blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3309490

EP3309490 - COOLING TOWER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.03.2020
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  05.04.2019
FormerGrant of patent is intended
Status updated on  20.12.2018
FormerRequest for examination was made
Status updated on  27.07.2018
FormerThe application has been published
Status updated on  22.03.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Hamon Thermal Europe S.A.
Axisparc
Rue Emile Francqui 2
1435 Mont-St-Guibert / BE
[2018/16]
Inventor(s)01 / Ganzitti, Vincent
c/o Hamon Thermal Europe S.A.
Axisparc, Rue Emile Francqui 2
B-1435 Mont-ST-Guibert / BE
 [2018/16]
Representative(s)Powis de Tenbossche, Roland, et al
Cabinet Bede S.A.
Boulevard Général Wahis 15
1030 Bruxelles / BE
[2018/16]
Application number, filing date17020424.215.09.2017
[2018/16]
Priority number, dateBE2016000015513.10.2016         Original published format: BE 201600155
[2018/16]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3309490
Date:18.04.2018
Language:FR
[2018/16]
Type: B1 Patent specification 
No.:EP3309490
Date:08.05.2019
Language:FR
[2019/19]
Search report(s)(Supplementary) European search report - dispatched on:EP19.02.2018
ClassificationIPC:F28C1/02, F28C1/10
[2018/16]
CPC:
F28C1/02 (EP); F28C1/10 (EP); Y02B30/70 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/31]
Former [2018/16]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:KÜHLTURM[2018/16]
English:COOLING TOWER[2018/16]
French:TOUR DE REFROIDISSEMENT[2018/16]
Examination procedure15.09.2017Date on which the examining division has become responsible
26.07.2018Examination requested  [2018/35]
21.12.2018Communication of intention to grant the patent
29.03.2019Fee for grant paid
29.03.2019Fee for publishing/printing paid
29.03.2019Receipt of the translation of the claim(s)
Opposition(s)11.02.2020No opposition filed within time limit [2020/16]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.09.2017
AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
MK08.05.2019
MT08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
IE15.09.2019
LU15.09.2019
[2022/32]
Former [2021/34]HU15.09.2017
AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
MT08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
IE15.09.2019
LU15.09.2019
Former [2021/32]HU15.09.2017
AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
IE15.09.2019
LU15.09.2019
Former [2021/31]AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
IE15.09.2019
LU15.09.2019
Former [2021/26]AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
IE15.09.2019
LU15.09.2019
Former [2020/36]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
IE15.09.2019
LU15.09.2019
Former [2020/35]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
LU15.09.2019
Former [2020/25]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/17]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/14]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
SM08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/12]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/11]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/10]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/09]AL08.05.2019
CZ08.05.2019
DK08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RS08.05.2019
SE08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2019/51]AL08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RS08.05.2019
SE08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2019/50]AL08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RS08.05.2019
SE08.05.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2019/49]AL08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
NL08.05.2019
SE08.05.2019
NO08.08.2019
PT08.09.2019
Former [2019/48]ES08.05.2019
FI08.05.2019
LT08.05.2019
SE08.05.2019
NO08.08.2019
PT08.09.2019
Former [2019/47]ES08.05.2019
FI08.05.2019
LT08.05.2019
NO08.08.2019
Documents cited:Search[A]JPS51101250  (NIPPON STEEL CORP) [A] 1-15* figures 1-2 *;
 [A]JPS51147040  (TAKASAGO THERMAL ENGINEERING) [A] 1-15 * figures 1,6 *;
 [A]JPS52103050  (TAKASAGO THERMAL ENGINEERING) [A] 1-15 * figures 1-2 *;
 [A]JPS52132441U  (UTSUNO) [A] 1-15 * figures 1-3 *;
 [A]JPS5736468U  (TAKAO) [A] 1-15 * paragraph [0008]; figures 1,6 *;
 [A]DE3121467  (WURZ DIETER PROF DR-ING) [A] 1-15 * figures 1,2 *;
 [A]DE3327932  (HAMON SOBELCO KUEHLTUERME UND [DE]) [A] 1-15 * figures 1-3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.