.04.2020Communication of intention to grant the patent
08.06.2020Fee for grant paid
08.06.2020Fee for publishing/printing paid
08.06.2020Receipt of the translation of the claim(s)
Opposition(s)23.04.2021No opposition filed within time limit [2021/26]
Fees paidRenewal fee
01.10.2018Renewal fee patent year 03
30.09.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.09.2016
AL22.07.2020
CY22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
MK22.07.2020
MT22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
TR22.07.2020
IE07.09.2020
LU07.09.2020
FR22.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG22.10.2020
GB22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
[2022/32]
Former [2022/28]HU07.09.2016
AL22.07.2020
CY22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
MT22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
TR22.07.2020
IE07.09.2020
LU07.09.2020
FR22.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG22.10.2020
GB22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2022/27]HU07.09.2016
AL22.07.2020
CY22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
MT22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
TR22.07.2020
IE07.09.2020
LU07.09.2020
FR22.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG22.10.2020
GB22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/38]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
IE07.09.2020
LU07.09.2020
FR22.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG22.10.2020
GB22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/37]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
IE07.09.2020
LU07.09.2020
FR22.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/36]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
LU07.09.2020
FR22.09.2020
BE30.09.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/35]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SK22.07.2020
SM22.07.2020
LU07.09.2020
FR22.09.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/28]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SK22.07.2020
SM22.07.2020
LU07.09.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/27]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SM22.07.2020
LU07.09.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/25]AL22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/22]CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/20]DK22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
IT22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RS22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/17]ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RS22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/10]ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
PL22.07.2020
RS22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/09]ES22.07.2020
FI22.07.2020
LT22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
PT23.11.2020
Former [2021/08]ES22.07.2020
FI22.07.2020
LT22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
PT23.11.2020
Former [2021/07]FI22.07.2020
LT22.07.2020
NO22.10.2020
Cited inInternational search[A]EP1136188  (MAKITA CORP [JP]) [A] 1-9* paragraphs [0110] - [0117]; figure - *;
 [XI]DE102013211228  (BOSCH GMBH ROBERT [DE]) [X] 1-6 * paragraphs [0023] - [0026] - [0029]; figure - * [I] 9;
 [I]WO2014198679  (ATLAS COPCO IND TECH AB [SE]) [I] 1,4-6 * pages 6,8,9; figure - *;
 [A]EP2868437  (HILTI AG [LI]) [A] 1-9 * paragraphs [0022] - [0028]; figure - *
ExaminationJPH04169000
 JP2006067726
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.