| EP3208789 - METHOD OF PROTECTING A CIRCUIT AGAINST A SIDE-CHANNEL ANALYSIS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.06.2021 Database last updated on 08.04.2026 | |
| Former | The patent has been granted Status updated on 03.07.2020 | ||
| Former | Grant of patent is intended Status updated on 04.03.2020 | ||
| Former | Examination is in progress Status updated on 10.08.2018 | ||
| Former | Request for examination was made Status updated on 16.02.2018 | ||
| Former | The application has been published Status updated on 21.07.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states ESHARD Technopole Bordeaux Montesquieu 1 Allée Jean Rostand 33650 Martillac / FR | [2017/34] | Inventor(s) | 01 /
THIEBEAULD DE LA CROUEE, Hugues ESHARD 13, rue Massenet 33600 Pessac / FR | 02 /
WURCKER, Antoine ESHARD 5 rue Laurent Fignon 33140 VILLENAVE D'ORNON / FR | [2017/34] | Representative(s) | de Roquemaurel, Bruno, et al Omnipat 24 place des Martyrs de la Résistance 13100 Aix en Provence / FR | [2017/34] | Application number, filing date | 17156289.5 | 15.02.2017 | [2017/34] | Priority number, date | FR20160051443 | 22.02.2016 Original published format: FR 1651443 | FR20160051444 | 22.02.2016 Original published format: FR 1651444 | FR20160051445 | 22.02.2016 Original published format: FR 1651445 | [2017/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3208789 | Date: | 23.08.2017 | Language: | EN | [2017/34] | Type: | B1 Patent specification | No.: | EP3208789 | Date: | 05.08.2020 | Language: | EN | [2020/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.07.2017 | Classification | IPC: | G09C1/00, H04L9/00 | [2017/34] | CPC: |
H04L9/003 (EP,CN,KR,US);
G01R31/2851 (CN);
G01R31/31719 (EP,US);
G06F21/556 (CN);
G06F21/72 (US);
G09C1/00 (EP,US);
H04L9/002 (CN,US);
H04L9/0625 (CN);
H04L9/0631 (CN);
H04L9/0656 (CN);
H04L9/3242 (US);
H04L9/3247 (US);
H04L9/3249 (US);
H04L9/3252 (US);
G06F21/75 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/12] |
| Former [2017/34] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUM SCHUTZ EINER SCHALTUNG GEGEN EINE SEITENKANALANALYSE | [2017/34] | English: | METHOD OF PROTECTING A CIRCUIT AGAINST A SIDE-CHANNEL ANALYSIS | [2017/34] | French: | PROCÉDÉ DE PROTECTION D'UN CIRCUIT CONTRE UNE ANALYSE PAR CANAUX AUXILIAIRES | [2020/14] |
| Former [2017/34] | PROCEDE DE PROTECTION D'UN CIRCUIT CONTRE UNE ANALYSE PAR CANAUX AUXILIAIRES | Examination procedure | 15.02.2017 | Date on which the examining division has become responsible | 07.02.2018 | Amendment by applicant (claims and/or description) | 07.02.2018 | Examination requested [2018/12] | 09.08.2018 | Despatch of a communication from the examining division (Time limit: M04) | 29.11.2018 | Reply to a communication from the examining division | 10.04.2019 | Despatch of a communication from the examining division (Time limit: M06) | 10.10.2019 | Reply to a communication from the examining division | 05.03.2020 | Communication of intention to grant the patent | 25.06.2020 | Fee for grant paid | 25.06.2020 | Fee for publishing/printing paid | 25.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 07.05.2021 | No opposition filed within time limit [2021/28] | Fees paid | Renewal fee | 25.02.2019 | Renewal fee patent year 03 | 25.02.2020 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.02.2017 | AL | 05.08.2020 | AT | 05.08.2020 | CY | 05.08.2020 | CZ | 05.08.2020 | DK | 05.08.2020 | EE | 05.08.2020 | ES | 05.08.2020 | FI | 05.08.2020 | HR | 05.08.2020 | IT | 05.08.2020 | LT | 05.08.2020 | LV | 05.08.2020 | MC | 05.08.2020 | MK | 05.08.2020 | MT | 05.08.2020 | NL | 05.08.2020 | PL | 05.08.2020 | RO | 05.08.2020 | RS | 05.08.2020 | SE | 05.08.2020 | SI | 05.08.2020 | SK | 05.08.2020 | SM | 05.08.2020 | TR | 05.08.2020 | BG | 05.11.2020 | NO | 05.11.2020 | GR | 06.11.2020 | IS | 05.12.2020 | PT | 07.12.2020 | IE | 15.02.2021 | LU | 15.02.2021 | BE | 28.02.2021 | CH | 28.02.2021 | LI | 28.02.2021 | [2024/41] |
| Former [2024/29] | HU | 15.02.2017 | |
| AL | 05.08.2020 | ||
| AT | 05.08.2020 | ||
| CY | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| IT | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| MC | 05.08.2020 | ||
| MK | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SI | 05.08.2020 | ||
| SK | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| TR | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| IE | 15.02.2021 | ||
| LU | 15.02.2021 | ||
| BE | 28.02.2021 | ||
| CH | 28.02.2021 | ||
| LI | 28.02.2021 | ||
| Former [2024/22] | HU | 15.02.2017 | |
| AL | 05.08.2020 | ||
| AT | 05.08.2020 | ||
| CY | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| IT | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| MC | 05.08.2020 | ||
| MK | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SI | 05.08.2020 | ||
| SK | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| IE | 15.02.2021 | ||
| LU | 15.02.2021 | ||
| BE | 28.02.2021 | ||
| CH | 28.02.2021 | ||
| LI | 28.02.2021 | ||
| Former [2023/30] | HU | 15.02.2017 | |
| AL | 05.08.2020 | ||
| AT | 05.08.2020 | ||
| CY | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| IT | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| MC | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SI | 05.08.2020 | ||
| SK | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| IE | 15.02.2021 | ||
| LU | 15.02.2021 | ||
| BE | 28.02.2021 | ||
| CH | 28.02.2021 | ||
| LI | 28.02.2021 | ||
| Former [2023/27] | HU | 15.02.2017 | |
| AL | 05.08.2020 | ||
| AT | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| IT | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| MC | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SI | 05.08.2020 | ||
| SK | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| IE | 15.02.2021 | ||
| LU | 15.02.2021 | ||
| BE | 28.02.2021 | ||
| CH | 28.02.2021 | ||
| LI | 28.02.2021 | ||
| Former [2022/34] | AL | 05.08.2020 | |
| AT | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| IT | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| MC | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SI | 05.08.2020 | ||
| SK | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| IE | 15.02.2021 | ||
| LU | 15.02.2021 | ||
| BE | 28.02.2021 | ||
| CH | 28.02.2021 | ||
| LI | 28.02.2021 | ||
| Former [2022/07] | AL | 05.08.2020 | |
| AT | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| IT | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| MC | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SI | 05.08.2020 | ||
| SK | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| IE | 15.02.2021 | ||
| LU | 15.02.2021 | ||
| CH | 28.02.2021 | ||
| LI | 28.02.2021 | ||
| Former [2021/47] | AL | 05.08.2020 | |
| AT | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| IT | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| MC | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SI | 05.08.2020 | ||
| SK | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| LU | 15.02.2021 | ||
| CH | 28.02.2021 | ||
| LI | 28.02.2021 | ||
| Former [2021/41] | AL | 05.08.2020 | |
| AT | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| IT | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| MC | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SI | 05.08.2020 | ||
| SK | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| Former [2021/36] | AL | 05.08.2020 | |
| AT | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| IT | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SI | 05.08.2020 | ||
| SK | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| Former [2021/34] | AL | 05.08.2020 | |
| AT | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| IT | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SK | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| Former [2021/28] | AL | 05.08.2020 | |
| AT | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SK | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| Former [2021/25] | AL | 05.08.2020 | |
| AT | 05.08.2020 | ||
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| Former [2021/22] | AT | 05.08.2020 | |
| CZ | 05.08.2020 | ||
| DK | 05.08.2020 | ||
| EE | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RO | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| SM | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| Former [2021/21] | AT | 05.08.2020 | |
| DK | 05.08.2020 | ||
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| Former [2021/12] | AT | 05.08.2020 | |
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| NL | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| Former [2021/10] | AT | 05.08.2020 | |
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| HR | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| LV | 05.08.2020 | ||
| PL | 05.08.2020 | ||
| RS | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| IS | 05.12.2020 | ||
| PT | 07.12.2020 | ||
| Former [2021/09] | AT | 05.08.2020 | |
| ES | 05.08.2020 | ||
| FI | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| GR | 06.11.2020 | ||
| PT | 07.12.2020 | ||
| Former [2021/08] | ES | 05.08.2020 | |
| FI | 05.08.2020 | ||
| LT | 05.08.2020 | ||
| SE | 05.08.2020 | ||
| BG | 05.11.2020 | ||
| NO | 05.11.2020 | ||
| PT | 07.12.2020 | ||
| Former [2021/07] | FI | 05.08.2020 | |
| LT | 05.08.2020 | ||
| NO | 05.11.2020 | Documents cited: | Search | [Y] US2003223580 (SNELL DORIAN L et al.) | [IAY] JACQUES FOURNIER ET AL: "Design and characterisation of an AES chip embedding countermeasures", INTERNATIONAL JOURNAL OF INTELLIGENT ENGINEERING INFORMATICS, 1 January 2011 (2011-01-01), pages 328, XP055319803, Retrieved from the Internet DOI: http://dx.doi.org/10.1504/IJIEI.2011.044101 | [IY] JOYE M ET AL: "Strengthening hardware AES implementations against fault attacks", 20070910, vol. 1, no. 3, 10 September 2007 (2007-09-10), pages 106 - 110, XP006029490 | [IAY] FRAIDY BOUESSE ET AL: "Path Swapping Method to Improve DPA Resistance of Quasi Delay Insensitive Asynchronous Circuits", 10 October 2006, CRYPTOGRAPHIC HARDWARE AND EMBEDDED SYSTEMS - CHES 2006 LECTURE NOTES IN COMPUTER SCIENCE;;LNCS, SPRINGER, BERLIN, DE, PAGE(S) 384 - 398, ISBN: 978-3-540-46559-1, XP047029591 | by applicant | P. C. KOCHER: "Advances in Cryptology - CRYPTO '96", vol. 1109, 1996, SPRINGER, article "Timing attacks on implementations of Diffie-Hellman, RSA, DSS, and other systems", pages: 104 - 113 | P. C. KOCHER; J. JAFFE; B. JUN: "Advances in Cryptology - CRYPTO '99", vol. 1666, 1999, SPRINGER, article "Differential Power Analysis", pages: 388 - 397 | E. BRIER; C. CLAVIER; F. OLIVIER: "Cryptographic Hardware and Embedded Systems - CHES 2004", vol. 3156, 2004, SPRINGER, article "Correlation Power Analysis with a Leakage Model", pages: 16 - 29 | J.-J. QUISQUATER: "Smart Card Programming and Security", vol. 2140, 2001, SPRINGER, article "ElectroMagnetic Analysis (EMA): Measures and Counter-measures for Smart Cards", pages: 200 - 210 | S. CHARI; J. R. RAO; P. ROHATGI: "CHES 2002", vol. 2523, 2003, SPRINGER, article "Template Attacks", pages: 172 - 186 | B. GIERLICHS; L. BATINA; P. TUYLS; B. PRENEEL: "CHES 2008", vol. 5154, 2008, SPRINGER, article "Mutual Information Analysis", pages: 426 - 442 | E. BIHAM: "A fast new DES implementation in software", FAST SOFTWARE ENCRYPTION, vol. 1267, 2006, pages 260 - 272 | C. REBEIRO; D. SELVAKUMAR: "Bitslice Implementation of AES", A. S. L. DEVI CRYPTOLOGY AND NETWORK SECURITY, vol. 4301, 2006, pages 203 - 212, XP019051490 | M. AGOYAN; S. BOUQUET; J.-M. DUTERTRE; J. FOURNIER; J.-B. RIGAUD; B.ROBISSON; A. TRIA: "Design and characterization of an AES chip embedding countermeasures", INTERNATIONAL JOURNAL OF INTELLIGENT ENGINEERING INFORMATICS, 2011, pages 328, XP055319803, DOI: doi:10.1504/IJIEI.2011.044101 DOI: http://dx.doi.org/10.1504/IJIEI.2011.044101 | M. JOYE; P. MANET; J.-B. RIGAUD: "Strengthening hardware AES implementation against fault attacks", IET INFORMATION SECURITY, vol. 1, no. 3, 2007, pages 106 - 110, XP006029490 | F. BOUESSE; G. SICARD; M. RENAUDIN: "Path Swapping Method to Improve DPA Resistance of Quasi Delay Insensitive Asynchronous Circuits", CHES 2006, LNCS, vol. 4249, 2006, pages 384 - 398 |